[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940837":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},940837,608,1,"单选题","以下关于规模总投资的说法，正确的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","规模总投资即项目总投资",false,{"key":16,"text":17,"correct":14},"B","规模总投资包括建设投资、建设期利息和流动资金",{"key":19,"text":20,"correct":21},"C","财务分析中都采用项目总投资概念",true,{"key":23,"text":24,"correct":14},"D","经济分析中都采用规模总投资概念","⑼总投资估算 项目总投资，包括建设投资、建设期利息和流动资金。 适用于外商投资项目、境外投资项目和自主决策或公司审批的投资项目，当需要向有关政府部门报批项目时(外商投资项目除外)，还需计算规模总投资，即报批项目总投资，包括建设投资、建设期利息和铺底流动资金。 无论项目是否需要向政府报批，财务分析中都采用上述项目总投资概念。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]