[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":628},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,39,50,1948,[13,34,46,58,70,82,94,112,127,142,157,172,186,198,213,227,241,255,267,279,291,303,315,326,341,356,368,380,392,405,416,425,437,449,461,470,482,494,506,520,533,544,557,569,581,593,605,616],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},939615,1,"单选题","工程项目处于多种因素构成的复杂环境中，下列不属于必须考虑的影响因素是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","上级组织的影响",false,{"key":24,"text":25,"correct":26},"B","项目选址地质情况",true,{"key":28,"text":29,"correct":22},"C","标准.规范和规则的约束",{"key":31,"text":32,"correct":22},"D","社会.经济.文化.政治.法律等方面的影响","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},939616,"工程项目准备阶段的可交付成果是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"可行性研究报告",{"key":24,"text":41,"correct":22},"项目决策",{"key":28,"text":43,"correct":26},"图纸交付",{"key":31,"text":45,"correct":22},"项目完工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},939617,"工程项目征地及建设条件的准备是（ ）的具体工作。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程项目前期阶段",{"key":24,"text":53,"correct":26},"工程项目准备阶段",{"key":28,"text":55,"correct":22},"工程项目实施阶段",{"key":31,"text":57,"correct":22},"工程项目投产运营阶段",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},939618,"关于项目管理与运营管理，下列说法不正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"运营是通过开展持续的活动生产规定产品或提供服务的一种组织职能",{"key":24,"text":65,"correct":22},"项目是指为创造独特的产品、服务或成果而进行的临时性工作",{"key":28,"text":67,"correct":26},"项目管理与运营管理本质并无差别",{"key":31,"text":69,"correct":22},"工程项目运营一般不包括在项目管理的范畴",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},939619,"投资少、利益大、时间短、质量合格，这是（ ）对工程项目的要求和期望。",[74,76,78,80],{"key":20,"text":75,"correct":26},"项目业主",{"key":24,"text":77,"correct":22},"咨询机构",{"key":28,"text":79,"correct":22},"金融机构",{"key":31,"text":81,"correct":22},"政府部门",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},939620,"系统的定义和描述项目管理知识体系的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"PMBOK",{"key":24,"text":89,"correct":22},"PRINCE2",{"key":28,"text":91,"correct":22},"ICB",{"key":31,"text":93,"correct":22},"FIDIC",{"id":95,"libraryId":5,"type":96,"typeLabel":97,"stem":98,"options":99,"answer":111,"analysis":33},939621,2,"多选题","国际上对项目分类的依据包括（ ）",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"项目产出物性质",{"key":24,"text":103,"correct":26},"服务对象",{"key":28,"text":105,"correct":26},"效益特点",{"key":31,"text":107,"correct":22},"投资规模",{"key":109,"text":110,"correct":26},"E","资金来源","ABCE",{"id":113,"libraryId":5,"type":96,"typeLabel":97,"stem":114,"options":115,"answer":126,"analysis":33},939622,"下列项目属于基础设施类项目的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"社会公共设施建设项目",{"key":24,"text":119,"correct":26},"交通项目",{"key":28,"text":121,"correct":22},"环境保护项目",{"key":31,"text":123,"correct":26},"供排水设施",{"key":109,"text":125,"correct":22},"教育培训项目","BD",{"id":128,"libraryId":5,"type":96,"typeLabel":97,"stem":129,"options":130,"answer":141,"analysis":33},939623,"工程项目前期阶段的主要工作包括（ ）",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"投资机会研究",{"key":24,"text":134,"correct":26},"可行性研究",{"key":28,"text":136,"correct":26},"项目评估及决策",{"key":31,"text":138,"correct":22},"初步设计",{"key":109,"text":140,"correct":22},"建设条件准备","ABC",{"id":143,"libraryId":5,"type":96,"typeLabel":97,"stem":144,"options":145,"answer":156,"analysis":33},939624,"关于项目实施阶段，下列说法正确的是（ ）",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"该阶段形成工程实物形态，实现投资决策目标",{"key":24,"text":149,"correct":22},"该阶段提出的指标性目标，对项目效益影响大",{"key":28,"text":151,"correct":26},"竣工验收属于该阶段的工作",{"key":31,"text":153,"correct":26},"工程项目试生产正常并经业主验收后，该阶段即告结束",{"key":109,"text":155,"correct":26},"该阶段工程项目管理的难度最大","ACDE",{"id":158,"libraryId":5,"type":96,"typeLabel":97,"stem":159,"options":160,"answer":171,"analysis":33},939625,"关于 DBO 模式的说法，正确的是（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":26},"责任主体相对单一",{"key":24,"text":164,"correct":26},"可以优化项目的全寿命周期成本",{"key":28,"text":166,"correct":22},"施工周期长",{"key":31,"text":168,"correct":26},"可以保证项目质量长期的可靠性",{"key":109,"text":170,"correct":22},"招投标过程短","ABD",{"id":173,"libraryId":5,"type":96,"typeLabel":97,"stem":174,"options":175,"answer":185,"analysis":33},939626,"业主方选择工程项目管理模式时，应考虑的主要因素包括（ ）。",[176,178,179,181,183],{"key":20,"text":177,"correct":26},"项目的复杂性",{"key":24,"text":110,"correct":26},{"key":28,"text":180,"correct":22},"承包方要求",{"key":31,"text":182,"correct":26},"项目各方管理风险的水平",{"key":109,"text":184,"correct":26},"项目实施所在地建设市场的适应性","ABDE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},939627,"下列项目中，符合工程项目定义，能称为工程项目的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"发电机设计项目",{"key":24,"text":193,"correct":26},"扩建学校食堂",{"key":28,"text":195,"correct":22},"软件开发项目",{"key":31,"text":197,"correct":22},"国家自然科学基金项目",{"id":199,"libraryId":5,"type":96,"typeLabel":97,"stem":200,"options":201,"answer":212,"analysis":33},939628,"工程项目系统主要包括( )。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"目标系统",{"key":24,"text":205,"correct":26},"行为系统",{"key":28,"text":207,"correct":26},"组织系统",{"key":31,"text":209,"correct":26},"管理系统",{"key":109,"text":211,"correct":22},"评价系统","ABCD",{"id":214,"libraryId":5,"type":96,"typeLabel":97,"stem":215,"options":216,"answer":212,"analysis":33},939629,"建立工程项目目标系统时应作的主要工作有( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"工程项目构思",{"key":24,"text":220,"correct":26},"识别需求",{"key":28,"text":222,"correct":26},"提出项目目标",{"key":31,"text":224,"correct":26},"建立目标系统",{"key":109,"text":226,"correct":22},"提出项目申请",{"id":228,"libraryId":5,"type":96,"typeLabel":97,"stem":229,"options":230,"answer":212,"analysis":33},939630,"下列工作中，属于项目管理过程的有( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"项目启动",{"key":24,"text":234,"correct":26},"项目计划",{"key":28,"text":236,"correct":26},"项目执行",{"key":31,"text":238,"correct":26},"项目收尾",{"key":109,"text":240,"correct":22},"项目验收",{"id":242,"libraryId":5,"type":96,"typeLabel":97,"stem":243,"options":244,"answer":141,"analysis":33},939631,"工程项目具有( )等特点，决定了其过程控制的动态特征。",[245,247,249,251,253],{"key":20,"text":246,"correct":26},"一次性",{"key":24,"text":248,"correct":26},"固定性",{"key":28,"text":250,"correct":26},"诸多因素带有不确定性",{"key":31,"text":252,"correct":22},"整体性",{"key":109,"text":254,"correct":22},"独特性",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},939632,"下列属于工程项目业主自行管理模式的特点的是( )。",[259,261,263,265],{"key":20,"text":260,"correct":26},"可以充分保障业主方对工程项目的控制",{"key":24,"text":262,"correct":22},"可以缩短工程项目从规划、设计到竣工的周期",{"key":28,"text":264,"correct":22},"可以避免本单位项目管理人员经验不足的缺陷",{"key":31,"text":266,"correct":22},"有利于减少设计变更",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},939633,"关于“代建制”实施方式的说法，错误的是( )。",[271,273,275,277],{"key":20,"text":272,"correct":22},"“代建制”可以采用“委托代理合同”的运作模式",{"key":24,"text":274,"correct":22},"“代建制”的实施方式分为全过程代建和两阶段代建",{"key":28,"text":276,"correct":22},"“代建制”是一种特殊的项目管理方式",{"key":31,"text":278,"correct":26},"对经营性政府投资项目加快推行“代建制”",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},939634,"承包商对工程项目的要求和期望是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"投资少，质量合格",{"key":24,"text":286,"correct":26},"利润优厚，及时付款",{"key":28,"text":288,"correct":22},"质量合格，运营正常",{"key":31,"text":290,"correct":22},"贷款安全，保证进度",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},939635,"工程项目主要利害关系者中，内部各部门的要求和期望是（ ）",[295,297,299,301],{"key":20,"text":296,"correct":22},"松弛的工作进度表、合理的报酬",{"key":24,"text":298,"correct":22},"迅速批准开工",{"key":28,"text":300,"correct":26},"松弛的工作进度表，足够的信息、人力和物资资源",{"key":31,"text":302,"correct":22},"按质量要求，按时或提前形成综合生产力",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},939636,"社会公众对垃圾处理建设项目的要求和期望不包括（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"无污染",{"key":24,"text":310,"correct":26},"收益高",{"key":28,"text":312,"correct":22},"有社会效益",{"key":31,"text":314,"correct":22},"服务优良",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},939637,"下列任务中，属于工程项目外部管理的是（ ）。",[319,320,322,324],{"key":20,"text":134,"correct":22},{"key":24,"text":321,"correct":22},"设计招标",{"key":28,"text":323,"correct":22},"施工图设计",{"key":31,"text":325,"correct":26},"项目备案",{"id":327,"libraryId":5,"type":96,"typeLabel":97,"stem":328,"options":329,"answer":340,"analysis":33},939638,"工程项目管理处于多种因素构成的复杂环境中，必须考虑（ ）等多方面的影响。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"上级组织",{"key":24,"text":333,"correct":22},"竞争对手",{"key":28,"text":335,"correct":26},"社会经济、文化、政治、法律",{"key":31,"text":337,"correct":22},"项目管理论的发展",{"key":109,"text":339,"correct":26},"标准规范和规程的约束","ACE",{"id":342,"libraryId":5,"type":96,"typeLabel":97,"stem":343,"options":344,"answer":355,"analysis":33},939639,"下列关于工程项目管理的说法，错误的有（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"工程项目管理是种多主体的管理活动",{"key":24,"text":348,"correct":22},"政府主要通过法律法规和行政许可等手段对工程项目实施管理",{"key":28,"text":350,"correct":26},"政府的项目管理是工程项目管理的核心",{"key":31,"text":352,"correct":26},"设计方项目管理的客体是项目从提出设想到竣工、交付使用的全部工作",{"key":109,"text":354,"correct":22},"组织文化、结构和交流、人力资源状况属于工程项目管理的内部环境","CD",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},939640,"对工程项目进行全面管理的核心的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"咨询工程师",{"key":24,"text":363,"correct":26},"业主",{"key":28,"text":365,"correct":22},"政府",{"key":31,"text":367,"correct":22},"承包商",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},939641,"关于PDCA循环的说法，错误的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"PDCA是一个合乎逻辑的工作程序",{"key":24,"text":375,"correct":26},"PDCA的基本原理是目标系统管理",{"key":28,"text":377,"correct":22},"PDCA循环需要运行多次才能完成",{"key":31,"text":379,"correct":22},"PDCA呈阶梯式上升的趋势",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},939642,"国际标准化组织与国际咨询工程师联合会均推荐采用的项目过程管理方法是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"计划→实施→检查→处理",{"key":24,"text":387,"correct":22},"计划→指挥→监督→检查",{"key":28,"text":389,"correct":22},"指挥→监督→运转→协调",{"key":31,"text":391,"correct":22},"计划→沟通→指挥→协调",{"id":393,"libraryId":5,"type":96,"typeLabel":97,"stem":394,"options":395,"answer":111,"analysis":33},939643,"下列工作中，属于创造项目产品过程的有（ ）。",[396,398,400,402,404],{"key":20,"text":397,"correct":26},"项目策划",{"key":24,"text":399,"correct":26},"项目设计",{"key":28,"text":401,"correct":26},"项目施工",{"key":31,"text":403,"correct":22},"项目控制",{"key":109,"text":240,"correct":26},{"id":406,"libraryId":5,"type":96,"typeLabel":97,"stem":407,"options":408,"answer":141,"analysis":33},939644,"由于工程项目具有（ ）等特点，因此其工程控制具有动态特征。",[409,410,411,412,414],{"key":20,"text":246,"correct":26},{"key":24,"text":248,"correct":26},{"key":28,"text":250,"correct":26},{"key":31,"text":413,"correct":22},"多样性",{"key":109,"text":415,"correct":22},"特殊性",{"id":417,"libraryId":5,"type":96,"typeLabel":97,"stem":418,"options":419,"answer":212,"analysis":33},939645,"建立工程项目目标系统时应作的主要工作有（ ）。",[420,421,422,423,424],{"key":20,"text":218,"correct":26},{"key":24,"text":220,"correct":26},{"key":28,"text":222,"correct":26},{"key":31,"text":224,"correct":26},{"key":109,"text":226,"correct":22},{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},939646,"工程项目目标系统的建立工作包括：①提出项目目标；②项目构思；③识别需求；④建立目标系统，正确的顺序是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"①-②-③-④",{"key":24,"text":432,"correct":22},"③-②-④-①",{"key":28,"text":434,"correct":22},"③-①-②-④",{"key":31,"text":436,"correct":26},"②-③-①-④",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},939647,"工程项目组织系统由（ ）的个人、单位和部门所构成。",[441,443,445,447],{"key":20,"text":442,"correct":22},"从事项目决策管理工作",{"key":24,"text":444,"correct":22},"从事政府相关管理工作",{"key":28,"text":446,"correct":26},"负责完成项目工作分解结构中各项工作",{"key":31,"text":448,"correct":22},"承担项目资金筹措任务",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},939648,"对存在于项目中的各种技术界面和组织界面进行管理并做好记录的工作，属于过程管理中的（ ）过程。",[453,455,457,459],{"key":20,"text":454,"correct":22},"检查",{"key":24,"text":456,"correct":22},"处理",{"key":28,"text":458,"correct":26},"实施",{"key":31,"text":460,"correct":22},"计划",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},939649,"在工程项目目标系统的建立过程中，进行工程项目环境分析是（ ）阶段的重要内容。",[465,466,467,469],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":22},{"key":28,"text":468,"correct":22},"工作结构分解",{"key":31,"text":222,"correct":26},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},939650,"工程项目过程控制中，一般将项目过程分为（ ）两大类。",[474,476,478,480],{"key":20,"text":475,"correct":22},"项目决策过程与项目实施过程",{"key":24,"text":477,"correct":22},"项目设计过程与项目管理过程",{"key":28,"text":479,"correct":26},"产品创造过程与项目管理过程",{"key":31,"text":481,"correct":22},"项目计划过程与项目实施过程",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},939651,"工程项目过程控制中，典型的项目管理过程是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"检查→计划→启动→实施→处理",{"key":24,"text":489,"correct":22},"计划→启动→实施→检查→处理",{"key":28,"text":491,"correct":26},"启动→计划→实施→检查→处理",{"key":31,"text":493,"correct":22},"启动→计划→检查→实施→处理",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},939652,"关于项目管理的说法，正确的是（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"项目管理过程因项目的不同而完全不同",{"key":24,"text":501,"correct":22},"项目管理过程是创造项目产品的过程",{"key":28,"text":503,"correct":22},"项目管理过程以创造项目产品的过程为基础",{"key":31,"text":505,"correct":26},"创造项目产品的过程是项目管理的对象",{"id":507,"libraryId":5,"type":96,"typeLabel":97,"stem":508,"options":509,"answer":340,"analysis":33},939653,"创造项目产品的过程是实现项目产品的（ ）的过程。",[510,512,514,516,518],{"key":20,"text":511,"correct":26},"功能",{"key":24,"text":513,"correct":22},"效益",{"key":28,"text":515,"correct":26},"质量",{"key":31,"text":517,"correct":22},"效率",{"key":109,"text":519,"correct":26},"特性",{"id":521,"libraryId":5,"type":96,"typeLabel":97,"stem":522,"options":523,"answer":532,"analysis":33},939654,"项目管理知识体系（PRINCE2）涉及了8类管理要素，包括（ ）等。",[524,525,526,528,530],{"key":20,"text":232,"correct":22},{"key":24,"text":460,"correct":26},{"key":28,"text":527,"correct":26},"风险管理",{"key":31,"text":529,"correct":26},"组织",{"key":109,"text":531,"correct":22},"项目交付","BCD",{"id":534,"libraryId":5,"type":96,"typeLabel":97,"stem":535,"options":536,"answer":543,"analysis":33},939655,"下列项目管理任务中，属于《项目管理知识体系指南（PMBOK）》所述项目管理过程的有（ ）。",[537,538,539,540,541],{"key":20,"text":232,"correct":26},{"key":24,"text":399,"correct":22},{"key":28,"text":234,"correct":26},{"key":31,"text":403,"correct":26},{"key":109,"text":542,"correct":22},"项目投产运营","ACD",{"id":545,"libraryId":5,"type":96,"typeLabel":97,"stem":546,"options":547,"answer":141,"analysis":33},939656,"下列关于 PMC 模式的优缺点说法，正确的有（ ）。",[548,550,551,553,555],{"key":20,"text":549,"correct":26},"PMC 承包商统一协调和管理项目的设计与施工",{"key":24,"text":266,"correct":26},{"key":28,"text":552,"correct":26},"业主与 PMC 承包商所签合同内容既包括管理服务的内容，也包括施工承包的内容",{"key":31,"text":554,"correct":22},"业主容易控制施工",{"key":109,"text":556,"correct":22},"业主对工程费用风险较小",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},939657,"在工程设计过程中最有可能对项目的&ldquo;可施工性&rdquo;考虑不够，不利于总投资控制的项目管理模式是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"项目管理承包模式（PM C）",{"key":24,"text":564,"correct":22},"设计－采购－施工模式（EP",{"key":28,"text":566,"correct":26},"设计－招标－建造模式（DB",{"key":31,"text":568,"correct":22},"建筑工程管理模式（CM）",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},939658,"交钥匙模式是指（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":26},"设计－采购－施工",{"key":24,"text":576,"correct":22},"建造－运营－移交",{"key":28,"text":578,"correct":22},"设计－建造－运营",{"key":31,"text":580,"correct":22},"采购－建造－移交",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},939659,"从业主的角度看，传统的工程项目发包模式（设计－招标－建造模式）的主要优点是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"设计过程中较多考虑了可施工性",{"key":24,"text":588,"correct":22},"项目实施周期较短",{"key":28,"text":590,"correct":22},"设计方和施工方责任明确",{"key":31,"text":592,"correct":26},"施工阶段易于掌控设计变更",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},939660,"政府投资项目实行的“代建制”属于（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"工程总承包项目管理模式",{"key":24,"text":600,"correct":26},"业主委托管理模式",{"key":28,"text":602,"correct":22},"公共设施及服务私营化模式",{"key":31,"text":604,"correct":22},"传统的工程项目管理模式",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},939661,"下列属于工程项目业主自行管理模式的特点的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":26},"可以随时采取措施以保障业主利益的最大化",{"key":24,"text":612,"correct":22},"可使整个工程提前投产，节约投资，减少投资风险，较早地取得收益",{"key":28,"text":614,"correct":22},"业主可以比较方便的提出设计和施工方面的变更",{"key":31,"text":266,"correct":22},{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":31,"analysis":33},939662,"关于“代建制”实施方式的说法，错误的是（ ）。",[620,622,624,626],{"key":20,"text":621,"correct":22},"“代建制”的实施方式可分为全过程代建和两阶段代建",{"key":24,"text":623,"correct":22},"两阶段代建是将建设项目分为项目前期工作阶段代建和实施期工程代建",{"key":28,"text":625,"correct":22},"采购施工承包商属于“代建制”的内容",{"key":31,"text":627,"correct":26},"项目建设实施阶段中，投资人应选择好监理单位",[629,632,635,638,641,644],{"id":15,"name":630,"category":7,"favorite":631},"领导干部任职前廉政法规知识测试题",92,{"id":633,"name":634,"category":7,"favorite":15},595,"建筑结构与设备",{"id":636,"name":637,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":639,"name":640,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":642,"name":643,"category":7,"favorite":8},534,"BIM工程师",{"id":645,"name":643,"category":7,"favorite":8},535]