[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":648},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,7,50,1948,[13,34,46,58,70,80,92,104,116,128,140,152,164,175,192,207,222,236,251,266,277,292,307,322,335,350,365,379,388,402,416,430,444,458,470,482,494,506,515,527,539,551,563,575,583,595,607,616,628,640],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},937972,1,"单选题","（2004年真题）在合理工期条件下进行工程费用优化，如果缩短工期将会引起工程( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","直接费和间接费同时增加",false,{"key":24,"text":25,"correct":22},"B","直接费减少，间接费增加",{"key":27,"text":28,"correct":22},"C","直接费和间接费同时减少",{"key":30,"text":31,"correct":32},"D","直接费增加，间接费减少",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},937973,"（2011年真题）工程项目进度管理中，采用工期最短的资源优化方法的工作有：①检查每天资源需用量是否超过资源限量；②计算网络计划每天资源需用量；③对资源冲突的工作重新安排顺序；④重复以上步骤直到出现优化方案。正确的实施顺序是( )",[38,40,42,44],{"key":20,"text":39,"correct":22},"①→②→③→④",{"key":24,"text":41,"correct":32},"②→①→③→④",{"key":27,"text":43,"correct":22},"①→③→②→④",{"key":30,"text":45,"correct":22},"②→③→①→④",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},937974,"（2014年真题）工程项目工作定义的基本依据是（ ）中做出的工作分解结构（WBS）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"进度管理",{"key":24,"text":53,"correct":22},"合同管理",{"key":27,"text":55,"correct":22},"工程管理",{"key":30,"text":57,"correct":32},"范围管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},937975,"（2013年真题）工程网络计划中的费用优化，是指寻求（ ）的过程。",[62,64,66,68],{"key":20,"text":63,"correct":32},"工程总成本最低时的最短工期安排",{"key":24,"text":65,"correct":22},"工程直接成本最低时的工期安排",{"key":27,"text":67,"correct":22},"工程间接成本最低时的工期安排",{"key":30,"text":69,"correct":22},"给定费用前提下的最近工期安排",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},937976,"（2017年真题）某工程项目实施过程的部分时间参数如下表所示： 其中，总时差最大的活动是（ ）。",[74,75,76,78],{"key":20,"text":24,"correct":22},{"key":24,"text":30,"correct":32},{"key":27,"text":77,"correct":22},"E",{"key":30,"text":79,"correct":22},"G",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":30,"analysis":33},937977,"（2016年真题）分析偏差对后续工期的影响通常需要借助网络计划进行判断，根据该项目是否处于关键线路、其进度偏差是否超过该项工作的（ ）来判断。",[84,86,88,90],{"key":20,"text":85,"correct":22},"早开始时间",{"key":24,"text":87,"correct":22},"最迟开始时间",{"key":27,"text":89,"correct":22},"总时差和总工期",{"key":30,"text":91,"correct":32},"总时差和自由时差",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},937978,"（2014年真题）工程项目双代号网络计划如图所示，工作F 的最迟开始时间是（ ）天。",[96,98,100,102],{"key":20,"text":97,"correct":32},"4",{"key":24,"text":99,"correct":22},"6",{"key":27,"text":101,"correct":22},"8",{"key":30,"text":103,"correct":22},"10",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},937979,"（2016年真题）某工程双代号网络计划如图所示，其中关键线路有（ ）条。",[108,110,112,114],{"key":20,"text":109,"correct":22},"1条",{"key":24,"text":111,"correct":22},"2条",{"key":27,"text":113,"correct":32},"3条",{"key":30,"text":115,"correct":22},"4条",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":30,"analysis":33},937980,"（2016年真题）下列关于虚箭线的说法错误的是（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"不消耗时间",{"key":24,"text":123,"correct":22},"不消耗资源",{"key":27,"text":125,"correct":22},"表达逻辑关系",{"key":30,"text":127,"correct":32},"表达组织关系",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},937981,"（2013年真题）在工程项目进度计划表示方法中，与横道图相比，时标网络图的优点是能够( )",[132,134,136,138],{"key":20,"text":133,"correct":22},"明确表示各项资源需求量",{"key":24,"text":135,"correct":32},"明确表示各项工作之间的逻辑关系",{"key":27,"text":137,"correct":22},"直观表示各项工作的持续时间",{"key":30,"text":139,"correct":22},"直观表示工程进度计划的计算工期",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":30,"analysis":33},937982,"（2011年真题）下列工程进度计划表示方法中，不能直接在图上显示各项工作的开始和完成时间的方法是( )",[144,146,148,150],{"key":20,"text":145,"correct":22},"横道图法",{"key":24,"text":147,"correct":22},"时标网络图法",{"key":27,"text":149,"correct":22},"单代号网络图法",{"key":30,"text":151,"correct":32},"进度曲线法",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},937983,"（2017年真题）某工程双代号时标网络计划如图所示，其中工作E的总时差和自由时差（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"1周，1周",{"key":24,"text":159,"correct":22},"2周，0周",{"key":27,"text":161,"correct":32},"2周，1周",{"key":30,"text":163,"correct":22},"3周，2周",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},937984,"（2014年真题）工程项目单代号网络计划如图所示，该计划中的关键路线有( )条。",[168,170,172,174],{"key":20,"text":169,"correct":22},"1",{"key":24,"text":171,"correct":32},"2",{"key":27,"text":173,"correct":22},"3",{"key":30,"text":97,"correct":22},{"id":176,"libraryId":5,"type":177,"typeLabel":178,"stem":179,"options":180,"answer":191,"analysis":33},937985,2,"多选题","（2009年真题）某分部工程双代号网络图如图所示，图中存在的错误有( )。",[181,183,185,187,189],{"key":20,"text":182,"correct":32},"有多个起点节点",{"key":24,"text":184,"correct":22},"有多个终点节点",{"key":27,"text":186,"correct":32},"节点编号有误",{"key":30,"text":188,"correct":22},"存在循环回路",{"key":77,"text":190,"correct":32},"有多余虚工作","ACE",{"id":193,"libraryId":5,"type":177,"typeLabel":178,"stem":194,"options":195,"answer":206,"analysis":33},937986,"（2012年真题）编制工程项目进度计划的方法主要有( )。",[196,198,200,202,204],{"key":20,"text":197,"correct":32},"关键线路法",{"key":24,"text":199,"correct":32},"计划评审技术",{"key":27,"text":201,"correct":22},"头脑风暴法",{"key":30,"text":203,"correct":32},"图示评审技术",{"key":77,"text":205,"correct":22},"定额计算法","ABD",{"id":208,"libraryId":5,"type":177,"typeLabel":178,"stem":209,"options":210,"answer":221,"analysis":33},937987,"（2016年真题）进度计划的优化方法包括( )",[211,213,215,217,219],{"key":20,"text":212,"correct":32},"工期优化",{"key":24,"text":214,"correct":32},"费用优化",{"key":27,"text":216,"correct":22},"工艺优化",{"key":30,"text":218,"correct":22},"质量优化",{"key":77,"text":220,"correct":32},"资源优化","ABE",{"id":223,"libraryId":5,"type":177,"typeLabel":178,"stem":224,"options":225,"answer":221,"analysis":33},937988,"（2014年真题）选择缩短持续时间的关键工作进行工程项目工期优化时，应优先选择( )。",[226,228,230,232,234],{"key":20,"text":227,"correct":32},"对质量影响不大的工作",{"key":24,"text":229,"correct":32},"增加费用最少的工作",{"key":27,"text":231,"correct":22},"持续时间最长的工作",{"key":30,"text":233,"correct":22},"可以最后进行的工作",{"key":77,"text":235,"correct":32},"有充足备用资源的工作",{"id":237,"libraryId":5,"type":177,"typeLabel":178,"stem":238,"options":239,"answer":250,"analysis":33},937989,"（2006年真题）工程项目进度计划的资源优化是在现有资源条件下寻求( )。",[240,242,244,246,248],{"key":20,"text":241,"correct":22},"最优工期条件下的资源均衡",{"key":24,"text":243,"correct":32},"工期固定条件下的资源均衡",{"key":27,"text":245,"correct":32},"资源有限条件下的最短工期",{"key":30,"text":247,"correct":22},"资源均衡使用时的最短工期",{"key":77,"text":249,"correct":22},"最低成本条件下的最短工期","BC",{"id":252,"libraryId":5,"type":177,"typeLabel":178,"stem":253,"options":254,"answer":265,"analysis":33},937990,"（2012年真题）将工程项目实际进度与计划进度进行比较的方法主要有( BDE )。",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"关键线路比较法",{"key":24,"text":258,"correct":32},"横道图比较法",{"key":27,"text":260,"correct":22},"控制图比较法",{"key":30,"text":262,"correct":32},"前锋线比较法",{"key":77,"text":264,"correct":32},"列表比较法","BDE",{"id":267,"libraryId":5,"type":177,"typeLabel":178,"stem":268,"options":269,"answer":276,"analysis":33},937991,"（2010年真题）工程项目实际进度与计划进度的比较方法主要有( )",[270,271,272,274,275],{"key":20,"text":256,"correct":22},{"key":24,"text":258,"correct":32},{"key":27,"text":273,"correct":32},"S曲线比较法",{"key":30,"text":262,"correct":32},{"key":77,"text":264,"correct":32},"BCDE",{"id":278,"libraryId":5,"type":177,"typeLabel":178,"stem":279,"options":280,"answer":291,"analysis":33},937992,"（2017年真题）下列进度控制过程的内容中，最先和最后进行的内容为( )",[281,283,285,287,289],{"key":20,"text":282,"correct":32},"出现进度偏差",{"key":24,"text":284,"correct":22},"分析偏差对其后续工作和总工期的影响",{"key":27,"text":286,"correct":22},"采取进度调整措施",{"key":30,"text":288,"correct":22},"采取相应的经济、组织、合同措施",{"key":77,"text":290,"correct":32},"进度监测系统","AE",{"id":293,"libraryId":5,"type":177,"typeLabel":178,"stem":294,"options":295,"answer":306,"analysis":33},937993,"（2011年真题）某工作的实际进度发生偏差，判断其对后续工作和总工期是否产生影响的依据有( )",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"工程资源的分布是否均衡",{"key":24,"text":299,"correct":22},"该工程的实际投资是否到位",{"key":27,"text":301,"correct":32},"该工作是否处于关键线路",{"key":30,"text":303,"correct":32},"进度偏差是否超过该工作的总时差",{"key":77,"text":305,"correct":32},"进度偏差是否超过该工作的自由时差","CDE",{"id":308,"libraryId":5,"type":177,"typeLabel":178,"stem":309,"options":310,"answer":321,"analysis":33},937994,"（2005年真题）工程项目进度计划优化中的费用优化是为了寻求( )。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"资源有限条件下的最短工期安排",{"key":24,"text":314,"correct":32},"最低成本时的最短工期安排",{"key":27,"text":316,"correct":22},"资源均衡使用时的最短工期安排",{"key":30,"text":318,"correct":32},"满足要求工期时的最低成本安排",{"key":77,"text":320,"correct":22},"最低成本条件下资源均衡安排","BD",{"id":323,"libraryId":5,"type":177,"typeLabel":178,"stem":324,"options":325,"answer":334,"analysis":33},937995,"（2004年真题）工程项目进度计划的表示方法包括( )。",[326,327,329,330,332],{"key":20,"text":145,"correct":32},{"key":24,"text":328,"correct":32},"可交付成果法",{"key":27,"text":151,"correct":32},{"key":30,"text":331,"correct":22},"计划评审技术法",{"key":77,"text":333,"correct":22},"图示评审技术法","ABC",{"id":336,"libraryId":5,"type":177,"typeLabel":178,"stem":337,"options":338,"answer":349,"analysis":33},937996,"（2018年真题）既保持项目范围不变，又能使关键线路长度减少的措施有( )",[339,341,343,345,347],{"key":20,"text":340,"correct":32},"增加资源",{"key":24,"text":342,"correct":22},"消除时差",{"key":27,"text":344,"correct":32},"赶工",{"key":30,"text":346,"correct":32},"调整逻辑关系",{"key":77,"text":348,"correct":22},"减少项目工作","ACD",{"id":351,"libraryId":5,"type":177,"typeLabel":178,"stem":352,"options":353,"answer":364,"analysis":33},937997,"（2016年真题）定义优先级的标准一般有（ ）。",[354,356,358,360,362],{"key":20,"text":355,"correct":32},"资源的数量和价值量",{"key":24,"text":357,"correct":32},"资源增减的可能性",{"key":27,"text":359,"correct":32},"获得程度",{"key":30,"text":361,"correct":32},"可替代性",{"key":77,"text":363,"correct":22},"价格问题对项目的影响","ABCD",{"id":366,"libraryId":5,"type":177,"typeLabel":178,"stem":367,"options":368,"answer":265,"analysis":33},937998,"（2013年真题）工程项目进度管理的工作内容主要有（ ）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"资源需求分析",{"key":24,"text":372,"correct":32},"工作时间估算",{"key":27,"text":374,"correct":22},"工作成本测算",{"key":30,"text":376,"correct":32},"工作顺序安排",{"key":77,"text":378,"correct":32},"进度计划编制",{"id":380,"libraryId":5,"type":177,"typeLabel":178,"stem":381,"options":382,"answer":265,"analysis":33},937999,"（2012年真题）将工程项目实际进度与计划进度进行比较的方法主要有（ ）。",[383,384,385,386,387],{"key":20,"text":256,"correct":22},{"key":24,"text":258,"correct":32},{"key":27,"text":260,"correct":22},{"key":30,"text":262,"correct":32},{"key":77,"text":264,"correct":32},{"id":389,"libraryId":5,"type":177,"typeLabel":178,"stem":390,"options":391,"answer":401,"analysis":33},938000,"（2016年真题）工作时间估算的方法有（ ）。",[392,394,396,397,399],{"key":20,"text":393,"correct":32},"类比估算",{"key":24,"text":395,"correct":32},"利用历史数据估算",{"key":27,"text":201,"correct":22},{"key":30,"text":398,"correct":32},"专家判断估算",{"key":77,"text":400,"correct":32},"模拟法","ABDE",{"id":403,"libraryId":5,"type":177,"typeLabel":178,"stem":404,"options":405,"answer":321,"analysis":33},938001,"（2017年真题）下列关于制定工程项目进度计划方法的说法，错误的有（ ）。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"关键线路法假定项目进度计划中工作之间的逻辑关系是确定的，且每项工作只估算一个肯定的持续时间",{"key":24,"text":409,"correct":32},"关键线路法在考虑资源限制的前提下，计算所有工作理论上的最早开始与完成时间、最迟开始与完成时间",{"key":27,"text":411,"correct":22},"关键线路法中计算得到的最早开始与完成时间、最迟开始与完成时间不一定是项目工作最终的计划时间",{"key":30,"text":413,"correct":32},"使用关键线路法按最大可能时间估算制定的项目进度计划比使用计划评审技术制定的进度计划更符合实际情况",{"key":77,"text":415,"correct":22},"图示评审技术假定工作之间的逻辑关系及工作的持续时间都是不确定的",{"id":417,"libraryId":5,"type":177,"typeLabel":178,"stem":418,"options":419,"answer":321,"analysis":33},938002,"（2018年真题）关于项目进度计划及其优化的说法，正确的有（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"计划中的关键工作指的是自由时差为零的工作",{"key":24,"text":423,"correct":32},"计划优化时应考虑有充足备用资源的工作",{"key":27,"text":425,"correct":22},"工期优化通过压缩持续时间长的工作进行",{"key":30,"text":427,"correct":32},"横道图是传统的进度计划表示方法",{"key":77,"text":429,"correct":22},"工作间逻辑关系不能确定时，应采用计划评审技术编制计划",{"id":431,"libraryId":5,"type":177,"typeLabel":178,"stem":432,"options":433,"answer":349,"analysis":33},938003,"（2016年真题）工作顺序安排的依据包括( )",[434,436,438,440,442],{"key":20,"text":435,"correct":32},"工作清单",{"key":24,"text":437,"correct":22},"成果说明文件",{"key":27,"text":439,"correct":32},"各项工作之间的逻辑关系",{"key":30,"text":441,"correct":32},"其他约束与假设",{"key":77,"text":443,"correct":22},"成本强度",{"id":445,"libraryId":5,"type":177,"typeLabel":178,"stem":446,"options":447,"answer":457,"analysis":33},938004,"（2017年真题）如果要减少项目进度计划的计算工期，可以采取的措施有（ ）。",[448,450,452,453,455],{"key":20,"text":449,"correct":32},"增加人员",{"key":24,"text":451,"correct":22},"消减时差",{"key":27,"text":344,"correct":32},{"key":30,"text":454,"correct":32},"增加平行作业",{"key":77,"text":456,"correct":32},"取消部分工作","ACDE",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},938005,"（2005年真题）如果与费用偏差相联系，工程项目费用控制中的进度偏差是指( )之间的差异。",[462,464,466,468],{"key":20,"text":463,"correct":22},"已完工程实际费用与拟完工程计划费用",{"key":24,"text":465,"correct":32},"拟完工程计划费用与已完工程计划费用",{"key":27,"text":467,"correct":22},"已完工程实际时间与拟完工程计划时间",{"key":30,"text":469,"correct":22},"已完工程计划费用与未完工程计划费用",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},938006,"（2012年真题）建筑安装工程费用的税金是指国家税法规定应计人建筑安装工程造价内的( )。",[474,476,478,480],{"key":20,"text":475,"correct":32},"增值税销项税额",{"key":24,"text":477,"correct":22},"营业税",{"key":27,"text":479,"correct":22},"教育费附加",{"key":30,"text":481,"correct":22},"城市维护建设税",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},938007,"（2014年真题）设计概算的编制依据不包括( )",[486,488,490,492],{"key":20,"text":487,"correct":22},"工程项目资金筹措方案",{"key":24,"text":489,"correct":32},"设计合同",{"key":27,"text":491,"correct":22},"工程勘察与设计文件",{"key":30,"text":493,"correct":22},"施工组织设计和施工方案",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":30,"analysis":33},938008,"（2006年真题）当初步设计达到一定深度，建筑结构比较明确时，可采用( )编制建筑工程概算",[498,500,502,504],{"key":20,"text":499,"correct":22},"概算指标法",{"key":24,"text":501,"correct":22},"预算单价法",{"key":27,"text":503,"correct":22},"实物法",{"key":30,"text":505,"correct":32},"扩大单价法",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},938009,"（2010年真题）采用定额单价法编制施工图预算的主要步骤包括：①准备材料并熟悉施工图纸，②编制工料分析表，③计算工程量，④套用定额单价，计算人、料、机费用，⑤计算其他费用，⑥复核。正确的顺序是( ) A.①-②-③-④-⑤-⑥ B.①-③-④-②-⑤-⑥ C.①-③-②-⑤-④-⑥ D.①-②-③-⑤-④-⑥",[510,511,512,513,514],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":32},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"key":77,"text":77,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},938010,"（2012年真题）我国目前实行的工程量清单计价采用的综合单价是部分费用综合单价，清单项目单价中不包括( )。",[519,521,523,525],{"key":20,"text":520,"correct":32},"规费和税金",{"key":24,"text":522,"correct":22},"企业管理费、规费",{"key":27,"text":524,"correct":22},"规费、利润和税金",{"key":30,"text":526,"correct":22},"企业管理费、规费、利润和税金",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":30,"analysis":33},938011,"（2017年真题）某施工合同含甲、乙 2 个子项工程，估算工程量分别为 6000m3和 8000m3，合同工期为12 个月，商定合同价甲项为 200 元\u002Fm3，乙项为 300 元\u002Fm3。合同约定： (1)开发前发包人向承包人支付合同价 20%的预付款，在最后 2 个月平均扣回。 (2)发包人在承包人每个月的工程款中，按 5%的比例扣留质量保证金； (3)根据市场情况，价格调整系数平均按 1.1 计算； (4)工程师签发付款最低金额为 45 万元。 承包人 1～4 月份实际完成并经工程师签证确认的工程量分别为： 工程师 3 月份实际签发的凭证付款金额为( )元",[531,533,535,537],{"key":20,"text":532,"correct":22},"292600",{"key":24,"text":534,"correct":22},"316500",{"key":27,"text":536,"correct":22},"627000",{"key":30,"text":538,"correct":32},"689700",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},938012,"（2012年真题）某工程项目总费用预算为 1000 万元，计划工期为 10 个月，第 8 个月月末已完工作实际费用为 900 万元，若此时预测项目能否按预算完成，还需要( )信息",[543,545,547,549],{"key":20,"text":544,"correct":22},"计划工作预算费用",{"key":24,"text":546,"correct":32},"已完工作预算费用",{"key":27,"text":548,"correct":22},"已使用的准备金",{"key":30,"text":550,"correct":22},"已消耗的资源数量",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},938013,"（2016年真题）某工程施工到 2015 年 8 月，已完工作预算费用为 6000 万元，计划工作预算费用为 5800万元，已完工作实际费用为 6200 万元，则此时的费用绩效指数为( B )",[555,557,559,561],{"key":20,"text":556,"correct":22},"0.94",{"key":24,"text":558,"correct":32},"0.97",{"key":27,"text":560,"correct":22},"1.03",{"key":30,"text":562,"correct":22},"1.07",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},938014,"（2008年真题）2008 年 3 月底，某项目计划工作预算费用为 4800 万元，已完工作预算费用为 4200 万元，已完工作实际费用为 5200 万元。据此判断，该项目此时( )。",[567,569,571,573],{"key":20,"text":568,"correct":22},"进度提前，费用超支",{"key":24,"text":570,"correct":32},"进度拖延，费用超支",{"key":27,"text":572,"correct":22},"进度提前，费用节约",{"key":30,"text":574,"correct":22},"进度拖延，费用节约",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":27,"analysis":33},938015,"（2008年真题）某工程施工到 2008 年 4 月，已完工作预算费用为 6000 万元，计划工作预算费用为 5800万元.已完工作实际费用为 6200 万元，则该工程此时的进度绩效指数为( )。",[579,580,581,582],{"key":20,"text":556,"correct":22},{"key":24,"text":558,"correct":22},{"key":27,"text":560,"correct":32},{"key":30,"text":562,"correct":22},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":30,"analysis":33},938016,"（2017年真题）安全文明施工费不包括( )。",[587,589,591,593],{"key":20,"text":588,"correct":22},"环境保护费",{"key":24,"text":590,"correct":22},"临时设施费",{"key":27,"text":592,"correct":22},"安全设施费",{"key":30,"text":594,"correct":32},"冬雨季施工增加费",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":30,"analysis":33},938017,"（2012年真题）环境保护费、文明施工费、安全施工费、临时设施费合并称为( )",[599,601,603,605],{"key":20,"text":600,"correct":22},"环境文明施工费",{"key":24,"text":602,"correct":22},"环保安全施工费",{"key":27,"text":604,"correct":22},"环保、安全文明施工费",{"key":30,"text":606,"correct":32},"安全文明施工费",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},938018,"（2005年真题）当初步设计有详细的设备清单时，编制设备安装工程概算宜采用( )",[611,612,613,615],{"key":20,"text":499,"correct":22},{"key":24,"text":501,"correct":32},{"key":27,"text":614,"correct":22},"实物指标法",{"key":30,"text":505,"correct":22},{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":27,"analysis":33},938019,"（2014年真题）通过对项目费用目标按时间进行分解，在时标网络计划基础上可做项目进度计划的( )",[620,622,624,626],{"key":20,"text":621,"correct":22},"直方图",{"key":24,"text":623,"correct":22},"香蕉图",{"key":27,"text":625,"correct":32},"横道图",{"key":30,"text":627,"correct":22},"S曲线",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":27,"analysis":33},938020,"（2014年真题）编制工程项目费用计划时，各项工作都按( )安排，有利于节约业主方的贷款利息",[632,634,636,638],{"key":20,"text":633,"correct":22},"最早开始时期",{"key":24,"text":635,"correct":22},"要求工期",{"key":27,"text":637,"correct":32},"最迟开始时期",{"key":30,"text":639,"correct":22},"计划工期",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":24,"analysis":33},938021,"（2011年真题）某工程施工到 2011 年 3 月，已完工作预算费用为 6000 万元，计划工作预算费用为 5800万元，已完工作实际费用为 6200 万元，则此时的费用绩效指数为( )",[644,645,646,647],{"key":20,"text":556,"correct":22},{"key":24,"text":558,"correct":32},{"key":27,"text":560,"correct":22},{"key":30,"text":562,"correct":22},[649,652,655,658,661,664],{"id":15,"name":650,"category":7,"favorite":651},"领导干部任职前廉政法规知识测试题",92,{"id":653,"name":654,"category":7,"favorite":15},595,"建筑结构与设备",{"id":656,"name":657,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":659,"name":660,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":662,"name":663,"category":7,"favorite":8},534,"BIM工程师",{"id":665,"name":663,"category":7,"favorite":8},535]