[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":663},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,8,50,1948,[13,34,46,58,70,82,94,112,127,141,156,171,184,197,210,225,240,250,264,279,289,300,312,322,334,346,358,370,382,394,406,418,430,442,454,462,474,486,498,510,522,534,549,564,579,593,607,621,635,649],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},938022,1,"单选题","（2009年真题）某工程施工到 2009 年 3 月 31 日时，得到如下数据：计划工作预算费用为 2 800 万元，已完工作预算费用为 3 400 万元，已完工作实际费用为 3 000 万元。则工程此时的进度偏差为( )万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","-200",false,{"key":24,"text":25,"correct":22},"B","200",{"key":27,"text":28,"correct":22},"C","400",{"key":30,"text":31,"correct":32},"D","600",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},938023,"（2017年真题）下列关于挣值法评价指标含义的说法，正确的是( )",[38,40,42,44],{"key":20,"text":39,"correct":22},"费用偏差为正值，表示项目实际费用高于预算费用",{"key":24,"text":41,"correct":22},"进度偏差为正值，表示项目实际进度落后于计划进度",{"key":27,"text":43,"correct":22},"费用绩效指数小于1，表示项目实际费用低于预算费用",{"key":30,"text":45,"correct":32},"进度绩效指数小于1，表示项目实际进度落后于计划进度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},938024,"（2018年真题）挣值法中用于评价费用偏差的指标是( )。",[50,52,54,56],{"key":20,"text":51,"correct":32},"CV",{"key":24,"text":53,"correct":22},"SV",{"key":27,"text":55,"correct":22},"CPI",{"key":30,"text":57,"correct":22},"SPI",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},938025,"（2017年真题）某路基填筑工程合同工期 5 个月，综合单价初定为 15 元\u002Fm3，结算价每月按表 1 价格指数进行调整，计划工程量和实际工程量如表 2 所示，计划工作与实际工作一致，4 月末工程的费用偏差是( )万元",[62,64,66,68],{"key":20,"text":63,"correct":32},"-96.75",{"key":24,"text":65,"correct":22},"96.75",{"key":27,"text":67,"correct":22},"-135",{"key":30,"text":69,"correct":22},"135",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},938026,"（2017年真题）下列施工企业支出中，属于建筑安装工程费用组成中人工费的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"生产工人劳动服购置费",{"key":24,"text":77,"correct":22},"塔吊操作工的工资",{"key":27,"text":79,"correct":32},"钢筋工的高温作业津贴",{"key":30,"text":81,"correct":22},"职工调动工作路费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},938027,"（2013年真题）某工程项目室外管道铺设所花的费用应计入（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"基本预备费",{"key":24,"text":89,"correct":32},"建筑工程费",{"key":27,"text":91,"correct":22},"安装工程费",{"key":30,"text":93,"correct":22},"生产准备费",{"id":95,"libraryId":5,"type":96,"typeLabel":97,"stem":98,"options":99,"answer":111,"analysis":33},938028,2,"多选题","（2013年真题）建筑安装工程直接费中的措施费主要有（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":32},"安全文明施工费",{"key":24,"text":103,"correct":32},"已完工程保护费",{"key":27,"text":105,"correct":32},"二次搬运费",{"key":30,"text":107,"correct":22},"工程排污费",{"key":109,"text":110,"correct":22},"E","劳动保险费","ABC",{"id":113,"libraryId":5,"type":96,"typeLabel":97,"stem":114,"options":115,"answer":126,"analysis":33},938029,"（2018年真题）下列施工企业支出费用中，不属于建筑安装工程费中企业管理费的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"对混凝土试块进行强度检验所发生的费用",{"key":24,"text":119,"correct":32},"到外地购买钢材所发生的差旅费用",{"key":27,"text":121,"correct":32},"工人按规定定期休假所支付的工资费用",{"key":30,"text":123,"correct":22},"为职工报销探亲路费所发生的费用",{"key":109,"text":125,"correct":22},"按规定缴纳印花税所支付的费用","BC",{"id":128,"libraryId":5,"type":96,"typeLabel":97,"stem":129,"options":130,"answer":140,"analysis":33},938030,"（2014年真题）下列费用中，属于工程建设其他费的有( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":32},"可行性研究费",{"key":24,"text":134,"correct":32},"土地使用费和其他补偿费",{"key":27,"text":136,"correct":32},"勘察设计费",{"key":30,"text":138,"correct":22},"资金筹措费",{"key":109,"text":93,"correct":32},"ABCE",{"id":142,"libraryId":5,"type":96,"typeLabel":97,"stem":143,"options":144,"answer":155,"analysis":33},938031,"（2016年真题）建设投资由( BCDE )等组成。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"铺底流动资金",{"key":24,"text":148,"correct":32},"设备工器具购置费",{"key":27,"text":150,"correct":32},"建筑安装工程费",{"key":30,"text":152,"correct":32},"工程建设其他费用",{"key":109,"text":154,"correct":32},"预备费","BCDE",{"id":157,"libraryId":5,"type":96,"typeLabel":97,"stem":158,"options":159,"answer":170,"analysis":33},938032,"（2012年真题）工程项目设备、工器具购置费由( )组成",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"设备安装费",{"key":24,"text":163,"correct":22},"设备试运转费",{"key":27,"text":165,"correct":32},"设备原价",{"key":30,"text":167,"correct":32},"工器具原价",{"key":109,"text":169,"correct":32},"运杂费","CDE",{"id":172,"libraryId":5,"type":96,"typeLabel":97,"stem":173,"options":174,"answer":183,"analysis":33},938033,"（2012年真题）工程建设其他费用中，与未来企业生产经营有关的费用主要有( )",[175,177,178,180,182],{"key":20,"text":176,"correct":22},"建设管理费",{"key":24,"text":136,"correct":22},{"key":27,"text":179,"correct":22},"研究试验费",{"key":30,"text":181,"correct":32},"联合试运转费",{"key":109,"text":93,"correct":32},"DE",{"id":185,"libraryId":5,"type":96,"typeLabel":97,"stem":186,"options":187,"answer":196,"analysis":33},938034,"（2013年真题）工程项目总投资中的工程建设其他费用不包括( )。",[188,190,192,193,195],{"key":20,"text":189,"correct":32},"工器具购置费",{"key":24,"text":191,"correct":22},"工程保险费",{"key":27,"text":132,"correct":22},{"key":30,"text":194,"correct":32},"价差预备费",{"key":109,"text":181,"correct":22},"AD",{"id":198,"libraryId":5,"type":96,"typeLabel":97,"stem":199,"options":200,"answer":196,"analysis":33},938035,"（2018年真题）下列费用中，属于建筑安装工程费用中规费的有( )。",[201,203,205,207,209],{"key":20,"text":202,"correct":32},"社会保险费",{"key":24,"text":204,"correct":22},"职工教育经费",{"key":27,"text":206,"correct":22},"教育费附加",{"key":30,"text":208,"correct":32},"住房公积金",{"key":109,"text":107,"correct":22},{"id":211,"libraryId":5,"type":96,"typeLabel":97,"stem":212,"options":213,"answer":224,"analysis":33},938036,"（2014年真题）建设工程项目总概算的组成内容主要有( )。",[214,216,218,220,222],{"key":20,"text":215,"correct":32},"单项工程综合概算",{"key":24,"text":217,"correct":32},"工程建设其他费用概算",{"key":27,"text":219,"correct":32},"资金筹措费、预备费概算",{"key":30,"text":221,"correct":32},"经营性项目铺底流动资金概算",{"key":109,"text":223,"correct":22},"经营期利息概算","ABCD",{"id":226,"libraryId":5,"type":96,"typeLabel":97,"stem":227,"options":228,"answer":239,"analysis":33},938037,"（2011年真题）下列导致工程项目产生费用偏差的原因中，属于业主原因的有( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":32},"建设手续不全",{"key":24,"text":232,"correct":22},"物价突然上涨",{"key":27,"text":234,"correct":32},"场地提供不及时",{"key":30,"text":236,"correct":22},"政策发生变化",{"key":109,"text":238,"correct":32},"增加建设内容","ACE",{"id":241,"libraryId":5,"type":96,"typeLabel":97,"stem":242,"options":243,"answer":239,"analysis":33},938038,"（2009年真题）下列产生工程项目费用偏差的原因中，属于业主原因的有( )",[244,245,247,248,249],{"key":20,"text":230,"correct":32},{"key":24,"text":246,"correct":22},"设备涨价",{"key":27,"text":234,"correct":32},{"key":30,"text":236,"correct":22},{"key":109,"text":238,"correct":32},{"id":251,"libraryId":5,"type":96,"typeLabel":97,"stem":252,"options":253,"answer":239,"analysis":33},938039,"（2012年真题）设备安装工程概算编制方法主要有( )",[254,256,258,260,262],{"key":20,"text":255,"correct":32},"预算单价法",{"key":24,"text":257,"correct":22},"定额指标法",{"key":27,"text":259,"correct":32},"扩大单价法",{"key":30,"text":261,"correct":22},"工程量清单法",{"key":109,"text":263,"correct":32},"概算指标法",{"id":265,"libraryId":5,"type":96,"typeLabel":97,"stem":266,"options":267,"answer":278,"analysis":33},938040,"（2008年真题）编制建设工程项目费用计划时，常用的费用目标分解方式有( )",[268,270,272,274,276],{"key":20,"text":269,"correct":32},"按投资构成分解",{"key":24,"text":271,"correct":22},"按承包方分解",{"key":27,"text":273,"correct":32},"按项目组成分解",{"key":30,"text":275,"correct":32},"按时间进度分解",{"key":109,"text":277,"correct":22},"按设计方分解","ACD",{"id":280,"libraryId":5,"type":96,"typeLabel":97,"stem":281,"options":282,"answer":288,"analysis":33},938041,"（2018年真题）下列费用中，属于建筑安装工程费用中规费的有（ ）。",[283,284,285,286,287],{"key":20,"text":202,"correct":32},{"key":24,"text":204,"correct":22},{"key":27,"text":206,"correct":22},{"key":30,"text":208,"correct":32},{"key":109,"text":107,"correct":32},"ADE",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},938042,"（2009年真题）安装预算单价及扩大综合单价不全时，编制设备安装工程概算可采用( )。",[293,294,296,298],{"key":20,"text":263,"correct":32},{"key":24,"text":295,"correct":22},"实物法",{"key":27,"text":297,"correct":22},"估算指标法",{"key":30,"text":299,"correct":22},"费用分解法",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":27,"analysis":33},938044,"（2013年真题）工程项目试运行总结报告由（ ）负责编制。",[304,306,308,310],{"key":20,"text":305,"correct":22},"建设单位",{"key":24,"text":307,"correct":22},"设计单位",{"key":27,"text":309,"correct":32},"施工单位",{"key":30,"text":311,"correct":22},"监理单位",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":30,"analysis":33},938045,"（2018年真题）组织实施项目试运行工作的是（ ）。",[316,318,319,320],{"key":20,"text":317,"correct":22},"咨询单位",{"key":24,"text":307,"correct":22},{"key":27,"text":309,"correct":22},{"key":30,"text":321,"correct":32},"业主单位",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},938046,"（2013年真题）工程咨询成果必须符合（ ）的要求。",[326,328,330,332],{"key":20,"text":327,"correct":22},"项目可行",{"key":24,"text":329,"correct":22},"质量评价结果良好",{"key":27,"text":331,"correct":32},"委托合同",{"key":30,"text":333,"correct":22},"经济效益最大化",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},938047,"（2013年真题）建立过程项目质量管理责任制，其中过程准备阶段项目经理的质量管理职责之一是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"组织编制本企业的质量管理体系文件",{"key":24,"text":341,"correct":32},"检查项目质量计划执行情况",{"key":27,"text":343,"correct":22},"邀请专家对咨询成果质量进行评审",{"key":30,"text":345,"correct":22},"及时处理不合格的工程",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},938048,"（2016年真题）下列不属于工程项目质量管理的特点的是( )",[350,352,354,356],{"key":20,"text":351,"correct":22},"工程项目质量具有隐蔽性",{"key":24,"text":353,"correct":22},"影响工程项目质量的因素多",{"key":27,"text":355,"correct":22},"工程项目质量管理难度大",{"key":30,"text":357,"correct":32},"工程项目质量特性单一",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},938049,"（2016年真题）下列不属于质量管理 7 项原则的是( )。",[362,364,366,368],{"key":20,"text":363,"correct":22},"循证决策",{"key":24,"text":365,"correct":22},"改进",{"key":27,"text":367,"correct":22},"关系管理",{"key":30,"text":369,"correct":32},"方法与手段",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},938050,"（2007年真题）建立质量管理体系的基本步骤包括：①建立项目管理质量方针和目标；②持续改进质量管理体系；③结合 WBS 分解质量目标；④制定项目质量计划；⑤按照质量计划组织实施；⑥结合项目团队职能分解质量管理职能。正确的顺序是( )",[374,376,378,380],{"key":20,"text":375,"correct":22},"①～②～③～④～⑤～⑥",{"key":24,"text":377,"correct":22},"①～⑥～③～⑤～②～④",{"key":27,"text":379,"correct":32},"①～③～⑥～④～⑤～②",{"key":30,"text":381,"correct":22},"①～⑥～③～④～②～⑤",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},938051,"（2006年真题）建立工程项目质量管理体系的步骤不包括 ( )。",[386,388,390,392],{"key":20,"text":387,"correct":22},"结合项目工作结构的分解，层层分解质量目标",{"key":24,"text":389,"correct":22},"制定工程项目的质量计划",{"key":27,"text":391,"correct":32},"制定成品质量检验制度",{"key":30,"text":393,"correct":22},"明确各层次的质量管理目标",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},938052,"（2012年真题）工程质量管理的“三全控制”是指( )。",[398,400,402,404],{"key":20,"text":399,"correct":32},"全面质量控制、全过程质量控制和全员参与控制",{"key":24,"text":401,"correct":22},"全面质量控制、全方位质量控制、全员参与控制",{"key":27,"text":403,"correct":22},"全面要素质量控制、全方位质量控制、全员参与控制",{"key":30,"text":405,"correct":22},"全面要素质量控制、全过程质量控制、全员参与控制",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":30,"analysis":33},938053,"（2007年真题）设立工程咨询成果质量评价标准的基本原则不包括( )。",[410,412,414,416],{"key":20,"text":411,"correct":22},"能定量考核的尽可能采用定量标准",{"key":24,"text":413,"correct":22},"不能定量考核的应有明确定性要求",{"key":27,"text":415,"correct":22},"能真实反映工程项目的各种因素",{"key":30,"text":417,"correct":32},"可行性研究报告结论应满足审批需求",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},938054,"（2008年真题）《工业项目可行性研究报告的质量标准》中，贯彻宏观调控政策情况的综合评价标准不包括对( )的论证。",[422,424,426,428],{"key":20,"text":423,"correct":32},"效益估算可靠性",{"key":24,"text":425,"correct":22},"符合布局政策",{"key":27,"text":427,"correct":22},"优化产品结构",{"key":30,"text":429,"correct":22},"符合经济规模",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},938055,"（2016年真题）咨询企业领导组织的内部评审，由( )做汇报。",[434,436,438,440],{"key":20,"text":435,"correct":32},"项目经理",{"key":24,"text":437,"correct":22},"企业技术负责人",{"key":27,"text":439,"correct":22},"监理工程师",{"key":30,"text":441,"correct":22},"咨询业务主管",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},938056,"（2004年真题）由工程咨询企业领导组织，邀请社会上的专家参加，由项目经理做汇报的工程咨询成果质量评审属于( )。",[446,448,450,452],{"key":20,"text":447,"correct":22},"外部评审",{"key":24,"text":449,"correct":32},"内部评审",{"key":27,"text":451,"correct":22},"第三方评审",{"key":30,"text":453,"correct":22},"社会评审",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},938057,"（2013年真题）工程咨询成果必须符合( )的要求。",[458,459,460,461],{"key":20,"text":327,"correct":22},{"key":24,"text":329,"correct":22},{"key":27,"text":331,"correct":32},{"key":30,"text":333,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},938058,"（2004年真题）《工业项目可行性研究报告质量评价标准》中，( )属于经济分析情况综合评价。",[466,468,470,472],{"key":20,"text":467,"correct":22},"符合规模经济与否的论证情况",{"key":24,"text":469,"correct":32},"效益估算的可靠性情况",{"key":27,"text":471,"correct":22},"节能、节水论证情况",{"key":30,"text":473,"correct":22},"制定营销战略情况",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},938059,"（2012年真题）针对某设计项目建立质量目标，规定质量要求和安排应开展的活动，指的是( )",[478,480,482,484],{"key":20,"text":479,"correct":32},"设计策划",{"key":24,"text":481,"correct":22},"设计评审",{"key":27,"text":483,"correct":22},"设计控制",{"key":30,"text":485,"correct":22},"设计管理",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},938060,"（2010年真题）工程项目设计过程质量管理中，设计策划通常以( )的形式编制。",[490,492,494,496],{"key":20,"text":491,"correct":22},"项目设计方案",{"key":24,"text":493,"correct":32},"项目设计计划",{"key":27,"text":495,"correct":22},"项目设计图纸",{"key":30,"text":497,"correct":22},"项目设计流程",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},938061,"（2011年真题）工程项目具体质量计划的制订工作不包括( )。",[502,504,506,508],{"key":20,"text":503,"correct":32},"确定影响工程项目质量的因素",{"key":24,"text":505,"correct":22},"明确项目团队各层次的质量管理职能",{"key":27,"text":507,"correct":22},"编制收集记录数据的标准表格",{"key":30,"text":509,"correct":22},"明确项目团队各层次间的配合和接口",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},938062,"（2016年真题）下列关于试运行的质量管理的特点，说法正确的是( )。",[514,516,518,520],{"key":20,"text":515,"correct":32},"试运行是对项目质量的最终检验和试验",{"key":24,"text":517,"correct":22},"试运行是业主方和承包方的交接过程",{"key":27,"text":519,"correct":22},"试运行质量管理的目的是竣工验收",{"key":30,"text":521,"correct":22},"承包方要收集和管理试运行质最记录",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},938063,"（2017年真题） 下列不属于质量计划包括的内容的是( )。",[526,528,530,532],{"key":20,"text":527,"correct":22},"明确各层次的质量目标和质量管理职能",{"key":24,"text":529,"correct":22},"明确各层次之问的配合和接口",{"key":27,"text":531,"correct":32},"确定和提供制定质量计划所需的资源",{"key":30,"text":533,"correct":22},"明确记录和报告数据的标准表格",{"id":535,"libraryId":5,"type":96,"typeLabel":97,"stem":536,"options":537,"answer":548,"analysis":33},938064,"（2018年真题）关于工程项目质量及其管理的说法，正确的有( )",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"工程项目质量是指工程项目产品、服务满足基本要求的程度",{"key":24,"text":541,"correct":32},"工程项目质量具有时效性和相对性的特点",{"key":27,"text":543,"correct":32},"对工程项目质量的要求可以是明示的",{"key":30,"text":545,"correct":32},"人员的工作质量是工程项目质量的基础",{"key":109,"text":547,"correct":22},"工程项目质量管理的目的是建设最优质量的工程项目","BCD",{"id":550,"libraryId":5,"type":96,"typeLabel":97,"stem":551,"options":552,"answer":563,"analysis":33},938065,"（2017年真题）工程项目质量管理的基本方法有( )",[553,555,557,559,561],{"key":20,"text":554,"correct":32},"三阶段控制法",{"key":24,"text":556,"correct":32},"三全控制法",{"key":27,"text":558,"correct":22},"WBS法",{"key":30,"text":560,"correct":32},"PDCA循环管理法",{"key":109,"text":562,"correct":22},"网络图法","ABD",{"id":565,"libraryId":5,"type":96,"typeLabel":97,"stem":566,"options":567,"answer":578,"analysis":33},938066,"（2009年真题）《工程咨询成果质量评价办法》规定，进行工业项目可行性研究报告的质量评价，应评价( )等方面",[568,570,572,574,576],{"key":20,"text":569,"correct":32},"风险分析",{"key":24,"text":571,"correct":32},"多方案比选",{"key":27,"text":573,"correct":22},"社会需求",{"key":30,"text":575,"correct":32},"市场调查分析",{"key":109,"text":577,"correct":32},"贯彻宏观政策分析","ABDE",{"id":580,"libraryId":5,"type":96,"typeLabel":97,"stem":581,"options":582,"answer":563,"analysis":33},938067,"（2011年真题）根据《工业项目可行性研究报告质量评价标准》，对市场调查分析情况综合评价的内容有( )",[583,585,587,589,591],{"key":20,"text":584,"correct":32},"对产品结构符合市场需求的论证情况",{"key":24,"text":586,"correct":32},"营销战略的制订情况",{"key":27,"text":588,"correct":22},"对合理布局的论证情况",{"key":30,"text":590,"correct":32},"预测方法的选用情况",{"key":109,"text":592,"correct":22},"对外部配套条件的论证情况",{"id":594,"libraryId":5,"type":96,"typeLabel":97,"stem":595,"options":596,"answer":563,"analysis":33},938068,"（2004年真题）制定工程咨询项目质量计划工作内容包括( )。",[597,599,601,603,605],{"key":20,"text":598,"correct":32},"明确项目咨询成果的质量目标和质量标准",{"key":24,"text":600,"correct":32},"明确影响质量的控制节点，制定检查、控制的措施",{"key":27,"text":602,"correct":22},"编制项目质量报告，报上级质检部门和项目经理",{"key":30,"text":604,"correct":32},"层层分析质量目标",{"key":109,"text":606,"correct":22},"发现重大质量问题，及时组织解决并向项目团队负责人报告",{"id":608,"libraryId":5,"type":96,"typeLabel":97,"stem":609,"options":610,"answer":239,"analysis":33},938069,"（2018年真题）下列工作中，属于咨询工程师(投资)在施工图设计阶段质量管理工作的是( )。",[611,613,615,617,619],{"key":20,"text":612,"correct":32},"组织委托施工图审查工作",{"key":24,"text":614,"correct":22},"组织进行项目概念设计方案比选",{"key":27,"text":616,"correct":32},"限额设计",{"key":30,"text":618,"correct":22},"审查地勘报告",{"key":109,"text":620,"correct":32},"组织施工图设计交底",{"id":622,"libraryId":5,"type":96,"typeLabel":97,"stem":623,"options":624,"answer":170,"analysis":33},938070,"（2017年真题）分部工程质量验收合格的标准有( )。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"所含检验批的质量均应验收合格",{"key":24,"text":628,"correct":22},"所含检验批的质量验收记录应完整",{"key":27,"text":630,"correct":32},"所含分项工程的质量均应验收合格",{"key":30,"text":632,"correct":32},"观感质量应符合要求",{"key":109,"text":634,"correct":32},"有关安全、节能、环境保护和主要使用功能的抽样检验结果应符合相应规定",{"id":636,"libraryId":5,"type":96,"typeLabel":97,"stem":637,"options":638,"answer":140,"analysis":33},938071,"（2012年真题）工程咨询成果质量评价标准的基本方面包括( )。",[639,641,643,645,647],{"key":20,"text":640,"correct":32},"工程咨询成果必须符合国家要求",{"key":24,"text":642,"correct":32},"工程咨询成果必须符合社会事业发展的根本利益",{"key":27,"text":644,"correct":32},"工程咨询成果必须符合业主的要求",{"key":30,"text":646,"correct":22},"工程咨询成果必须得出项目可行的结论",{"key":109,"text":648,"correct":32},"工程咨询成果必须满足建设各相关方的要求",{"id":650,"libraryId":5,"type":96,"typeLabel":97,"stem":651,"options":652,"answer":196,"analysis":33},938072,"（2010年真题）根据《工程咨询成果质量评价办法》，进行多方比选情况综合评价时，应主要从( )等方面进行评价。",[653,655,657,659,661],{"key":20,"text":654,"correct":32},"技术方案比选",{"key":24,"text":656,"correct":22},"节能节水论证",{"key":27,"text":658,"correct":22},"节约土地论证",{"key":30,"text":660,"correct":32},"实施方案比选",{"key":109,"text":662,"correct":22},"职业卫生论证",[664,667,670,673,676,679],{"id":15,"name":665,"category":7,"favorite":666},"领导干部任职前廉政法规知识测试题",92,{"id":668,"name":669,"category":7,"favorite":15},595,"建筑结构与设备",{"id":671,"name":672,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":674,"name":675,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":677,"name":678,"category":7,"favorite":8},534,"BIM工程师",{"id":680,"name":678,"category":7,"favorite":8},535]