[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940841":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},940841,608,1,"单选题","当项目效果不能或难于货币量化时，或货币量化的效果不是项目目标的主体时，在经济分析中可采用()方法，并将其结论作为项目投资决策的依据。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","有无对比分析",false,{"key":16,"text":17,"correct":14},"B","敏感性分析",{"key":19,"text":20,"correct":14},"C","偿债能力分析",{"key":22,"text":23,"correct":24},"D","费用效果分析",true,"",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]