[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940118":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},940118,607,1,"单选题","根据我国关于建设工程合同的规定，下列说法中错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包单位经发包方同意，可以将自己承包的部分工作交由第三方完成",false,{"key":16,"text":17,"correct":18},"B","建设工程主体结构的施工可以采取分包方式完成",true,{"key":20,"text":21,"correct":14},"C","分包单位不得将其承包的工程再分包",{"key":23,"text":24,"correct":14},"D","禁止承包方将工程分包给不具备相应资质条件的单位","工程主体结构的施工必须由承包方自行完成。",{"id":6,"name":27,"category":28,"favorite":29},"宏观经济政策与发展规划","建筑工程",0]