[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940654":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},940654,608,1,"单选题","(2018年真题)关于项目评估质量控制的说法，正确的是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目评话质量控制的目的是确保咨询项目通过评审",false,{"key":16,"text":17,"correct":14},"B","项目评估质量控制工作的第一步是验收顾客提供的资料",{"key":19,"text":20,"correct":14},"C","项目评估质量控制的流程的最终环节是组织专家评审",{"key":22,"text":23,"correct":24},"D","项目评估质量控制的工作重点之一是配备合格的项目经理",true,"本题考查的是项目评估质量控制的目的、重要性和流程。选项A，项目评估质量控制的目的，是通过对咨询评估工作中直接影响产品质量的主要过程和关键环节实施控制，确保咨询评价结论和意见建议的公平公正、科学合理，并符合相关规定要求。选项B，第一步是接受委托。选项C，最终环节是咨询工作总结。",{"id":6,"name":27,"category":28,"favorite":29},"项目决策分析与评价","建筑工程",0]