[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940680":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},940680,608,2,"多选题","(2018年真题)关于采用投资回收期指标进行方案评价的说法，正确的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","投资回收期考虑了方案整个寿命期的收益，比较客观",false,{"key":16,"text":17,"correct":14},"B","投资回收期小于基准投资回收期是项目可行的充分条件",{"key":19,"text":20,"correct":21},"C","投资回收期不能反应项自投资回收之后的情况",true,{"key":23,"text":24,"correct":14},"D","投资回收期越短，说明项目效益越好",{"key":26,"text":27,"correct":21},"E","动态投资回收期是项目净现金流量累计现值等于零所需要的时间","CE","本题考查的是建设方案的经济比选。选项A 错误，投资回收期没有全面的考虑投资方案整个计算期内的现金流量，即只考虑回收之前的效果，不能反映投资回收之后的情况。选项B 错误，投资回收期作为方案选择和项目排队的评价准则是不可靠的，它只能作为辅助评价指标，或与其他评价方法结合使用。@##",{"id":6,"name":31,"category":32,"favorite":33},"项目决策分析与评价","建筑工程",0]