[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940741":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},940741,608,1,"单选题","(2018年真题)开展项目后评价时，项目建设准备阶段需评价的内容是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","釆购招标评价",true,{"key":16,"text":17,"correct":18},"B","可行性研究评价",false,{"key":20,"text":21,"correct":18},"C","资金使用评价",{"key":23,"text":24,"correct":18},"D","竣工验收评价","本题考查的是项目建设全过程回顾与评价。项目建设准备阶段评价：勘察设计、融资方案、采购招标、合同签订和开工准备。选项B 属于项目前期策划与决策阶段；选项C 属于项目建设实施阶段；选项D 属于项目投产运营阶段。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]