[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,5,50,1948,[13,38,53,68,83,98,113,127,142,156,170,182,194,206,218,230,242,253,265,275,287,299,311,323,331,343,355,366,378,390,402,414,426,438,450,462,474,482,494,506,518,526,538,550,562,574,586,594,602,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},937871,2,"多选题","（2014年真题）减小管理幅度对项目组织产生的影响主要有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","减少管理层次",false,{"key":24,"text":25,"correct":22},"B","减少用于协调的时间和费用",{"key":27,"text":28,"correct":29},"C","信息传递中易发生信息丢失",true,{"key":31,"text":32,"correct":29},"D","降低办事效率",{"key":34,"text":35,"correct":22},"E","减少对下属的监督时间","CD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},937872,"（2013年真题）关于矩阵式项目组织结构优点的说法，错误的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"团队工作目标明确",{"key":24,"text":45,"correct":29},"项目管理权力平衡容易",{"key":27,"text":47,"correct":22},"部门资源利用率高",{"key":31,"text":49,"correct":22},"项目团队成员一般无去向担忧",{"key":34,"text":51,"correct":29},"信息回路简单，沟通效率高","BE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},937873,"（2013年真题）根据职务特征模型，决定工作职务重要程度的特征有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"信息反馈性",{"key":24,"text":60,"correct":29},"技能多样性",{"key":27,"text":62,"correct":22},"决策自主性",{"key":31,"text":64,"correct":29},"任务同一性",{"key":34,"text":66,"correct":29},"任务重要性","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},937874,"（2016年真题）评价是指对员工的工作业绩、工作态度、工作能力等方面进行检查和评定，可采取（ ）方式进行。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"指标考核",{"key":24,"text":75,"correct":29},"团队评议",{"key":27,"text":77,"correct":29},"自我评价",{"key":31,"text":79,"correct":22},"客户评价",{"key":34,"text":81,"correct":22},"领导考核","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},937875,"（2016年真题）项目经理要做好内外关系的协调，主要包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"定期向客户汇报",{"key":24,"text":90,"correct":29},"与有关主管领导保持信息的畅通",{"key":27,"text":92,"correct":29},"与项目所在单位的职能部门保持适当的互动关系",{"key":31,"text":94,"correct":29},"在团队内部形成统一、有序、高效的工作氛围",{"key":34,"text":96,"correct":22},"项目成果总结与报送","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},937876,"（2010年真题）根据《中华人民共和国招投标法实施条例》，下列关于两阶段招标的说法，错误的是有( )",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"两阶段招标适用于所有类型的招标项目",{"key":24,"text":105,"correct":29},"在第一阶段招标人应向投标人发出招标文件",{"key":27,"text":107,"correct":22},"在第一阶段招标人应要求投标人提交技术建议",{"key":31,"text":109,"correct":29},"在第二阶段招标人应与投标人就技术建议内容进行协商和讨论",{"key":34,"text":111,"correct":22},"招标文件要求提交投标保证金的，投标人应在第二价段按规定缴纳","ABD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":82,"analysis":37},937877,"（2014年真题）评标委员会可以书面方式要求投标人对投标文件进行必要的澄清，澄清的内容主要有( )。",[117,119,121,123,125],{"key":20,"text":118,"correct":29},"招标文件中含义不清的内容",{"key":24,"text":120,"correct":29},"有明显文字和计算错误的内容",{"key":27,"text":122,"correct":29},"同类问题表述不一致的内容",{"key":31,"text":124,"correct":22},"技术措施的遗漏",{"key":34,"text":126,"correct":22},"投标报价中的缺项",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},937878,"（2016年真题）有下列情形之一的，经批准可以进行邀请招标( )",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"受自然地域环境限制，只有少量潜在投标人可供选择的",{"key":24,"text":134,"correct":29},"涉及国家安全、国家秘密或者抢险救灾，适宜招标但不宜公开招标的",{"key":27,"text":136,"correct":29},"采用公开招标方式的费用占项目合同金额的比例过大的",{"key":31,"text":138,"correct":29},"涉及国家安全、国家秘密的",{"key":34,"text":140,"correct":22},"使用专利技术的","ABCD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":36,"analysis":37},937879,"（2017年真题）下列关于工程施工招标踏勘现场的说法，正确的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"所有工程项目都必须组织投标人踏勘项目现场",{"key":24,"text":149,"correct":22},"如果投标人过多，招标人可以组织投标人分批次踏勘现场",{"key":27,"text":151,"correct":29},"投标人踏勘现场的主要目的是了解工程现场客观条件",{"key":31,"text":153,"correct":29},"招标人应主动向投标人介绍工程现场情况",{"key":34,"text":155,"correct":22},"投标人依据招标人介绍情况做出的决策，由招标人负责",{"id":157,"libraryId":5,"type":158,"typeLabel":159,"stem":160,"options":161,"answer":24,"analysis":37},937880,1,"单选题","（2009年真题）招标投标活动必须按照规定的时间和程序进行，按照事先公布的标准公选择中标人，这属于招投标要求遵循的( )原则。",[162,164,166,168],{"key":20,"text":163,"correct":22},"公开",{"key":24,"text":165,"correct":29},"公正",{"key":27,"text":167,"correct":22},"公平",{"key":31,"text":169,"correct":22},"诚实信用",{"id":171,"libraryId":5,"type":158,"typeLabel":159,"stem":172,"options":173,"answer":24,"analysis":37},937882,"（2017年真题）根据《建设工程施工合同（示范文本）》，下列关于工程开工的说法，错误的是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"承包人应向监理人提交工程开工报审表，经监理人报发包人批准后执行",{"key":24,"text":177,"correct":29},"工期自监理人签发开工通知之日开始计算",{"key":27,"text":179,"correct":22},"因发包人原因造成开工通知未按合同约定日期发出的，发包人应承担责任",{"key":31,"text":181,"correct":22},"开工前，发包人应按照法律规定获得工程施工许可",{"id":183,"libraryId":5,"type":158,"typeLabel":159,"stem":184,"options":185,"answer":27,"analysis":37},937883,"（2014年真题）货物采购合同履行过程中，采购方驻厂代表催交工作的重点是保证货物生产的（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":22},"安全",{"key":24,"text":189,"correct":22},"原料供应",{"key":27,"text":191,"correct":29},"进度",{"key":31,"text":193,"correct":22},"成本控制",{"id":195,"libraryId":5,"type":158,"typeLabel":159,"stem":196,"options":197,"answer":24,"analysis":37},937884,"（2012年真题）关于FIDIC 施工合同条件中合同担保的说法，正确的是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"承包商接收预付款前可以不提供预付款担保",{"key":24,"text":201,"correct":29},"履约保函为无条件担保形式",{"key":27,"text":203,"correct":22},"履约保函的有效期到工程师颁发工程接受证书时为止",{"key":31,"text":205,"correct":22},"通用条件中明确规定了5种业主可凭履约保函索赔的情形",{"id":207,"libraryId":5,"type":158,"typeLabel":159,"stem":208,"options":209,"answer":31,"analysis":37},937885,"（2016年真题）建设工程施工合同文件包括：①协议书；②投标书；③中标通知书；④合同通用条款；⑤合同专用条款；⑥工程量清单。当各合同文件对同一事项的解释出现不一致时，优先解释顺序为（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"③-①-②-⑤-④-⑥",{"key":24,"text":213,"correct":22},"②-③-①-⑤-④-⑥",{"key":27,"text":215,"correct":22},"③-②-①-④-⑥-⑤",{"key":31,"text":217,"correct":29},"①-③-②-⑤-④-⑥",{"id":219,"libraryId":5,"type":158,"typeLabel":159,"stem":220,"options":221,"answer":27,"analysis":37},937886,"（2014年真题）FIDIC 合同通用条件中，“接受的合同款额”是指（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"承包商完成建造任务后，业主支付的数额",{"key":24,"text":225,"correct":22},"承包商对所有合格工程有权获得的工程款",{"key":27,"text":227,"correct":29},"业主在中标函中对实施、完成和修复工程缺陷所接受的金额",{"key":31,"text":229,"correct":22},"承包商对实施、完成和修复工程缺陷所接受的金额",{"id":231,"libraryId":5,"type":158,"typeLabel":159,"stem":232,"options":233,"answer":20,"analysis":37},937887,"（2013年真题）根据FIDIC《施工合同条件》，承包商完成建造和保修任务后，对所有合格工程有权获得的全部工程款称为（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":29},"合同价格",{"key":24,"text":237,"correct":22},"接受的合同款额",{"key":27,"text":239,"correct":22},"合同结算价格",{"key":31,"text":241,"correct":22},"合同决算价格",{"id":243,"libraryId":5,"type":158,"typeLabel":159,"stem":244,"options":245,"answer":24,"analysis":37},937888,"（2012年真题）合同任何一方不得把自己的意志强加于另一方，这是合同管理的（ ）原则的要求。",[246,247,249,251],{"key":20,"text":169,"correct":22},{"key":24,"text":248,"correct":29},"平等自愿",{"key":27,"text":250,"correct":22},"等价有偿",{"key":31,"text":252,"correct":22},"公平公正",{"id":254,"libraryId":5,"type":158,"typeLabel":159,"stem":255,"options":256,"answer":24,"analysis":37},937889,"（2016年真题）由监理人委派常驻施工现场对合同进行实施管理的全权负责人是( )。",[257,259,261,263],{"key":20,"text":258,"correct":22},"监理工程师",{"key":24,"text":260,"correct":29},"总监理工程师",{"key":27,"text":262,"correct":22},"项目经理",{"key":31,"text":264,"correct":22},"技术负责人",{"id":266,"libraryId":5,"type":158,"typeLabel":159,"stem":267,"options":268,"answer":20,"analysis":37},937890,"（2018年真题）订立合同时双方当事人的权利和义务应当对等，这体现了工程项目合同管理中的( )原则",[269,270,272,273],{"key":20,"text":167,"correct":29},{"key":24,"text":271,"correct":22},"信用",{"key":27,"text":165,"correct":22},{"key":31,"text":274,"correct":22},"诚实",{"id":276,"libraryId":5,"type":158,"typeLabel":159,"stem":277,"options":278,"answer":20,"analysis":37},937891,"（2017年真题）根据《建设工程施工合同(示范文本)》，下列合同文件内容不一致时，优先解释等级最高的文件是( )",[279,281,283,285],{"key":20,"text":280,"correct":29},"合同协议书",{"key":24,"text":282,"correct":22},"中标通知书",{"key":27,"text":284,"correct":22},"投标函及其附录",{"key":31,"text":286,"correct":22},"合同条款",{"id":288,"libraryId":5,"type":158,"typeLabel":159,"stem":289,"options":290,"answer":24,"analysis":37},937892,"（2012年真题）根据《标准施工招标文件》 (2007年版)，承包人的义务应包括( )",[291,293,295,297],{"key":20,"text":292,"correct":22},"发出开工通知",{"key":24,"text":294,"correct":29},"设计临时设施",{"key":27,"text":296,"correct":22},"组织竣工验收",{"key":31,"text":298,"correct":22},"进行设计交底",{"id":300,"libraryId":5,"type":158,"typeLabel":159,"stem":301,"options":302,"answer":31,"analysis":37},937893,"（2016年真题）下列关于工程隐蔽部位覆盖前的检查说法错误的是( )。",[303,305,307,309],{"key":20,"text":304,"correct":22},"工程隐蔽部位施工作业完成后，必须在覆盖前由承包人先行自检",{"key":24,"text":306,"correct":22},"工程隐蔽部位经监理人检查合格并签证后，才能进行下一道工序",{"key":27,"text":308,"correct":22},"承包人私自覆盖的工程，监理人有权指示承包人进行补检，无论结果如何，责任均由承包人承担",{"key":31,"text":310,"correct":29},"由发包人提供的材料或工程设备不合格造成的工程不合格的，由发包人采取补救措施",{"id":312,"libraryId":5,"type":158,"typeLabel":159,"stem":313,"options":314,"answer":24,"analysis":37},937894,"（2017年真题）根据《标准施工招标文件》 (2007 年版)，下列关于合同变更的说法错误的是( )。",[315,317,319,321],{"key":20,"text":316,"correct":22},"发包人和监理人均可提出变更",{"key":24,"text":318,"correct":29},"发包人可直接向承包人发出变更指示",{"key":27,"text":320,"correct":22},"承包人收到经发包人签认的变更指示后，方可实施变更",{"key":31,"text":322,"correct":22},"若承包人认为变更指示不能执行，应立即说明理由",{"id":324,"libraryId":5,"type":158,"typeLabel":159,"stem":325,"options":326,"answer":27,"analysis":37},937895,"（2014年真题）货物采购合同履行过程中，采购方驻场代表催交工作的重点是保证货物生产的( )。",[327,328,329,330],{"key":20,"text":187,"correct":22},{"key":24,"text":189,"correct":22},{"key":27,"text":191,"correct":29},{"key":31,"text":193,"correct":22},{"id":332,"libraryId":5,"type":158,"typeLabel":159,"stem":333,"options":334,"answer":31,"analysis":37},937896,"（2011年真题）下列工作中，不属于货物采购合同中现场监造检验工作的是( )。",[335,337,339,341],{"key":20,"text":336,"correct":22},"对运输条件的检验",{"key":24,"text":338,"correct":22},"对中间产品的检验",{"key":27,"text":340,"correct":22},"对原材料进货的检验",{"key":31,"text":342,"correct":29},"对入库货物的抽查检验",{"id":344,"libraryId":5,"type":158,"typeLabel":159,"stem":345,"options":346,"answer":24,"analysis":37},937897,"（2013年真题）根据 FIDIC《施工合同条件》，业主提供的支付担保期限至缺陷通知期满后( )。",[347,349,351,353],{"key":20,"text":348,"correct":22},"3个月",{"key":24,"text":350,"correct":29},"6个月",{"key":27,"text":352,"correct":22},"9个月",{"key":31,"text":354,"correct":22},"12个月",{"id":356,"libraryId":5,"type":158,"typeLabel":159,"stem":357,"options":358,"answer":24,"analysis":37},937898,"（2012年真题）关于 FIDIC 合同条件中合同担保的说法，正确的有( )。",[359,361,363,365],{"key":20,"text":360,"correct":22},"承包人接受预付款前可以不提供预付款担保",{"key":24,"text":362,"correct":29},"履约保函均为无条件担保形式",{"key":27,"text":364,"correct":22},"履约保函的有效期到工程师颁发工程接收证书为",{"key":31,"text":205,"correct":22},{"id":367,"libraryId":5,"type":158,"typeLabel":159,"stem":368,"options":369,"answer":20,"analysis":37},937899,"（2013年真题）关于 FIDIC 指定分包商的说法，正确的是( )。",[370,372,374,376],{"key":20,"text":371,"correct":29},"指定分包商可由工程师指定",{"key":24,"text":373,"correct":22},"指定分包商应与业主签订合同",{"key":27,"text":375,"correct":22},"指定分包商不能提供工程技术服务",{"key":31,"text":377,"correct":22},"承包商不负责对指定分包商的监管",{"id":379,"libraryId":5,"type":158,"typeLabel":159,"stem":380,"options":381,"answer":24,"analysis":37},937900,"（2010年真题）FIDIC 合同条件规定，争端裁决委员会作出裁决后( )日内任何一方未提出不满意裁决的通知，此裁决即为最终决定。",[382,384,386,388],{"key":20,"text":383,"correct":22},"14",{"key":24,"text":385,"correct":29},"28",{"key":27,"text":387,"correct":22},"56",{"key":31,"text":389,"correct":22},"84",{"id":391,"libraryId":5,"type":158,"typeLabel":159,"stem":392,"options":393,"answer":20,"analysis":37},937901,"（2013年真题）根据 FIDIC《施工合同条件》，承包商未能在规定的期限内修复缺陷部位，业主可雇佣他人完成，费用从( )内扣除",[394,396,398,400],{"key":20,"text":395,"correct":29},"保留金",{"key":24,"text":397,"correct":22},"工程进度款",{"key":27,"text":399,"correct":22},"预付款",{"key":31,"text":401,"correct":22},"履约保证金",{"id":403,"libraryId":5,"type":158,"typeLabel":159,"stem":404,"options":405,"answer":31,"analysis":37},937902,"（2008年真题）根据FIDIC施工合同条件，下列关于工程进度款的表述中，正确的是( )。",[406,408,410,412],{"key":20,"text":407,"correct":22},"工程量清单中的工程量可以作为工程结算的依据",{"key":24,"text":409,"correct":22},"采用单价合同的项目应以图纸工程量作为支付依据",{"key":27,"text":411,"correct":22},"工程款逾期支付，业主应按银行贷款利率加2%支付利息",{"key":31,"text":413,"correct":29},"工程师应在收到承包商支付报表后28天内按核实结果签发支付证书",{"id":415,"libraryId":5,"type":158,"typeLabel":159,"stem":416,"options":417,"answer":24,"analysis":37},937903,"（2011年真题）关于FIDIC施工合同条件中工程竣工验收的说法，正确的是( )。",[418,420,422,424],{"key":20,"text":419,"correct":22},"获得工程接收证书后，工程照管责任仍由承包商负责",{"key":24,"text":421,"correct":29},"可以允许承包商在缺陷责任期内继续完成工程部分扫尾工作",{"key":27,"text":423,"correct":22},"工程师接到承包商申请28天后才能颁发工程接收证书",{"key":31,"text":425,"correct":22},"对于未通过竣工检验的工程，可调整标准重新进行竣工检验",{"id":427,"libraryId":5,"type":158,"typeLabel":159,"stem":428,"options":429,"answer":20,"analysis":37},937904,"（2016年真题）下列属于工程项目业主自行管理模式的特点的是( )",[430,432,434,436],{"key":20,"text":431,"correct":29},"可以随时采取措施以保障业主利益的最大化",{"key":24,"text":433,"correct":22},"可使整个工程提前投产，节约投资，减少投资风险，较早地取得收益",{"key":27,"text":435,"correct":22},"业主可以比较方便的提出设计和施工方面的变更",{"key":31,"text":437,"correct":22},"有利于减少设计变更",{"id":439,"libraryId":5,"type":158,"typeLabel":159,"stem":440,"options":441,"answer":31,"analysis":37},937905,"（2014年真题）从业主的角度看，传统的工程项目发包模式(设计-招标-建造模式)的主要优点是( )。",[442,444,446,448],{"key":20,"text":443,"correct":22},"设计过程中较多考虑了可施工性",{"key":24,"text":445,"correct":22},"项目实施周期较短",{"key":27,"text":447,"correct":22},"设计方和施工方责任明确",{"key":31,"text":449,"correct":29},"施工阶段易于掌控设计变更",{"id":451,"libraryId":5,"type":158,"typeLabel":159,"stem":452,"options":453,"answer":27,"analysis":37},937906,"（2009年真题）在工程设计过程中最有可能对项目的&quot;可施工性&quot;考虑不够，不利于总投资控制的项目管理模式是( )",[454,456,458,460],{"key":20,"text":455,"correct":22},"项目管理承包模式(PM C)",{"key":24,"text":457,"correct":22},"设计－采购－施工模式(EP",{"key":27,"text":459,"correct":29},"设计－招投标－建造模式(DB",{"key":31,"text":461,"correct":22},"建筑工程管理模式(CM)",{"id":463,"libraryId":5,"type":158,"typeLabel":159,"stem":464,"options":465,"answer":27,"analysis":37},937907,"（2014年真题）根据《标准施工招标文件》 (2007年版)，合同进度计划是指经( )批准的施工进度计划。",[466,468,470,472],{"key":20,"text":467,"correct":22},"监督人",{"key":24,"text":469,"correct":22},"承包人",{"key":27,"text":471,"correct":29},"监理人",{"key":31,"text":473,"correct":22},"投资人",{"id":475,"libraryId":5,"type":158,"typeLabel":159,"stem":476,"options":477,"answer":24,"analysis":37},937908,"（2017年真题）根据《标准施工招标文件》 (2007 年版)，下列关于工程开工的说法，错误的是( )。",[478,479,480,481],{"key":20,"text":175,"correct":22},{"key":24,"text":177,"correct":29},{"key":27,"text":179,"correct":22},{"key":31,"text":181,"correct":22},{"id":483,"libraryId":5,"type":158,"typeLabel":159,"stem":484,"options":485,"answer":20,"analysis":37},937909,"（2016年真题）发包人应按照合同约定方式预留保证金，保证金总预留比例不得高于工程价款结算总额的( )。",[486,488,490,492],{"key":20,"text":487,"correct":29},"3%",{"key":24,"text":489,"correct":22},"5%",{"key":27,"text":491,"correct":22},"10%",{"key":31,"text":493,"correct":22},"15%",{"id":495,"libraryId":5,"type":158,"typeLabel":159,"stem":496,"options":497,"answer":27,"analysis":37},937910,"（2013年真题）根据 FIDIC《施工合同条件》，承包商提供的履约担保为不需要由( )确认违约的无条件担保",[498,500,502,504],{"key":20,"text":499,"correct":22},"咨询工程师",{"key":24,"text":501,"correct":22},"项目业主",{"key":27,"text":503,"correct":29},"承包商",{"key":31,"text":505,"correct":22},"出具履约担保的金融机构",{"id":507,"libraryId":5,"type":158,"typeLabel":159,"stem":508,"options":509,"answer":27,"analysis":37},937911,"（2017年真题）根据 FIDIC 施工合同条件，履约担保的保证期限应到( )为止。",[510,512,514,516],{"key":20,"text":511,"correct":22},"工程实质性竣工",{"key":24,"text":513,"correct":22},"颁发工程接收证书",{"key":27,"text":515,"correct":29},"缺陷责任期满",{"key":31,"text":517,"correct":22},"保留金达到扣留限额",{"id":519,"libraryId":5,"type":158,"typeLabel":159,"stem":520,"options":521,"answer":20,"analysis":37},937912,"（2013年真题）根据 FIDIC《施工合同条件》，承包商完成建造和保修任务后，对所有合格工程有权获得的全部工程款称为( )。",[522,523,524,525],{"key":20,"text":235,"correct":29},{"key":24,"text":237,"correct":22},{"key":27,"text":239,"correct":22},{"key":31,"text":241,"correct":22},{"id":527,"libraryId":5,"type":158,"typeLabel":159,"stem":528,"options":529,"answer":27,"analysis":37},937913,"（2016年真题）下列关于裁决委员会的说法错误的是( )。",[530,532,534,536],{"key":20,"text":531,"correct":22},"裁决委员会可约定为一名或三名成员，一般由三名组成",{"key":24,"text":533,"correct":22},"合同每一方应提名一位成员，由对方批准",{"key":27,"text":535,"correct":29},"合同每一方应提名一位成员，无须对方批准",{"key":31,"text":537,"correct":22},"双方应与两名成员共同商定第二位成员，第三人作为主席",{"id":539,"libraryId":5,"type":158,"typeLabel":159,"stem":540,"options":541,"answer":31,"analysis":37},937914,"（2017年真题）关于“代建制”实施方式的说法，错误的是( )。",[542,544,546,548],{"key":20,"text":543,"correct":22},"“代建制”的实施方式可分为全过程代建和两阶段代建",{"key":24,"text":545,"correct":22},"两阶段代建是将建设项目分为项目前期工作阶段代建和实施期工程代建",{"key":27,"text":547,"correct":22},"采购施工承包商属于“代建制”的内容",{"key":31,"text":549,"correct":29},"项目建设实施阶段中，投资人应选择好监理单位",{"id":551,"libraryId":5,"type":158,"typeLabel":159,"stem":552,"options":553,"answer":24,"analysis":37},937915,"（2011年真题）政府投资项目实行的“代建制”属于( )。",[554,556,558,560],{"key":20,"text":555,"correct":22},"工程总承包项目管理模式",{"key":24,"text":557,"correct":29},"业主委托管理模式",{"key":27,"text":559,"correct":22},"公共设施及服务私营化模式",{"key":31,"text":561,"correct":22},"传统的工程项目管理模式",{"id":563,"libraryId":5,"type":158,"typeLabel":159,"stem":564,"options":565,"answer":20,"analysis":37},937916,"（2017年真题）交钥匙模式是指( )。",[566,568,570,572],{"key":20,"text":567,"correct":29},"设计-采购-施工",{"key":24,"text":569,"correct":22},"建造-运营-移交",{"key":27,"text":571,"correct":22},"设计-建造-运营",{"key":31,"text":573,"correct":22},"采购-建造-移交",{"id":575,"libraryId":5,"type":158,"typeLabel":159,"stem":576,"options":577,"answer":31,"analysis":37},937917,"（2013年真题）关于工程项目合同的说法，错误的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"工程项目合同是一个合同群体",{"key":24,"text":581,"correct":22},"订立合同应遵循平等自愿原则",{"key":27,"text":583,"correct":22},"合同双方行为应遵守《招标投标法》",{"key":31,"text":585,"correct":29},"合同标的不限于工程项目涉及的内容",{"id":587,"libraryId":5,"type":158,"typeLabel":159,"stem":588,"options":589,"answer":27,"analysis":37},937918,"（2013年真题）根据FIDIC《施工合同条件》，承包商提供的履约担保为不需要（ ）确认违约的无条件担保。",[590,591,592,593],{"key":20,"text":499,"correct":22},{"key":24,"text":501,"correct":22},{"key":27,"text":503,"correct":29},{"key":31,"text":505,"correct":22},{"id":595,"libraryId":5,"type":158,"typeLabel":159,"stem":596,"options":597,"answer":20,"analysis":37},937919,"（2013年真题）根据FIDIC《施工合同条件》，承包商未能在规定时间内修复缺陷工程部位，业主可雇用他人完成，费用从（ ）内扣除。",[598,599,600,601],{"key":20,"text":395,"correct":29},{"key":24,"text":397,"correct":22},{"key":27,"text":399,"correct":22},{"key":31,"text":401,"correct":22},{"id":603,"libraryId":5,"type":158,"typeLabel":159,"stem":604,"options":605,"answer":27,"analysis":37},937920,"（2017年真题）根据FID1C 施工合同条件，履约担保的保证期限应到（ ）为止。",[606,607,608,609],{"key":20,"text":511,"correct":22},{"key":24,"text":513,"correct":22},{"key":27,"text":515,"correct":29},{"key":31,"text":517,"correct":22},{"id":611,"libraryId":5,"type":158,"typeLabel":159,"stem":612,"options":613,"answer":24,"analysis":37},937921,"（2011年真题）关于FIDIC 施工合同条件中工程竣工验收的说法，正确的是（ ）。",[614,615,616,617],{"key":20,"text":419,"correct":22},{"key":24,"text":421,"correct":29},{"key":27,"text":423,"correct":22},{"key":31,"text":425,"correct":22},[619,622,625,628,631,634],{"id":158,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":158},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":158},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":158},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]