[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-940087":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},940087,607,1,"单选题","建立健全“三个清单”动态管理机制，根据情况变化适时调整。“三个清单”不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","负面清单制度",false,{"key":16,"text":17,"correct":14},"B","权力清单制度",{"key":19,"text":20,"correct":21},"C","项目清单制度",true,{"key":23,"text":24,"correct":14},"D","责任清单制度","建立健全“三个清单”动态管理机制，根据情况变化适时调整。及时修订并公布政府核准的投资项目目录，实行企业投资项目管理负面清单制度，建立企业投资项目管理权力清单制度和责任清单制度。",{"id":6,"name":27,"category":28,"favorite":29},"宏观经济政策与发展规划","建筑工程",0]