[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940667":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},940667,608,1,"单选题","(2012年真题) 投资项目建设方案所采用的高新技术，应符合先进性、创新性、成熟性和0的要求。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","唯一性",false,{"key":16,"text":17,"correct":14},"B","垄断性",{"key":19,"text":20,"correct":21},"C","实用性",true,{"key":23,"text":24,"correct":14},"D","独特性","采用高新技术应符合先进性、创新性、成熟性和实用性的要求。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]