[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940812":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},940812,608,2,"多选题","()是“有无对比”分析的关键。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","界定项目范围",true,{"key":16,"text":17,"correct":14},"B","准确分析“无项目”状态",{"key":19,"text":20,"correct":21},"C","准确分析“有项目”状态",false,{"key":23,"text":24,"correct":21},"D","准确分析还款资金的自足性",{"key":26,"text":27,"correct":21},"E","明确项目对既有企业绩效的改善程度","AB","",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]