[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940814":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},940814,608,1,"单选题","一般可行性研究报告中的融资成本分析，可只作()分析。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","债务资金成本",true,{"key":16,"text":17,"correct":18},"B","权益资本成本",false,{"key":20,"text":21,"correct":18},"C","边际资金成本",{"key":23,"text":24,"correct":18},"D","加权平均资金成本","",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]