[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940113":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},940113,607,1,"单选题","按资本金制度规定，投资项目资本金缴纳方式是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","一次认缴、一次到位",false,{"key":16,"text":17,"correct":14},"B","逐年认缴，逐年到位",{"key":19,"text":20,"correct":14},"C","一次认缴，并根据实际的建设进度按比例逐年到位",{"key":22,"text":23,"correct":24},"D","一次认缴，并根据批准的建设进度按比例逐年到位",true,"投资项目资本金缴纳方式是一次认缴，并根据批准的建设进度按比例逐年到位。",{"id":6,"name":27,"category":28,"favorite":29},"宏观经济政策与发展规划","建筑工程",0]