[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940659":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},940659,608,1,"单选题","(2018年真题)政府和社会资本合作（PPP）项目物有所值评价中采取PPP值PSC 值进行比较，其中PSC 值的确定一般应参照（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目的建设和运营维护净成本，竞争性中立调整值、项目全部风险成本",true,{"key":16,"text":17,"correct":18},"B","项目的建设成本，竞争性中立调整值，项目全部风险成本",false,{"key":20,"text":21,"correct":18},"C","项目的建设和运营维护净成本，竞争性中立调整值，社会资本的风险成本",{"key":23,"text":24,"correct":18},"D","项目的建设成本、竞争性中立调整值，政府自留的风险成本","本题考查的是物有所值与财政承受能力论证。PSC 值是以下三项成本的全生命周期现值之和：1）参照项目的建设和运营维护净成本；2）竞争性中立调整值；3）项目全部风险成本。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]