[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":632},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,6,50,1948,[13,38,53,68,83,94,109,124,139,153,162,175,190,199,208,223,238,252,261,276,286,300,314,326,338,350,362,374,386,398,410,422,434,443,451,460,472,484,496,508,520,532,542,550,562,574,586,598,610,622],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},937922,2,"多选题","（2017年真题）根据 FIDIC 施工合同条件，下列关于工程质量管理条款的说法，错误的有( )",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","承包人应建立有效的质量管理体系，保证施工符合合同要求",false,{"key":24,"text":25,"correct":26},"B","按照工程师认可的质量管理体系施工，发生质量事故由业主承担责任",true,{"key":28,"text":29,"correct":22},"C","业主对图纸资料的真实性和正确性负责，承包人对自己的理解或推论负责",{"key":31,"text":32,"correct":26},"D","发生合同规定之外的检查和试验，由业主承担费用",{"key":34,"text":35,"correct":22},"E","承包人使用的施工设备影响了工程进度时，承包人应自费增加或更换施工设备","BD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},937923,"（2017年真题）根据《标准施工招标文件》 (2007 年版)，下列情形中，应由发包人承担由此增加的费用并支付承包人合理利润的有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"在施工现场遇到不可预见的地质条件",{"key":24,"text":45,"correct":26},"提供图纸延误",{"key":28,"text":47,"correct":26},"未按合同约定及时支付预付款、进度款",{"key":31,"text":49,"correct":26},"增加合同工作内容",{"key":34,"text":51,"correct":22},"异常恶劣的气候条件造成工程暂停","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},937924,"（2013年真题）关于FIDIC《施工合同条件》合同争端裁决委员会的说法，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"合同争议可提交合同争端裁决委员会进行裁决",{"key":24,"text":60,"correct":22},"合同争端裁决委员会应在收到争议后56天内作出裁决",{"key":28,"text":62,"correct":22},"作出裁决后的56天内合同双方无异议则裁决为最终决定",{"key":31,"text":64,"correct":26},"任何一方对裁决不满可在28天内将争议提交仲裁",{"key":34,"text":66,"correct":26},"仲裁部门收到仲裁申请后应在56天内开始审理","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},937925,"（2013年真题）关于FIDIC《施工合同条件》指定分包商的说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"指定分包商由业主选定",{"key":24,"text":75,"correct":26},"在承包商确定后才选择指定分包商",{"key":28,"text":77,"correct":22},"指定分包商与业主直接签订分包合同",{"key":31,"text":79,"correct":26},"对指定分包商的管理纳入承包商的管理之中",{"key":34,"text":81,"correct":26},"指定分包商是完成某项特定工作内容的特殊分包商","ABDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},937926,"（2013年真题）关于 FIDIC《施工合同条件》指定分包商的说法，正确的有( )。",[87,89,90,92,93],{"key":20,"text":88,"correct":26},"指定分包商由业主指定",{"key":24,"text":75,"correct":22},{"key":28,"text":91,"correct":22},"指定分包商与业主签订分包合同",{"key":31,"text":79,"correct":26},{"key":34,"text":81,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},937927,"（2010年真题）下列关于FIDIC施工合同条件下缺陷通知期的说法，正确的是( )。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"缺陷通知期不同于国内施工合同所指的工程保修期",{"key":24,"text":101,"correct":26},"缺陷通知期自工程接收证书中写明的竣工日开始",{"key":28,"text":103,"correct":22},"承包商应在缺陷通知期开始前将工程所有工作完成",{"key":31,"text":105,"correct":26},"缺陷通知期内工程出现质量问题由承包商负责",{"key":34,"text":107,"correct":26},"缺陷通知期为考验工程动态进行中是否达到合同要求而设置","BDE",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":123,"analysis":37},937928,"（2016年真题）下列关于合同生效的说法，正确的有（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":26},"依法成立的合同，自成立时生效",{"key":24,"text":116,"correct":26},"当事人对合同的效力可以约定附条件",{"key":28,"text":118,"correct":26},"当事人采用合同书形式订立合同的，自双方当事人签字或盖章时合同成立",{"key":31,"text":120,"correct":26},"合同订立地点指合同双方签字盖章的地点",{"key":34,"text":122,"correct":22},"合同订立的时间就是合同生效的时间","ABCD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},937929,"（2013年真题）发包人的义务主要有（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":26},"提供施工场地",{"key":24,"text":131,"correct":22},"保护施工场地",{"key":28,"text":133,"correct":26},"组织设计交底",{"key":31,"text":135,"correct":22},"缴纳工程税费",{"key":34,"text":137,"correct":26},"组织竣工验收","ACE",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":82,"analysis":37},937930,"（2011年真题）货物现场监造工作中，咨询工程师的工作主要有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":26},"聘请有资格的检验机构承担检验工作",{"key":24,"text":146,"correct":26},"根据货物采购合同制订监造检验计划",{"key":28,"text":148,"correct":22},"设备制造开始后组织召开制造厂协调会议",{"key":31,"text":150,"correct":26},"设备制造完毕后做好出厂前检验测试",{"key":34,"text":152,"correct":26},"了解制造厂质量保证体系文件实施情况",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":36,"analysis":37},937931,"（2017年真题）根据FIDIC 施工合同条件，下列关于工程质量管理条款的说法，错误的有（ ）。",[157,158,159,160,161],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"key":34,"text":35,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":52,"analysis":37},937932,"（2012年真题）承包人的义务主要有（ ）。",[166,168,170,172,174],{"key":20,"text":167,"correct":22},"发出开工通知",{"key":24,"text":169,"correct":26},"照管和维护未竣工工程",{"key":28,"text":171,"correct":26},"设计临时设施",{"key":31,"text":173,"correct":26},"保护施工场地周边环境",{"key":34,"text":137,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":189,"analysis":37},937933,"（2010年真题）工程项目材料采购合同条款主要涉及材料的( )等。",[179,181,183,185,187],{"key":20,"text":180,"correct":26},"交接程序",{"key":24,"text":182,"correct":26},"检验方式",{"key":28,"text":184,"correct":22},"性能保修",{"key":31,"text":186,"correct":26},"质量要求",{"key":34,"text":188,"correct":22},"安装调试","ABD",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":138,"analysis":37},937934,"（2013年真题）根据《标准施工招标文件》，发包人的义务主要有( )。",[194,195,196,197,198],{"key":20,"text":129,"correct":26},{"key":24,"text":131,"correct":22},{"key":28,"text":133,"correct":26},{"key":31,"text":135,"correct":22},{"key":34,"text":137,"correct":26},{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":52,"analysis":37},937935,"（2012年真题）根据《标准施工招标文件》 (2007年版)，承包人的义务主要有( )",[203,204,205,206,207],{"key":20,"text":167,"correct":22},{"key":24,"text":169,"correct":26},{"key":28,"text":171,"correct":26},{"key":31,"text":173,"correct":26},{"key":34,"text":137,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":222,"analysis":37},937936,"（2017年真题）根据《标准施工招标文件》 (2007 年版)，下列关于隐蔽工程检查的说法，错误的有( )。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"承包人自检确定隐蔽工程具备覆盖条件的，应通知监理人在约定的期限内检查",{"key":24,"text":215,"correct":22},"监理人检查隐蔽工程发现质量不合格的，承包人应自费完成修复",{"key":28,"text":217,"correct":22},"监理人未按时进行检查也未提出延期要求的，视为隐蔽工程检查合格",{"key":31,"text":219,"correct":26},"监理人检查完毕且承包人覆盖隐蔽工程后，监理人不能再要求对隐蔽工程进行重新检查",{"key":34,"text":221,"correct":26},"承包人私自将隐蔽工程覆盖的，监理人有权指示承包人揭开检查，如果质量合格，由此增加的费用由发包人承担","DE",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},937937,"（2008年真题）货物催交工作中，咨询工程师的主要工作包括( )。",[227,229,231,233,235],{"key":20,"text":228,"correct":26},"督促供货人按期提交货物",{"key":24,"text":230,"correct":22},"向供货人提交制造进度表",{"key":28,"text":232,"correct":26},"检查货物装运准备情况",{"key":31,"text":234,"correct":26},"检查货物关键工序生产情况",{"key":34,"text":236,"correct":26},"检查供货人原材料采购进展情况","ACDE",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":36,"analysis":37},937938,"（2011年真题）关于 FIDIC 合同条件中合同担保的说法，正确的有( )。",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"履约保函的有效期至工程师颁发工程接受证书时止",{"key":24,"text":245,"correct":26},"预付款保函为不需承包商确认违约的无条件担保形式",{"key":28,"text":247,"correct":22},"通用条件中明确规定了业主可凭保函索赔的5种情形",{"key":31,"text":249,"correct":26},"承包商接受预付款前应提供预付款担保",{"key":34,"text":251,"correct":22},"承包商签订合同后应提供履约担保",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":123,"analysis":37},937939,"（2016年真题）下列关于合同生效的说法正确的是( )。",[256,257,258,259,260],{"key":20,"text":114,"correct":26},{"key":24,"text":116,"correct":26},{"key":28,"text":118,"correct":26},{"key":31,"text":120,"correct":26},{"key":34,"text":122,"correct":22},{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":275,"analysis":37},937940,"（2017年真题）根据《标准施工招标文件》(2007年版)，下列关于解决合同争议的说法，正确的有( )。",[265,267,269,271,273],{"key":20,"text":266,"correct":26},"在争议评审、仲裁或诉讼过程中，发包人和承包人均可共同努力友好协商解决争议",{"key":24,"text":268,"correct":26},"发包人和承包人应在开工日后的28天内或在争议发生后，协商成立争议评审组",{"key":28,"text":270,"correct":26},"争议评审组的评审意见并不具有法律强制性",{"key":31,"text":272,"correct":22},"友好协商解决不成的，才可以向约定的仲裁委员会申请仲裁",{"key":34,"text":274,"correct":22},"合同中可同时将仲裁和诉讼约定为解决争议的方式","ABC",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":67,"analysis":37},937941,"（2013年真题）关于 FIDIC《施工合同条件》合同争端裁决委员会的说法，正确的有( )。",[280,281,282,283,284],{"key":20,"text":58,"correct":26},{"key":24,"text":60,"correct":22},{"key":28,"text":62,"correct":22},{"key":31,"text":64,"correct":26},{"key":34,"text":285,"correct":26},"仲裁机构收到仲裁申请后应在56天才开始审理",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":189,"analysis":37},937942,"（2012年真题）FIDIC 合同条件下，承包商编制施工进度计划时应说明拟采用的( )",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"进度计划安排",{"key":24,"text":293,"correct":26},"施工组织方案",{"key":28,"text":295,"correct":22},"月支付费用",{"key":31,"text":297,"correct":26},"施工方法",{"key":34,"text":299,"correct":22},"预付款扣还方式",{"id":301,"libraryId":5,"type":302,"typeLabel":303,"stem":304,"options":305,"answer":20,"analysis":37},937943,1,"单选题","（2013年真题）在双代号或单代号网络计划中，工作的最早开始时间应为其所有紧前工作（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"最早完成时间的最大值",{"key":24,"text":309,"correct":22},"最早完成时间的最小值",{"key":28,"text":311,"correct":22},"最迟完成时间的最大值",{"key":31,"text":313,"correct":22},"最迟完成时间的最小值",{"id":315,"libraryId":5,"type":302,"typeLabel":303,"stem":316,"options":317,"answer":31,"analysis":37},937944,"（2004年真题）M 工作与 N 工作之间的逻辑关系为工艺关系，说明他们之间的先后顺序是由( )决定的。",[318,320,322,324],{"key":20,"text":319,"correct":22},"人力调配需要",{"key":24,"text":321,"correct":22},"材料供应需要",{"key":28,"text":323,"correct":22},"资金调配需要",{"key":31,"text":325,"correct":26},"工作程序需要",{"id":327,"libraryId":5,"type":302,"typeLabel":303,"stem":328,"options":329,"answer":31,"analysis":37},937945,"（2013年真题）双代号网络计划中，关键工作是指( )。",[330,332,334,336],{"key":20,"text":331,"correct":22},"自由时差最小的工作",{"key":24,"text":333,"correct":22},"两端节点均为关键节点的工作",{"key":28,"text":335,"correct":22},"持续时间最长的工作",{"key":31,"text":337,"correct":26},"最迟完成时间与最早完成时间的相差最小的工作",{"id":339,"libraryId":5,"type":302,"typeLabel":303,"stem":340,"options":341,"answer":31,"analysis":37},937946,"（2014年真题） 工程项目工作定义的基本依据是( )中做出的工作分解结构(WBS)",[342,344,346,348],{"key":20,"text":343,"correct":22},"进度管理",{"key":24,"text":345,"correct":22},"合同管理",{"key":28,"text":347,"correct":22},"工程管理",{"key":31,"text":349,"correct":26},"范围管理",{"id":351,"libraryId":5,"type":302,"typeLabel":303,"stem":352,"options":353,"answer":31,"analysis":37},937947,"（2011年真题）工程项目进度管理中，工作定义的主要任务是( )。",[354,356,358,360],{"key":20,"text":355,"correct":22},"制订出完成各项具体工作的时间进度安排",{"key":24,"text":357,"correct":22},"对完成各项具体工作所需要的时间进行估计推算",{"key":28,"text":359,"correct":22},"找出各项具体工作之问的逻辑关系并形成文件",{"key":31,"text":361,"correct":26},"确定为产生各项可交付成果必须进行的具体工作",{"id":363,"libraryId":5,"type":302,"typeLabel":303,"stem":364,"options":365,"answer":31,"analysis":37},937948,"（2010年真题）对工作分解结构(WBS)中规定的可交付成果或半成品必须进行的工作进行界定，并形成相应的文件，这是( )的含义",[366,368,370,372],{"key":20,"text":367,"correct":22},"工作成果",{"key":24,"text":369,"correct":22},"工作清单",{"key":28,"text":371,"correct":22},"工作顺序",{"key":31,"text":373,"correct":26},"工作定义",{"id":375,"libraryId":5,"type":302,"typeLabel":303,"stem":376,"options":377,"answer":28,"analysis":37},937949,"（2012年真题）关于双代号时标网络计划的说法，错误的是( )",[378,380,382,384],{"key":20,"text":379,"correct":22},"实箭线的水平投影长度表示该工作的持续时间",{"key":24,"text":381,"correct":22},"波形线表示工作与其紧后工作之间的时间间隔",{"key":28,"text":383,"correct":26},"时标网络计划宜按各项工作的最晚开始时间编制",{"key":31,"text":385,"correct":22},"双代号时标网络计划以水平时间坐标为尺度进行绘制",{"id":387,"libraryId":5,"type":302,"typeLabel":303,"stem":388,"options":389,"answer":20,"analysis":37},937950,"（2016年真题）( )阶段的资源投入对整个工程项目总体投资的影响程度是最重要的。",[390,392,394,396],{"key":20,"text":391,"correct":26},"决策",{"key":24,"text":393,"correct":22},"实施",{"key":28,"text":395,"correct":22},"准备",{"key":31,"text":397,"correct":22},"竣工",{"id":399,"libraryId":5,"type":302,"typeLabel":303,"stem":400,"options":401,"answer":28,"analysis":37},937951,"（2017年真题）估算工作时间的模拟法最常用的是( )",[402,404,406,408],{"key":20,"text":403,"correct":22},"类似模拟法",{"key":24,"text":405,"correct":22},"数字模拟法",{"key":28,"text":407,"correct":26},"蒙特卡罗分析法",{"key":31,"text":409,"correct":22},"情景模拟法",{"id":411,"libraryId":5,"type":302,"typeLabel":303,"stem":412,"options":413,"answer":28,"analysis":37},937952,"（2005年真题）在双代号或单代号网络计划中，判别为关键工作的条件是该工作( C )。",[414,416,418,420],{"key":20,"text":415,"correct":22},"自由时差最小",{"key":24,"text":417,"correct":22},"与其紧后工作之间的时间间隔为零",{"key":28,"text":419,"correct":26},"最迟开始与最早开始时间的差值最小",{"key":31,"text":421,"correct":22},"资源消耗最多",{"id":423,"libraryId":5,"type":302,"typeLabel":303,"stem":424,"options":425,"answer":28,"analysis":37},937953,"（2012年真题）某工程双代号网络计划如图所示，其中关键线路有( )条",[426,428,430,432],{"key":20,"text":427,"correct":22},"2",{"key":24,"text":429,"correct":22},"3",{"key":28,"text":431,"correct":26},"4",{"key":31,"text":433,"correct":22},"5",{"id":435,"libraryId":5,"type":302,"typeLabel":303,"stem":436,"options":437,"answer":24,"analysis":37},937954,"（2017年真题）某工程项目实施过程的部分时间参数如下表所示 其中，总时差最大的活动是( )",[438,439,440,441],{"key":20,"text":24,"correct":22},{"key":24,"text":31,"correct":26},{"key":28,"text":34,"correct":22},{"key":31,"text":442,"correct":22},"G",{"id":444,"libraryId":5,"type":302,"typeLabel":303,"stem":445,"options":446,"answer":31,"analysis":37},937955,"（2016年真题）某工作网络计划中，N 工作的最早开始时间和最早完成时间分别为第 5 天和第 8 天，最迟开始时间和最迟完成时间分别为第 7 天和第 10 天，则工作 N 的总时差为( )天。",[447,448,449,450],{"key":20,"text":433,"correct":22},{"key":24,"text":431,"correct":22},{"key":28,"text":429,"correct":22},{"key":31,"text":427,"correct":26},{"id":452,"libraryId":5,"type":302,"typeLabel":303,"stem":453,"options":454,"answer":28,"analysis":37},937956,"（2010年真题）某工程网络计划中，N 工作的最早开始时间和最早完成时间分别为第 5 天和第 7 天，最迟开始时间和最迟完成时间分别为第 8 天和第 10 天，则 N 工作的总时差是( )天。",[455,457,458,459],{"key":20,"text":456,"correct":22},"6",{"key":24,"text":431,"correct":22},{"key":28,"text":429,"correct":26},{"key":31,"text":427,"correct":22},{"id":461,"libraryId":5,"type":302,"typeLabel":303,"stem":462,"options":463,"answer":31,"analysis":37},937957,"（2018年真题）工程网络计划的工期优化是通过( )，使计算工期满足要求工期。",[464,466,468,470],{"key":20,"text":465,"correct":22},"改变关键工作之间的逻辑关系",{"key":24,"text":467,"correct":22},"将关键工作压缩成非关键工作",{"key":28,"text":469,"correct":22},"压缩直接费最小的工作的持续时间",{"key":31,"text":471,"correct":26},"压缩关键工作的持续时间",{"id":473,"libraryId":5,"type":302,"typeLabel":303,"stem":474,"options":475,"answer":28,"analysis":37},937958,"（2014年真题）某工程拟将持续时间由 15 天缩短为 13 天，持续时间为 15 天时总费用为 10 万元，其中直接费用为 8 万元，持续时间为 13 天时直接费用为 10 万元。缩短持续时间的间接费用率为 0.1 万元\u002F天，则工程持续时间缩短后总费用为( )。",[476,478,480,482],{"key":20,"text":477,"correct":22},"12.0万元",{"key":24,"text":479,"correct":22},"11.1万元",{"key":28,"text":481,"correct":26},"11.8万元",{"key":31,"text":483,"correct":22},"10.2万元",{"id":485,"libraryId":5,"type":302,"typeLabel":303,"stem":486,"options":487,"answer":31,"analysis":37},937959,"（2010年真题）在工程项目进度资源优化管理中，影响进度的主要因素是( )。",[488,490,492,494],{"key":20,"text":489,"correct":22},"资源的需求情况",{"key":24,"text":491,"correct":22},"资源的配置情况",{"key":28,"text":493,"correct":22},"资源的利用情况",{"key":31,"text":495,"correct":26},"资源的供应情况",{"id":497,"libraryId":5,"type":302,"typeLabel":303,"stem":498,"options":499,"answer":31,"analysis":37},937960,"（2014年真题）工程双代号时标网络计划如图所示，当计划执行到第 5 周末检查时，其实际进度如图中前锋线所示，检查结果表明( )",[500,502,504,506],{"key":20,"text":501,"correct":22},"D工作滞后1周，不影响总工期",{"key":24,"text":503,"correct":22},"I工作滞后1周，预计总工期延长1周",{"key":28,"text":505,"correct":22},"E工作提前1周，预计总工期缩短1周",{"key":31,"text":507,"correct":26},"H工作提前1周，不影响总工期",{"id":509,"libraryId":5,"type":302,"typeLabel":303,"stem":510,"options":511,"answer":31,"analysis":37},937961,"（2016年真题）偏差对后续工期的影响通常需要借助网络计划进行判断，根据该项目是否处于关键线路、其进度偏差是否超过该项工作的( )来判断。",[512,514,516,518],{"key":20,"text":513,"correct":22},"最早开始时间",{"key":24,"text":515,"correct":22},"最迟开始时间",{"key":28,"text":517,"correct":22},"总时差和总工期",{"key":31,"text":519,"correct":26},"总时差和自由时差",{"id":521,"libraryId":5,"type":302,"typeLabel":303,"stem":522,"options":523,"answer":20,"analysis":37},937962,"（2016年真题）工程项目进度管理中，可以称为软逻辑关系的是( )。",[524,526,528,530],{"key":20,"text":525,"correct":26},"组织关系",{"key":24,"text":527,"correct":22},"工艺关系",{"key":28,"text":529,"correct":22},"时间关系",{"key":31,"text":531,"correct":22},"工序关系",{"id":533,"libraryId":5,"type":302,"typeLabel":303,"stem":534,"options":535,"answer":28,"analysis":37},937963,"（2017年真题）在工程项目建设中，普通人员及材料设备的需要量高峰值通常出现在( )。",[536,538,539,540],{"key":20,"text":537,"correct":22},"前期",{"key":24,"text":395,"correct":22},{"key":28,"text":393,"correct":26},{"key":31,"text":541,"correct":22},"试生产及竣工验收",{"id":543,"libraryId":5,"type":302,"typeLabel":303,"stem":544,"options":545,"answer":28,"analysis":37},937964,"（2012年真题）工程项目投资建设各阶段中，资源消耗量最大的是项目( )阶段。",[546,547,548,549],{"key":20,"text":391,"correct":22},{"key":24,"text":395,"correct":22},{"key":28,"text":393,"correct":26},{"key":31,"text":397,"correct":22},{"id":551,"libraryId":5,"type":302,"typeLabel":303,"stem":552,"options":553,"answer":28,"analysis":37},937965,"（2016年真题）PERT 与 CPM 的根本区别在于 PERT 使用了( C )时间估计。",[554,556,558,560],{"key":20,"text":555,"correct":22},"最大可能",{"key":24,"text":557,"correct":22},"平均",{"key":28,"text":559,"correct":26},"加权平均",{"key":31,"text":561,"correct":22},"最小可能",{"id":563,"libraryId":5,"type":302,"typeLabel":303,"stem":564,"options":565,"answer":31,"analysis":37},937966,"（2011年真题）工程项目进度管理中，计划评审技术对时间的估算采用( )估算方法。",[566,568,570,572],{"key":20,"text":567,"correct":22},"总时间",{"key":24,"text":569,"correct":22},"最大可能时间",{"key":28,"text":571,"correct":22},"阶段时间",{"key":31,"text":573,"correct":26},"加权平均时间",{"id":575,"libraryId":5,"type":302,"typeLabel":303,"stem":576,"options":577,"answer":24,"analysis":37},937967,"（2013年真题）某工程双代号时标网络计划如下图所示，其中工作 B 和 E 的总时差和自由时差分别为( )。",[578,580,582,584],{"key":20,"text":579,"correct":22},"1周和1周；1周和1周",{"key":24,"text":581,"correct":26},"3周和1周；2周和1周",{"key":28,"text":583,"correct":22},"3周和3周；2周，0周",{"key":31,"text":585,"correct":22},"4周和3周；3周和2周",{"id":587,"libraryId":5,"type":302,"typeLabel":303,"stem":588,"options":589,"answer":24,"analysis":37},937968,"（2009年真题）某分部工程双代号时标网络计划如图 9－16 所示，则工作 B 的总时差和自由时差分别是( )",[590,592,594,596],{"key":20,"text":591,"correct":22},"0天，0天",{"key":24,"text":593,"correct":26},"2天，0天",{"key":28,"text":595,"correct":22},"2天，2天",{"key":31,"text":597,"correct":22},"4天，0天",{"id":599,"libraryId":5,"type":302,"typeLabel":303,"stem":600,"options":601,"answer":20,"analysis":37},937969,"（2007年真题）M 工作有 2 个紧前工作，其持续时间分别是 6 天和 10 天，最早开工时间分别为第 15 天和第 20 天，则 M 工作的最早开始时间为第( )天。",[602,604,606,608],{"key":20,"text":603,"correct":26},"30",{"key":24,"text":605,"correct":22},"26",{"key":28,"text":607,"correct":22},"25",{"key":31,"text":609,"correct":22},"21",{"id":611,"libraryId":5,"type":302,"typeLabel":303,"stem":612,"options":613,"answer":31,"analysis":37},937970,"（2008年真题）某双代号网络计划如下图所示，工作 D 的总时差和自由时差分别为( )。",[614,616,618,620],{"key":20,"text":615,"correct":22},"1天和1天",{"key":24,"text":617,"correct":22},"1天和2天",{"key":28,"text":619,"correct":22},"2天和l天",{"key":31,"text":621,"correct":26},"2天和2天",{"id":623,"libraryId":5,"type":302,"typeLabel":303,"stem":624,"options":625,"answer":24,"analysis":37},937971,"（2005年真题）某工程单代号网络计划中，M 工作的最早开始时间和最迟开始时间分别是第 12 天和第 15天，其持续时间为 6 天，M 工作有 3 项紧后工作，它们的最早开始时间分别是第 21 天，第 24 天，第28 天，则 M 工作的自由时差是( )天。",[626,628,629,630],{"key":20,"text":627,"correct":22},"1",{"key":24,"text":429,"correct":26},{"key":28,"text":431,"correct":22},{"key":31,"text":631,"correct":22},"8",[633,636,639,642,645,648],{"id":302,"name":634,"category":7,"favorite":635},"领导干部任职前廉政法规知识测试题",92,{"id":637,"name":638,"category":7,"favorite":302},595,"建筑结构与设备",{"id":640,"name":641,"category":7,"favorite":302},715,"招标采购专业知识与法律法规",{"id":643,"name":644,"category":7,"favorite":302},848,"市政方向-通用基础",{"id":646,"name":647,"category":7,"favorite":8},534,"BIM工程师",{"id":649,"name":647,"category":7,"favorite":8},535]