[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":670},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,9,50,1948,[13,38,53,68,78,93,107,119,131,143,155,167,179,191,203,215,227,239,251,263,275,283,295,307,315,330,345,360,374,389,404,419,433,448,463,478,490,504,518,533,548,560,574,588,600,612,626,638,650,662],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},938073,2,"多选题","（2014年真题）根据中国工程咨询协会《工程咨询成果质量评价办法》，对工业项目可行性研究报告进行风险分析情况综合评价时，需要评价的内容有( )",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","经营风险分析情况",true,{"key":24,"text":25,"correct":22},"B","管理风险分析情况",{"key":27,"text":28,"correct":29},"C","减少风险分析情况",false,{"key":31,"text":32,"correct":22},"D","财务、金融风险分析情况",{"key":34,"text":35,"correct":22},"E","政策风险分析情况","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},938074,"（2017年真题）设计管理工作划分为六个阶段，其中设计阶段的工作内容( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目方案设计",{"key":24,"text":45,"correct":22},"项目初步设计",{"key":27,"text":47,"correct":29},"项目竣工验收与竣工图",{"key":31,"text":49,"correct":22},"项目施工图设计",{"key":34,"text":51,"correct":29},"项目后评价","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},938075,"（2008年真题）下列关于试运行质量管理的表述中，正确的有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"业主方应负责试运行现场的准备工作",{"key":24,"text":60,"correct":29},"承包方负责落实原材料的供应",{"key":27,"text":62,"correct":22},"试运行岗位人员应经过培训并考核合格",{"key":31,"text":64,"correct":22},"试运行一般分阶段进行",{"key":34,"text":66,"correct":22},"试运行工作应由业主方组织进行","CDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},938076,"（2014年真题）根据中国工程咨询协会对工业项目可行性研究报告进行风险分析情况综合评 价时，需要评价的内容有（ ）。",[72,73,74,76,77],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":75,"correct":29},"建设风险分析情况",{"key":31,"text":32,"correct":22},{"key":34,"text":35,"correct":22},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":92,"analysis":37},938077,"（2018年真题）分部工程质量验收合格应满足的要求有（ ）。",[82,84,86,88,90],{"key":20,"text":83,"correct":22},"观感质量符合要求",{"key":24,"text":85,"correct":22},"质量控制资料完整",{"key":27,"text":87,"correct":29},"所含分项工程的90%以上质量验收合格",{"key":31,"text":89,"correct":29},"所检验工程具备运行条件",{"key":34,"text":91,"correct":22},"主要使用功能的抽样检验结果符合相应规定","ABE",{"id":94,"libraryId":5,"type":95,"typeLabel":96,"stem":97,"options":98,"answer":24,"analysis":37},938078,1,"单选题","（2012年真题）某工程项目发生事故造成 5 人死亡，直接经济损失 6000 万元，该事故应确定为( )。",[99,101,103,105],{"key":20,"text":100,"correct":29},"特别重大事故",{"key":24,"text":102,"correct":22},"重大事故",{"key":27,"text":104,"correct":29},"较大事故",{"key":31,"text":106,"correct":29},"一般事故",{"id":108,"libraryId":5,"type":95,"typeLabel":96,"stem":109,"options":110,"answer":20,"analysis":37},938079,"（2017年真题）根据《生产安全事故报告和调查处理条例》，生产安全事故发生后，单位负责应当在接到报告后( )，向事故发生的县级以上人民政府安全生产监督部门和负有安全生产监督管理职责的有关部门报告。",[111,113,115,117],{"key":20,"text":112,"correct":22},"1小时内",{"key":24,"text":114,"correct":29},"2小时内",{"key":27,"text":116,"correct":29},"8小时内",{"key":31,"text":118,"correct":29},"12小时内",{"id":120,"libraryId":5,"type":95,"typeLabel":96,"stem":121,"options":122,"answer":24,"analysis":37},938080,"（2012年真题）工程项目初步设计中的安全报告的内容不包括( )。",[123,125,127,129],{"key":20,"text":124,"correct":29},"总平面布置",{"key":24,"text":126,"correct":22},"安全对策措施建设",{"key":27,"text":128,"correct":29},"卫生保健设施",{"key":31,"text":130,"correct":29},"地质安全影响因素",{"id":132,"libraryId":5,"type":95,"typeLabel":96,"stem":133,"options":134,"answer":24,"analysis":37},938081,"（2018年真题）关于绿色设计及其内容、方法的说法，正确的是( )",[135,137,139,141],{"key":20,"text":136,"correct":29},"绿色设计是以工程项目全生命周期成本的最小化为目标",{"key":24,"text":138,"correct":22},"绿色设计应使所设计的产品满足绿色产品要求",{"key":27,"text":140,"correct":29},"可拆卸设计的目的是为了减少零件的种类",{"key":31,"text":142,"correct":29},"循环设计的目的是便于后期维修和降低使用成本",{"id":144,"libraryId":5,"type":95,"typeLabel":96,"stem":145,"options":146,"answer":27,"analysis":37},938082,"（2014年真题）工程项目的绿色施工方案应包括( )",[147,149,151,153],{"key":20,"text":148,"correct":29},"提高质量标准措施",{"key":24,"text":150,"correct":29},"降低成本措施",{"key":27,"text":152,"correct":22},"节地措施",{"key":31,"text":154,"correct":29},"提前竣工措施",{"id":156,"libraryId":5,"type":95,"typeLabel":96,"stem":157,"options":158,"answer":24,"analysis":37},938083,"（2018年真题）根据《职业健康安全管理体系》，不属于运行要素的是( )。",[159,161,163,165],{"key":20,"text":160,"correct":29},"变更管理",{"key":24,"text":162,"correct":22},"管理评审",{"key":27,"text":164,"correct":29},"外包",{"key":31,"text":166,"correct":29},"应急准备和响应",{"id":168,"libraryId":5,"type":95,"typeLabel":96,"stem":169,"options":170,"answer":27,"analysis":37},938084,"（2012年真题）在环境管理体系中，由项目组织的最高管理者制订，反映环境管理意图和原则的文件是( )",[171,173,175,177],{"key":20,"text":172,"correct":29},"计划文件",{"key":24,"text":174,"correct":29},"检查方案",{"key":27,"text":176,"correct":22},"环境方针",{"key":31,"text":178,"correct":29},"纠错计划",{"id":180,"libraryId":5,"type":95,"typeLabel":96,"stem":181,"options":182,"answer":31,"analysis":37},938085,"（2014年真题）职业健康安全与环境管理体系整体策划和设计阶段的主要工作不包括( )",[183,185,187,189],{"key":20,"text":184,"correct":29},"确定组织机构和职责",{"key":24,"text":186,"correct":29},"制订职业健康安全管理方针",{"key":27,"text":188,"correct":29},"为实施管理体系准备必要的资源",{"key":31,"text":190,"correct":22},"辨识工作场所的危险因素",{"id":192,"libraryId":5,"type":95,"typeLabel":96,"stem":193,"options":194,"answer":27,"analysis":37},938086,"（2013年真题）开展工程项目安全预评价工作，应根据( )选择相应的评价方法",[195,197,199,201],{"key":20,"text":196,"correct":29},"被评价对象的重要性",{"key":24,"text":198,"correct":29},"有害因素导致事故的可能性",{"key":27,"text":200,"correct":22},"被评价对象的特点",{"key":31,"text":202,"correct":29},"事故可能的严重程度",{"id":204,"libraryId":5,"type":95,"typeLabel":96,"stem":205,"options":206,"answer":27,"analysis":37},938087,"（2017年真题）在环境管理体系中，“信息交流”属于( )要素中的一项内容",[207,209,211,213],{"key":20,"text":208,"correct":29},"领导作用",{"key":24,"text":210,"correct":29},"策划",{"key":27,"text":212,"correct":22},"支持",{"key":31,"text":214,"correct":29},"运行",{"id":216,"libraryId":5,"type":95,"typeLabel":96,"stem":217,"options":218,"answer":27,"analysis":37},938088,"（2014年真题）在职业健康安全域环境管理体系要素中，方针是以文件方式表述出职业健康安全域环境管理的( )",[219,221,223,225],{"key":20,"text":220,"correct":29},"计划与规划",{"key":24,"text":222,"correct":29},"方法与手段",{"key":27,"text":224,"correct":22},"意图与原则",{"key":31,"text":226,"correct":29},"实施与运行",{"id":228,"libraryId":5,"type":95,"typeLabel":96,"stem":229,"options":230,"answer":20,"analysis":37},938089,"（2017年真题）根据《建设工程安全生产管理条例》，在申请领取施工许可证时应提供建设工程有关安全施工措施资料，这属于（ ）的安全责任。",[231,233,235,237],{"key":20,"text":232,"correct":22},"建设单位",{"key":24,"text":234,"correct":29},"设计单位",{"key":27,"text":236,"correct":29},"监理单位",{"key":31,"text":238,"correct":29},"施工单位",{"id":240,"libraryId":5,"type":95,"typeLabel":96,"stem":241,"options":242,"answer":31,"analysis":37},938090,"（2016年真题）下列关于建立安全生产责任制的要求，说法错误的是（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":29},"必须符合国家安全生产法律法规、政策和方针的要求，并要适时修订",{"key":24,"text":246,"correct":29},"要具有可操作性",{"key":27,"text":248,"correct":29},"责任制体系要与企业单位管理体制协调一致",{"key":31,"text":250,"correct":22},"要求用会议贯彻会议，用文件落实文件",{"id":252,"libraryId":5,"type":95,"typeLabel":96,"stem":253,"options":254,"answer":27,"analysis":37},938091,"（2016年真题）职业健康安全与环境管理体系的建立步骤中，人员培训之后的步骤是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":29},"体系策划与设计",{"key":24,"text":258,"correct":29},"成立工作小组",{"key":27,"text":260,"correct":22},"初始评审",{"key":31,"text":262,"correct":29},"文件发布和体系试运行",{"id":264,"libraryId":5,"type":95,"typeLabel":96,"stem":265,"options":266,"answer":27,"analysis":37},938092,"（2013年真题）健康、安全、环境（HS E）管理体系要素中的管理评审，是由（ ）进行的评审活动。",[267,269,271,273],{"key":20,"text":268,"correct":29},"专职HSE管理人员",{"key":24,"text":270,"correct":29},"基层作业组长",{"key":27,"text":272,"correct":22},"组织的最高管理者",{"key":31,"text":274,"correct":29},"项目经理",{"id":276,"libraryId":5,"type":95,"typeLabel":96,"stem":277,"options":278,"answer":27,"analysis":37},938093,"（2013年真题）某工程出现施工安全事故，造成2000万元直接经济损失，该事故属于（ ）。",[279,280,281,282],{"key":20,"text":100,"correct":29},{"key":24,"text":102,"correct":29},{"key":27,"text":104,"correct":22},{"key":31,"text":106,"correct":29},{"id":284,"libraryId":5,"type":95,"typeLabel":96,"stem":285,"options":286,"answer":27,"analysis":37},938094,"（2018年真题）工程项目职业健康安全管理中的“三同时”制度是指在我国建设的各类工程，职业健康安全设施必须与主体工程（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":29},"同时立项、同时实施、同时投产使用",{"key":24,"text":290,"correct":29},"同时立项、同时实施、同时验收交付",{"key":27,"text":292,"correct":22},"同时设计、同时施工、同时投产使用",{"key":31,"text":294,"correct":29},"同时设计、同时施工、同时验收交付",{"id":296,"libraryId":5,"type":95,"typeLabel":96,"stem":297,"options":298,"answer":20,"analysis":37},938095,"（2017年真题）工程项目安全预评价是在工程项目的（ ）阶段开展的一项工作。",[299,301,303,305],{"key":20,"text":300,"correct":22},"可行性研究",{"key":24,"text":302,"correct":29},"初步设计",{"key":27,"text":304,"correct":29},"施工",{"key":31,"text":306,"correct":29},"竣工验收",{"id":308,"libraryId":5,"type":95,"typeLabel":96,"stem":309,"options":310,"answer":24,"analysis":37},938096,"（2018真题）关于绿色设计及其内容、方法的说法，正确的是（ ）。",[311,312,313,314],{"key":20,"text":136,"correct":29},{"key":24,"text":138,"correct":22},{"key":27,"text":140,"correct":29},{"key":31,"text":142,"correct":29},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},938097,"（2018年真题）根据《生产安全事故报告和调查处理条例》，下列内容中，属于事故调查报告组成的有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":29},"已经采取的措施",{"key":24,"text":322,"correct":22},"事故的性质",{"key":27,"text":324,"correct":22},"事故的责任",{"key":31,"text":326,"correct":29},"事故责任者处理",{"key":34,"text":328,"correct":22},"事故的经过","BCE",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},938098,"（2014年真题）在施工安全计划的实施阶段，安全管理工作主要有（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":29},"编制安全计划",{"key":24,"text":337,"correct":22},"建立安全生产责任制",{"key":27,"text":339,"correct":22},"开展安全教育培训",{"key":31,"text":341,"correct":22},"进行安全技术交底",{"key":34,"text":343,"correct":29},"进行施工安全策划","BCD",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":359,"analysis":37},938099,"（2014年真题）进行工程项目环境影响评价需要预测工程项目给环境带来的影响，预测的内容主要有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"项目影响环境质量的变化量",{"key":24,"text":352,"correct":29},"项目影响环境等级标准的变化量",{"key":27,"text":354,"correct":22},"项目影响环境空间的变化范围",{"key":31,"text":356,"correct":29},"环境保护措施加强后项目收益的增加量",{"key":34,"text":358,"correct":22},"项目对环境影响的时段","ACE",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":359,"analysis":37},938100,"（2018年真题）绿色施工管理的主要内容包括（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"组织管理",{"key":24,"text":367,"correct":29},"咨询管理",{"key":27,"text":369,"correct":22},"规划管理",{"key":31,"text":371,"correct":29},"设计管理",{"key":34,"text":373,"correct":22},"评价管理",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":388,"analysis":37},938101,"（2018年真题）根据《生产安全事故报吿和调查处理条例》，下列事故中，负责事故调查的人民政府一般应在收到事故调查报告后 15 日内做出批复的有( )。",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"直接经济损失800万元、3人重伤的",{"key":24,"text":381,"correct":22},"直接经济损失600万元、8人重伤的",{"key":27,"text":383,"correct":22},"直接经济损失1500万元，3人重伤的",{"key":31,"text":385,"correct":29},"直接经济损失6000万元、105人重伤的",{"key":34,"text":387,"correct":29},"直接经济损失13000万元、3人重伤的","ABC",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":403,"analysis":37},938102,"（2013年真题）工程项目安全预评价报告的内容主要有( )。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"安全状况初步评价",{"key":24,"text":396,"correct":29},"安装管理岗位职责",{"key":27,"text":398,"correct":22},"定性、定量评价",{"key":31,"text":400,"correct":22},"安全卫生健康对策措施",{"key":34,"text":402,"correct":29},"安全事故原因分析","ACD",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":418,"analysis":37},938103,"（2013年真题）工程项目环境影响评价的内容主要有( )。",[408,410,412,414,416],{"key":20,"text":409,"correct":29},"环境资源评价",{"key":24,"text":411,"correct":22},"工程分析",{"key":27,"text":413,"correct":29},"环境保护措施评价",{"key":31,"text":415,"correct":22},"清洁生产评价",{"key":34,"text":417,"correct":22},"环境影响识别与预测","BDE",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":388,"analysis":37},938104,"（2012年真题）绿色设计也称为生态设计、环境设计，绿色设计的方法主要包括( )",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"模块化设计",{"key":24,"text":426,"correct":22},"循环设计",{"key":27,"text":428,"correct":22},"并行工程设计",{"key":31,"text":430,"correct":29},"平行工程设计",{"key":34,"text":432,"correct":29},"板块设计",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":447,"analysis":37},938105,"（2014年真题）进行“体系策划与设计”是建立职业健康安全与环境管理体系的工作之一，其主要内容有( )",[437,439,441,443,445],{"key":20,"text":438,"correct":29},"辨识工作场所中的危险因素和环境因素",{"key":24,"text":440,"correct":29},"明确适用的职业健康安全与环境法律法规",{"key":27,"text":442,"correct":22},"制订职业健康安全(环境)管理方案",{"key":31,"text":444,"correct":22},"确定管理体系组织机构和职责",{"key":34,"text":446,"correct":29},"评价组织机构和资源配备等情况","CD",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":462,"analysis":37},938106,"（2014年真题）工程项目安全预评价的方法主要有( )。",[452,454,456,458,460],{"key":20,"text":453,"correct":22},"因果分析法",{"key":24,"text":455,"correct":22},"事故树分析法",{"key":27,"text":457,"correct":22},"事故模型法",{"key":31,"text":459,"correct":22},"安全度评价法",{"key":34,"text":461,"correct":29},"SWOT分析法","ABCD",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":477,"analysis":37},938107,"（2016年真题）安全教育培训应包括的步骤有( )。",[467,469,471,473,475],{"key":20,"text":468,"correct":22},"培训前的准备",{"key":24,"text":470,"correct":29},"安全技术交底",{"key":27,"text":472,"correct":22},"信息与知识的传授",{"key":31,"text":474,"correct":22},"培训效果评价",{"key":34,"text":476,"correct":22},"监督执行","ACDE",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":329,"analysis":37},938108,"（2017年真题）工程项目环境影响评价的工作内容有( )。",[482,484,485,486,488],{"key":20,"text":483,"correct":29},"工程施工",{"key":24,"text":411,"correct":22},{"key":27,"text":415,"correct":22},{"key":31,"text":487,"correct":29},"工程项目环境影响的分析与调整",{"key":34,"text":489,"correct":22},"工程项目的环境影响识别与预测",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":462,"analysis":37},938109,"（2016年真题）绿色施工是指通过科学管理和技术进步，最大限度地节约资源并减少对环境负面影响的施工活动，从而实现( )和环境保护。",[494,496,498,500,502],{"key":20,"text":495,"correct":22},"节能",{"key":24,"text":497,"correct":22},"节地",{"key":27,"text":499,"correct":22},"节水",{"key":31,"text":501,"correct":22},"节材",{"key":34,"text":503,"correct":29},"节电",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":359,"analysis":37},938110,"（2017年真题）绿色施工的原则包括( )。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"关注工程项目的可持续发展，合理利用资源、能源",{"key":24,"text":511,"correct":29},"采用模块化、循环设计、并行工程设计方法",{"key":27,"text":513,"correct":22},"注重环境品质，减少施工造成的环境污染",{"key":31,"text":515,"correct":29},"建立安全施工责任制",{"key":34,"text":517,"correct":22},"结合气候、气象条件，合理安排施工计划",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":532,"analysis":37},938111,"（2016年真题）下列关于伤亡事故统计报告和处理制度说法正确的是( )。",[522,524,526,528,530],{"key":20,"text":523,"correct":22},"未造成人员伤亡的一般事故，县级人民政府也可委托事故发生单位组织事故调查组进行调查",{"key":24,"text":525,"correct":22},"重大事故、较大事故、一般事故，负责事故调查的人民政府应当自收到事故调查报告之日起15日内做出批复",{"key":27,"text":527,"correct":22},"特别重大事故由国务院或者国务院授权有关部门组织事故调查组进行调查",{"key":31,"text":529,"correct":29},"单位负责人接到报告后，应当于2小时内向事故发生地县级以上人民政府安全生产监督管理部门报告",{"key":34,"text":531,"correct":22},"较大事故，是指造成3人以上10人以下死亡，或者10人以上50人以下重伤，或者1000万元以上5000万元以下直接经济损失的事故","ABCE",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":547,"analysis":37},938113,"下列项目中，属于工程项目的是( )。",[537,539,541,543,545],{"key":20,"text":538,"correct":29},"发电机设计项目",{"key":24,"text":540,"correct":22},"扩建学校食堂",{"key":27,"text":542,"correct":22},"北京大兴国际机场建设项目",{"key":31,"text":544,"correct":29},"“9.3”大阅兵项目",{"key":34,"text":546,"correct":29},"嫦娥探月项目","BC",{"id":549,"libraryId":5,"type":95,"typeLabel":96,"stem":550,"options":551,"answer":20,"analysis":37},938114,"建立工程项目的目标系统的方法是( )。",[552,554,556,558],{"key":20,"text":553,"correct":22},"工作分解结构法",{"key":24,"text":555,"correct":29},"项目生命周期法",{"key":27,"text":557,"correct":29},"专家判断法",{"key":31,"text":559,"correct":29},"工程项目分析法",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":462,"analysis":37},938115,"工程项目系统主要包括（ ）。",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"目标系统",{"key":24,"text":567,"correct":22},"行为系统",{"key":27,"text":569,"correct":22},"组织系统",{"key":31,"text":571,"correct":22},"管理系统",{"key":34,"text":573,"correct":29},"控制系统",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":388,"analysis":37},938116,"ICB4.0 中，将项目管理的能力要素分为以下维度（ ）。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"人",{"key":24,"text":581,"correct":22},"实践",{"key":27,"text":583,"correct":22},"洞察力",{"key":31,"text":585,"correct":29},"环境",{"key":34,"text":587,"correct":29},"行为",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":388,"analysis":37},938117,"下列工作中，属于工程项目前期阶段的有（ ）。",[592,594,596,597,598],{"key":20,"text":593,"correct":22},"投资机会研究",{"key":24,"text":595,"correct":22},"初步可行性研究",{"key":27,"text":300,"correct":22},{"key":31,"text":302,"correct":29},{"key":34,"text":599,"correct":29},"施工图设计",{"id":601,"libraryId":5,"type":95,"typeLabel":96,"stem":602,"options":603,"answer":27,"analysis":37},938118,"为了形成特定的生产能力或使用效能而进行投资和建设，并形成固定资产的各类项目为（）。",[604,606,608,610],{"key":20,"text":605,"correct":29},"投资项目",{"key":24,"text":607,"correct":29},"建设项目",{"key":27,"text":609,"correct":22},"工程项目",{"key":31,"text":611,"correct":29},"兴建项目",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":52,"analysis":37},938119,"业主方在选择工程项目管理模式时，应考虑的因素包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"项目的复杂性",{"key":24,"text":619,"correct":22},"资金的来源",{"key":27,"text":621,"correct":29},"同期项目的盈利情况",{"key":31,"text":623,"correct":22},"法律法规的要求",{"key":34,"text":625,"correct":29},"技术标准的研究情况",{"id":627,"libraryId":5,"type":95,"typeLabel":96,"stem":628,"options":629,"answer":27,"analysis":37},938120,"下列属于工程项目不同于一般项目的特征的是（ ）。",[630,632,634,636],{"key":20,"text":631,"correct":29},"一次性",{"key":24,"text":633,"correct":29},"唯一性",{"key":27,"text":635,"correct":22},"工程项目环境的复杂性",{"key":31,"text":637,"correct":29},"建设周期长",{"id":639,"libraryId":5,"type":95,"typeLabel":96,"stem":640,"options":641,"answer":20,"analysis":37},938121,"工程项目的每一个阶段，都以（ ）作为其完成的标志。",[642,644,646,648],{"key":20,"text":643,"correct":22},"一个或数个可交付成果",{"key":24,"text":645,"correct":29},"项目评估报告",{"key":27,"text":647,"correct":29},"项目阶段性总结报告",{"key":31,"text":649,"correct":29},"工程项目计划",{"id":651,"libraryId":5,"type":95,"typeLabel":96,"stem":652,"options":653,"answer":20,"analysis":37},938122,"项目目标系统的建立方法是（ ）",[654,656,658,660],{"key":20,"text":655,"correct":22},"WBS",{"key":24,"text":657,"correct":29},"关键路径法",{"key":27,"text":659,"correct":29},"鱼刺图",{"key":31,"text":661,"correct":29},"网络技术",{"id":663,"libraryId":5,"type":95,"typeLabel":96,"stem":664,"options":665,"answer":27,"analysis":37},938123,"工程项目（ ）由主要负责完成项目工作分解结构（WBS）中各项工作任务的个人、单位和部门所构成。",[666,667,668,669],{"key":20,"text":565,"correct":29},{"key":24,"text":567,"correct":29},{"key":27,"text":569,"correct":22},{"key":31,"text":571,"correct":29},[671,674,677,680,683,686],{"id":95,"name":672,"category":7,"favorite":673},"领导干部任职前廉政法规知识测试题",92,{"id":675,"name":676,"category":7,"favorite":95},595,"建筑结构与设备",{"id":678,"name":679,"category":7,"favorite":95},715,"招标采购专业知识与法律法规",{"id":681,"name":682,"category":7,"favorite":95},848,"市政方向-通用基础",{"id":684,"name":685,"category":7,"favorite":8},534,"BIM工程师",{"id":687,"name":685,"category":7,"favorite":8},535]