[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940842":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},940842,608,1,"单选题","在使用成本和费用估算的方法的时候，期间费用不包括()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","其他管理费用",false,{"key":16,"text":17,"correct":14},"B","财务费用",{"key":19,"text":20,"correct":21},"C","折旧费用",true,{"key":23,"text":24,"correct":14},"D","其他营业费用","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]