[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940723":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},940723,608,1,"单选题","(2009年真题) 投资项目经济评价的动态分析，强调对项目整个计算期内的费用与效益进行(）分析。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","盈利能力",false,{"key":16,"text":17,"correct":14},"B","投入产出",{"key":19,"text":20,"correct":14},"C","净现金流量",{"key":22,"text":23,"correct":24},"D","折现现金流量",true,"",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]