[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940409":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},940409,607,2,"多选题","总体规划编制前，必须认真做好( )等前期工作。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","基础调查",true,{"key":16,"text":17,"correct":14},"B","信息搜集",{"key":19,"text":20,"correct":14},"C","课题研究",{"key":22,"text":23,"correct":14},"D","纳入规划重大项目的论证",{"key":25,"text":26,"correct":27},"E","与国家总体规划进行衔接",false,"ABCD","总体规划编制规划前，必须认真做好基础调查、信息搜集、课题研究以及纳入规划重大项目的论证等前期工作，及时与有关方面进行沟通协调。",{"id":6,"name":31,"category":32,"favorite":33},"宏观经济政策与发展规划","建筑工程",0]