[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":664},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,38,50,1948,[13,34,46,58,70,82,94,106,116,128,140,152,164,176,194,209,224,239,254,269,283,298,313,328,338,352,364,376,388,400,412,424,434,448,463,476,489,502,516,530,544,556,565,579,593,605,617,628,640,652],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},939565,1,"单选题","由于工程项目的目标多、涉及面广、群体作业，因而参与项目工作的组织和人员也多，这体现了（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程项目交易及生产过程的复杂性",false,{"key":24,"text":25,"correct":26},"B","工程项目组织的复杂性",true,{"key":28,"text":29,"correct":22},"C","工程项目环境的复杂性",{"key":31,"text":32,"correct":22},"D","工程项目风险的复杂性","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},939566,"PMBOK中的项目管理的管理过程不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"启动",{"key":24,"text":41,"correct":22},"计划",{"key":28,"text":43,"correct":26},"变更",{"key":31,"text":45,"correct":22},"执行",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},939567,"（ ）描述了以一种逻辑性的、有组织的方法，按照明确的步骤对项目进行管理的方法。",[50,52,54,56],{"key":20,"text":51,"correct":22},"PMBOK",{"key":24,"text":53,"correct":26},"PRINCE2",{"key":28,"text":55,"correct":22},"ICB",{"key":31,"text":57,"correct":22},"FIDIC",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},939568,"工程项目管理的基本原理主要是（ ）和过程管理。",[62,64,66,68],{"key":20,"text":63,"correct":26},"系统管理",{"key":24,"text":65,"correct":22},"目标管理",{"key":28,"text":67,"correct":22},"整体管理",{"key":31,"text":69,"correct":22},"阶段管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},939569,"关于工程项目管理的基本原理说法，不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程项目管理通过一个临时性组织来实现",{"key":24,"text":77,"correct":22},"以实现项目全过程的动态管理",{"key":28,"text":79,"correct":26},"系统思想科学基础是控制论",{"key":31,"text":81,"correct":22},"强调项目目标综合协调和优化",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},939570,"由于项目管理采用目标管理方法，因此在（ ）过程中就应建立目标系统，并将其贯穿于项目全过程。",[86,88,90,92],{"key":20,"text":87,"correct":26},"前期策划",{"key":24,"text":89,"correct":22},"前期准备",{"key":28,"text":91,"correct":22},"前期可行性研究",{"key":31,"text":93,"correct":22},"项目实施",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},939571,"工程项目目标系统的建立过程中，提出项目目标后应进行的工作是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"识别需求",{"key":24,"text":101,"correct":22},"项目构思",{"key":28,"text":103,"correct":26},"建立目标系统",{"key":31,"text":105,"correct":22},"执行项目目标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},939572,"在（ ）的基础上，需要对工程项目投资方的具体需求进行识别和评价，形成理性的目标概念，使投资方的需求更加合理化。",[110,112,113,115],{"key":20,"text":111,"correct":26},"工程项目构思",{"key":24,"text":99,"correct":22},{"key":28,"text":114,"correct":22},"提出项目目标",{"key":31,"text":103,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},939573,"工程项目目标系统的建立依据不包括（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"业主的需求说明",{"key":24,"text":123,"correct":22},"有关法律法规",{"key":28,"text":125,"correct":22},"类似项目的历史数据",{"key":31,"text":127,"correct":26},"承包商工作经验",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},939574,"有关 PDCA 循环说法，不正确的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"PDCA 循环方法是过程管理的基本方法",{"key":24,"text":135,"correct":22},"PDCA 适应于任何一项工作",{"key":28,"text":137,"correct":26},"PDCA 在同一水平上循环",{"key":31,"text":139,"correct":22},"PDCA 呈阶梯式上升的趋势",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},939575,"有关业主自行管理模式的优缺点说法，不正确的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"可以充分保障业主方对工程项目的控制",{"key":24,"text":147,"correct":22},"可以随时采取措施以保障业主利益的最大化",{"key":28,"text":149,"correct":22},"管理资源利用率低",{"key":31,"text":151,"correct":26},"有利于管理经验的积累",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},939576,"工程可以提前投产，能节约投资，减少投资风险，较早地取得收益的管理模式是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"PM",{"key":24,"text":159,"correct":26},"CM",{"key":28,"text":161,"correct":22},"DM",{"key":31,"text":163,"correct":22},"BOT",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":28,"analysis":33},939577,"工程总承包企业按照合同约定，承担工程项目的设计、采购、施工、试运行服务等工作，并对承包工程的质量、安全、工期、造价全面负责的模式是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"DBB",{"key":24,"text":171,"correct":22},"DB",{"key":28,"text":173,"correct":26},"EPC",{"key":31,"text":175,"correct":22},"DBO",{"id":177,"libraryId":5,"type":178,"typeLabel":179,"stem":180,"options":181,"answer":193,"analysis":33},939578,2,"多选题","关于工程项目的概念，下列说法正确的是（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":22},"工程项目即投资项目",{"key":24,"text":185,"correct":26},"投资项目即固定资产投资项目的简称",{"key":28,"text":187,"correct":26},"投资项目包括建造工程",{"key":31,"text":189,"correct":26},"投资项目包括设备购置",{"key":191,"text":192,"correct":22},"E","建设项目不一定形成工程实体","BCD",{"id":195,"libraryId":5,"type":178,"typeLabel":179,"stem":196,"options":197,"answer":208,"analysis":33},939579,"工程项目和非工程项目共有的特征包括（ ）",[198,200,202,204,206],{"key":20,"text":199,"correct":26},"独特性",{"key":24,"text":201,"correct":26},"一次性",{"key":28,"text":203,"correct":22},"固定性",{"key":31,"text":205,"correct":22},"整体性",{"key":191,"text":207,"correct":22},"不可逆转性","AB",{"id":210,"libraryId":5,"type":178,"typeLabel":179,"stem":211,"options":212,"answer":223,"analysis":33},939580,"工程项目管理的内部环境包括（ ）。",[213,215,217,219,221],{"key":20,"text":214,"correct":26},"组织文化",{"key":24,"text":216,"correct":26},"人力资源状况",{"key":28,"text":218,"correct":26},"人事管理制度",{"key":31,"text":220,"correct":22},"技术标准、规范",{"key":191,"text":222,"correct":22},"社会、经济、文化、政治","ABC",{"id":225,"libraryId":5,"type":178,"typeLabel":179,"stem":226,"options":227,"answer":238,"analysis":33},939581,"咨询部门的要求和期望包括（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"优厚的利润",{"key":24,"text":231,"correct":26},"松弛的工作进度表",{"key":28,"text":233,"correct":22},"及时提供施工图纸",{"key":31,"text":235,"correct":22},"最小限度的变动",{"key":191,"text":237,"correct":26},"迅速提供信息","BE",{"id":240,"libraryId":5,"type":178,"typeLabel":179,"stem":241,"options":242,"answer":253,"analysis":33},939582,"下列方法中，属于系统工程的有（ ）",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"PDCA 循环",{"key":24,"text":246,"correct":26},"关键路径法",{"key":28,"text":248,"correct":22},"赢得值法",{"key":31,"text":250,"correct":26},"图形网络技术",{"key":191,"text":252,"correct":22},"SWOT 分析","BD",{"id":255,"libraryId":5,"type":178,"typeLabel":179,"stem":256,"options":257,"answer":268,"analysis":33},939583,"工程项目构思常常是下列的一个或多个因素导致的结果（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":26},"市场需求",{"key":24,"text":261,"correct":22},"环境要求",{"key":28,"text":263,"correct":26},"经营需求",{"key":31,"text":265,"correct":26},"技术进步",{"key":191,"text":267,"correct":26},"法律要求","ACDE",{"id":270,"libraryId":5,"type":178,"typeLabel":179,"stem":271,"options":272,"answer":253,"analysis":33},939584,"关于过程和阶段说法正确的是（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"过程即阶段",{"key":24,"text":276,"correct":26},"过程针对管理而言",{"key":28,"text":278,"correct":22},"阶段是面向管理而言",{"key":31,"text":280,"correct":26},"阶段是面向产品而言",{"key":191,"text":282,"correct":22},"将输入转化为输出的相互关联或相互作用的活动即为管理",{"id":284,"libraryId":5,"type":178,"typeLabel":179,"stem":285,"options":286,"answer":297,"analysis":33},939585,"项目管理过程保证项目的（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"特性",{"key":24,"text":290,"correct":22},"功能",{"key":28,"text":292,"correct":22},"质量",{"key":31,"text":294,"correct":26},"效率",{"key":191,"text":296,"correct":26},"效益","DE",{"id":299,"libraryId":5,"type":178,"typeLabel":179,"stem":300,"options":301,"answer":312,"analysis":33},939586,"过程管理采用 PDCA 循环的动态管理模式，通过循环管理达到以下目的（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":26},"选择最佳路径",{"key":24,"text":305,"correct":26},"确定过程有效运行条件、控制关键点和方法",{"key":28,"text":307,"correct":26},"界定过程间的接口",{"key":31,"text":309,"correct":22},"改变各过程活动",{"key":191,"text":311,"correct":26},"确保持续改进","ABCE",{"id":314,"libraryId":5,"type":178,"typeLabel":179,"stem":315,"options":316,"answer":327,"analysis":33},939587,"关于工程项目管理模式说法，正确的是（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"管理模式的选择是项目准备阶段的重要工作之一",{"key":24,"text":320,"correct":22},"工程项目投资建设的基本组织模式决定了管理模式",{"key":28,"text":322,"correct":26},"项目管理模式规定了合同关系",{"key":31,"text":324,"correct":26},"项目管理模式规定了项目完成后的运营方式",{"key":191,"text":326,"correct":26},"项目管理模式确定了项目参与方的风险分担","CDE",{"id":329,"libraryId":5,"type":178,"typeLabel":179,"stem":330,"options":331,"answer":223,"analysis":33},939588,"下列属于工程项目业主管理模式的是（ ）。",[332,334,335,336,337],{"key":20,"text":333,"correct":26},"PMC",{"key":24,"text":159,"correct":26},{"key":28,"text":161,"correct":26},{"key":31,"text":173,"correct":22},{"key":191,"text":169,"correct":22},{"id":339,"libraryId":5,"type":178,"typeLabel":179,"stem":340,"options":341,"answer":223,"analysis":33},939589,"从业主方的视角而言，传统项目管理模式的优点包括（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":26},"业主可自由选择设计人员",{"key":24,"text":345,"correct":26},"管理方法成熟",{"key":28,"text":347,"correct":26},"有利于合同管理",{"key":31,"text":349,"correct":22},"项目设计—招投标—建造的周期较长",{"key":191,"text":351,"correct":22},"前期投入低",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},939590,"EPC\u002FT 模式的含义是指（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"设计—招标—建造模式",{"key":24,"text":359,"correct":22},"设计—施工—运营模式",{"key":28,"text":361,"correct":22},"设计—建造模式",{"key":31,"text":363,"correct":26},"设计—采购—施工\u002F交钥匙模式",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},939591,"下列工程项目中，属于按照项目经济特征的分类的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"企业投资项目",{"key":24,"text":371,"correct":26},"公益项目",{"key":28,"text":373,"correct":22},"社会事业项目",{"key":31,"text":375,"correct":22},"扩建项目",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},939592,"下列选项中，不属于工程项目的是（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"建造一定生产能力的流水线",{"key":24,"text":383,"correct":22},"建设一定规模的医院.文化娱乐设施",{"key":28,"text":385,"correct":26},"化学工程技术研发项目",{"key":31,"text":387,"correct":22},"建设一定规模的住宅小区",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},939593,"下列对于工程项目管理模式的选择，说法错误的是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":26},"一个项目只能选择一种项目管理模式",{"key":24,"text":395,"correct":22},"工程咨询方应当协助业主做好项目管理",{"key":28,"text":397,"correct":22},"一般情况下，项目管理模式由业主方选定",{"key":31,"text":399,"correct":22},"业主可以将项目划分为几个部分，采用不同的管理模式",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},939594,"下列关于“代建制”实施方式的说法错误的是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"“代建制”的实施方式可分为全过程代建和两阶段代建",{"key":24,"text":407,"correct":22},"政府招标产生的代建制项目，代建管理费计入项目建设成本",{"key":28,"text":409,"correct":26},"项目建设实施阶段中，代建人应授权投资人应选择好监理单位",{"key":31,"text":411,"correct":22},"两阶段代建是将建设项目分为项目前期工作阶段代建和项目建设实施阶段代建",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},939595,"项目阶段划分的数量和必要性及每个阶段所需的控制程度取决于若干因素，下列不属于该因素的是（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"项目的功能",{"key":24,"text":419,"correct":22},"项目的规模",{"key":28,"text":421,"correct":22},"项目的复杂程度",{"key":31,"text":423,"correct":22},"项目的潜在影响",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},939596,"PMBOK 使用了“知识领域”的概念，每个知识领域包含若干管理过程，下列不属于该“管理过程”的是（ ）。",[428,429,430,432],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":431,"correct":26},"检查",{"key":31,"text":433,"correct":22},"控制",{"id":435,"libraryId":5,"type":178,"typeLabel":179,"stem":436,"options":437,"answer":447,"analysis":33},939597,"从业主方的视角而言，传统的发包模式的优点有（ ）。",[438,439,441,443,445],{"key":20,"text":345,"correct":26},{"key":24,"text":440,"correct":22},"易于控制工程总投资",{"key":28,"text":442,"correct":22},"易于控制建设工期",{"key":31,"text":444,"correct":26},"可采用各方均熟悉的标准合同文本",{"key":191,"text":446,"correct":26},"业主可自由选择设计人员，可控制设计要求","ADE",{"id":449,"libraryId":5,"type":178,"typeLabel":179,"stem":450,"options":451,"answer":462,"analysis":33},939598,"下列项目属于社会发展和人力资源开发类项目的有（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":26},"社会公共设施项目",{"key":24,"text":455,"correct":22},"交通项目",{"key":28,"text":457,"correct":26},"环境保护项目",{"key":31,"text":459,"correct":22},"供排水设施",{"key":191,"text":461,"correct":26},"教育培训项目","ACE",{"id":464,"libraryId":5,"type":178,"typeLabel":179,"stem":465,"options":466,"answer":447,"analysis":33},939599,"有关项目与工程项目的概念说法，正确的有（ ）。",[467,469,471,473,474],{"key":20,"text":468,"correct":26},"投资项目包括兴工动土的建造工程",{"key":24,"text":470,"correct":22},"工程项目可依次划分为单项工程.单位工程.分部工程.分项工程",{"key":28,"text":472,"correct":22},"投资项目即是工程项目",{"key":31,"text":189,"correct":26},{"key":191,"text":475,"correct":26},"工程项目包含建筑安装工程和设备购置",{"id":477,"libraryId":5,"type":178,"typeLabel":179,"stem":478,"options":479,"answer":488,"analysis":33},939600,"工程项目的复杂性主要表现为（ ）。",[480,482,483,484,486],{"key":20,"text":481,"correct":26},"工程项目交易的复杂性",{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":485,"correct":26},"工程项目生产过程的复杂性",{"key":191,"text":487,"correct":22},"工程项目投资的复杂性","ABCD",{"id":490,"libraryId":5,"type":178,"typeLabel":179,"stem":491,"options":492,"answer":223,"analysis":33},939601,"WBS 是通过控制划分工程项目单元的（ ）目标来达到控制整个工程项目的目的。",[493,494,496,498,500],{"key":20,"text":292,"correct":26},{"key":24,"text":495,"correct":26},"费用",{"key":28,"text":497,"correct":26},"进度",{"key":31,"text":499,"correct":22},"合同",{"key":191,"text":501,"correct":22},"安全",{"id":503,"libraryId":5,"type":178,"typeLabel":179,"stem":504,"options":505,"answer":515,"analysis":33},939602,"工程项目管理团队内部各部门的要求和期望包括（ ）。",[506,508,509,511,513],{"key":20,"text":507,"correct":26},"优良的工作环境",{"key":24,"text":231,"correct":26},{"key":28,"text":510,"correct":22},"投资较高",{"key":31,"text":512,"correct":22},"无社会风险",{"key":191,"text":514,"correct":26},"有足够的人力资源","ABE",{"id":517,"libraryId":5,"type":178,"typeLabel":179,"stem":518,"options":519,"answer":488,"analysis":33},939603,"工程项目建设周期可划分为（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":26},"前期阶段",{"key":24,"text":523,"correct":26},"准备阶段",{"key":28,"text":525,"correct":26},"实施阶段",{"key":31,"text":527,"correct":26},"投产运营阶段",{"key":191,"text":529,"correct":22},"保修阶段",{"id":531,"libraryId":5,"type":178,"typeLabel":179,"stem":532,"options":533,"answer":223,"analysis":33},939604,"ICB4.0 中，将项目管理的能力要素分为以下维度（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"人",{"key":24,"text":537,"correct":26},"实践",{"key":28,"text":539,"correct":26},"洞察力",{"key":31,"text":541,"correct":22},"环境",{"key":191,"text":543,"correct":22},"行为",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},939605,"在我国投资建设活动中，对项目有不同的称谓。投资项目、建设项目和工程项目的共同特点是，这种投资必定形成( )。",[548,550,552,554],{"key":20,"text":549,"correct":22},"无形资产",{"key":24,"text":551,"correct":26},"固定资产",{"key":28,"text":553,"correct":22},"其他资产",{"key":31,"text":555,"correct":22},"流动资产",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},939606,"工程项目和非工程项目共有的特征是( )。",[560,561,562,563],{"key":20,"text":203,"correct":22},{"key":24,"text":205,"correct":22},{"key":28,"text":201,"correct":26},{"key":31,"text":564,"correct":22},"不确定性",{"id":566,"libraryId":5,"type":178,"typeLabel":179,"stem":567,"options":568,"answer":312,"analysis":33},939607,"下列关于工程项目管理的说法，正确的有( )。",[569,571,573,575,577],{"key":20,"text":570,"correct":26},"项目备案属于工程项目外部管理",{"key":24,"text":572,"correct":26},"内部管理主要是通过建立和运行科学的管理体系实现",{"key":28,"text":574,"correct":26},"业主方的项目管理是工程项目管理的核心",{"key":31,"text":576,"correct":22},"内部管理具有强制约束作用",{"key":191,"text":578,"correct":26},"工程项目管理的环境分为内部环境和外部环境",{"id":580,"libraryId":5,"type":178,"typeLabel":179,"stem":581,"options":582,"answer":488,"analysis":33},939608,"工程项目的主要利益相关方的要求和期望，需要从以下( )层面来理解。",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"工程项目具有哪些利益相关方",{"key":24,"text":586,"correct":26},"利益相关方有哪些方面的要求和期望",{"key":28,"text":588,"correct":26},"利益相关方每一个方面的具体要求和期望是什么",{"key":31,"text":590,"correct":26},"利益相关方要求和期望之间具有什么样的冲突",{"key":191,"text":592,"correct":22},"如何协调利益相关方之间的冲突，并满足或超出他们的所有要求及期望",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},939609,"动态控制广泛应用于工程项目过程中，下列不属于该类“过程”的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"主动控制",{"key":24,"text":600,"correct":22},"质量控制",{"key":28,"text":602,"correct":22},"费用控制",{"key":31,"text":604,"correct":22},"进度控制",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":31,"analysis":33},939610,"下列不属于工程项目复杂性表现的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"工程项目各参与方沟通中存在“信息孤岛”等的问题",{"key":24,"text":612,"correct":22},"工程项目的目标多，涉及面广，群体作业",{"key":28,"text":614,"correct":22},"工程项目的建设周期长，期间国际国内政治局势.社会.经济.法律.文化方面可能发生变化",{"key":31,"text":616,"correct":26},"工程项目实施完成后，在其寿命期内一般不会推到重来，故往往难以逆转",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":31,"analysis":33},939611,"目标系统是工程项目所要达到的最终状态的（ ）系统。",[621,623,624,626],{"key":20,"text":622,"correct":22},"组织",{"key":24,"text":543,"correct":22},{"key":28,"text":625,"correct":22},"管理",{"key":31,"text":627,"correct":26},"描述",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":31,"analysis":33},939612,"下列关于工程项目目标的说法，不正确的是（ ）。",[632,634,636,638],{"key":20,"text":633,"correct":22},"工程项目目标是一种层次结构",{"key":24,"text":635,"correct":22},"工程项目目标系统可以采用 WBS 建立",{"key":28,"text":637,"correct":22},"项目目标系统至少由三个层次构成",{"key":31,"text":639,"correct":26},"工程项目目标系统建立的第一步是识别需求",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":28,"analysis":33},939613,"下列关于工程项目主要利害关系者，对工程项目的要求和期望表达错误的是（ ）。",[644,646,648,650],{"key":20,"text":645,"correct":22},"政府部门要求工程项目与整个国家.政策。立法相一致",{"key":24,"text":647,"correct":22},"项目业主期望投资少，利益高，时间段，质量合格",{"key":28,"text":649,"correct":26},"金融机构要求贷款安全，按预定日期支付贷款，项目能提供较低的回报",{"key":31,"text":651,"correct":22},"社会公众期望工程建设无社会风险，无污染及公害",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":28,"analysis":33},939614,"下列有关工程项目周期阶段的说法，正确的是（ ）。",[656,658,660,662],{"key":20,"text":657,"correct":22},"工程项目准备阶段的主要任务是对工程项目投资的必要性.可行性进行科学论证",{"key":24,"text":659,"correct":22},"工程项目准备阶段投入少，却对工程项目的战略方向起着决定性的作用",{"key":28,"text":661,"correct":26},"工程项目试生产正常并经业主验收后，工程项目实施阶段即告结束",{"key":31,"text":663,"correct":22},"工程项目实施阶段包括项目的保修和回访",[665,668,671,674,677,680],{"id":15,"name":666,"category":7,"favorite":667},"领导干部任职前廉政法规知识测试题",92,{"id":669,"name":670,"category":7,"favorite":15},595,"建筑结构与设备",{"id":672,"name":673,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":675,"name":676,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":678,"name":679,"category":7,"favorite":8},534,"BIM工程师",{"id":681,"name":679,"category":7,"favorite":8},535]