[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":669},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,36,50,1948,[13,34,52,67,82,97,112,124,136,148,160,172,184,196,208,220,232,244,257,271,285,300,311,324,336,350,364,376,388,400,412,420,432,444,452,464,478,493,505,517,531,546,560,575,590,605,619,631,643,655],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},939465,1,"单选题","根据《预评价导则》要求，预评价的内容不包括( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","危险度评价",false,{"key":24,"text":25,"correct":22},"B","对策措施及建议",{"key":27,"text":28,"correct":22},"C","危险、有害因素识别",{"key":30,"text":31,"correct":32},"D","工程项目的重大危险源分析",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},939466,2,"多选题","工程项目预评价的方法主要有( )。",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"因果分析法",{"key":24,"text":43,"correct":32},"事故树分析法",{"key":27,"text":45,"correct":32},"事故模型法",{"key":30,"text":47,"correct":32},"度评价法",{"key":49,"text":50,"correct":22},"E","SWOT 分析法","ABCD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},939467,"工程项目预评价报告的内容主要有( )。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"状况初步评价",{"key":24,"text":59,"correct":22},"安装管理岗位职责",{"key":27,"text":61,"correct":32},"定性、定量评价",{"key":30,"text":63,"correct":32},"卫生健康对策措施",{"key":49,"text":65,"correct":22},"事故原因分析","ACD",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},939468,"在施工计划的实施阶段，管理工作主要有( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"编制施工计划",{"key":24,"text":74,"correct":32},"建立生产责任制",{"key":27,"text":76,"correct":32},"开展教育培训",{"key":30,"text":78,"correct":32},"进行技术交底",{"key":49,"text":80,"correct":22},"进行施工策划","BCD",{"id":83,"libraryId":5,"type":36,"typeLabel":37,"stem":84,"options":85,"answer":96,"analysis":33},939469,"教育培训应包括的步骤有( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"培训前的准备",{"key":24,"text":89,"correct":22},"技术交底",{"key":27,"text":91,"correct":32},"信息与知识的传授",{"key":30,"text":93,"correct":32},"培训效果评价",{"key":49,"text":95,"correct":32},"监督执行","ACDE",{"id":98,"libraryId":5,"type":36,"typeLabel":37,"stem":99,"options":100,"answer":111,"analysis":33},939470,"绿色设计的原则的“3R”原则包括( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":32},"减少环境污染",{"key":24,"text":104,"correct":32},"减小能源消耗",{"key":27,"text":106,"correct":32},"产品和零部件的回收再生循环或者重新利用",{"key":30,"text":108,"correct":22},"清洁生产评价",{"key":49,"text":110,"correct":22},"工程分析","ABC",{"id":113,"libraryId":5,"type":36,"typeLabel":37,"stem":114,"options":115,"answer":111,"analysis":33},939471,"绿色设计的主要内容包括( )",[116,118,120,122,123],{"key":20,"text":117,"correct":32},"绿色材料选择与管理",{"key":24,"text":119,"correct":32},"产品的可回收性设计",{"key":27,"text":121,"correct":32},"产品的可拆卸性设计",{"key":30,"text":108,"correct":22},{"key":49,"text":110,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},939472,"狭义环境管理的核心是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":32},"监督和服务",{"key":24,"text":131,"correct":22},"协调和监督",{"key":27,"text":133,"correct":22},"决策和服务",{"key":30,"text":135,"correct":22},"协调和综合决策",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":30,"analysis":33},939473,"工程项目 HSE 管理的重要依据是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"项目 HSE 管理的持续性",{"key":24,"text":143,"correct":22},"施工承包商的 HSE 体系建设和运行效果",{"key":27,"text":145,"correct":22},"工程活动与人类自身以及生态环境的协调性",{"key":30,"text":147,"correct":32},"上级组织（公司）的 HSE 制度体系和文化建设",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},939474,"工程项目的安全预评价工作应在项目（ ）完成。",[152,154,156,158],{"key":20,"text":153,"correct":32},"初步设计会审前",{"key":24,"text":155,"correct":22},"项目申请报告核准前",{"key":27,"text":157,"correct":22},"安全生产许可评审前",{"key":30,"text":159,"correct":22},"可行性研究报告报批前",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":30,"analysis":33},939475,"安全预评价的程序中，危险、有害因素识别以后，紧接着应该进行的步骤是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"确定评价单元",{"key":24,"text":167,"correct":22},"确定评价方法",{"key":27,"text":169,"correct":22},"危险性分析评价",{"key":30,"text":171,"correct":32},"危险.有害因素分析",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":30,"analysis":33},939476,"下列不属于施工安全计划实施内容的是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"建立和执行安全生产管理制度",{"key":24,"text":179,"correct":22},"开展安全教育培训",{"key":27,"text":181,"correct":22},"进行安全技术交底",{"key":30,"text":183,"correct":32},"编制施工安全计划",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":27,"analysis":33},939477,"建设单位应将拆除工程发包给具有相应资质等级的施工单位，应在拆除工程施工（ ）前，将有关资料报送有关主管部门或者其他有关部门备案。",[188,190,192,194],{"key":20,"text":189,"correct":22},"7 日",{"key":24,"text":191,"correct":22},"14 日",{"key":27,"text":193,"correct":32},"15 日",{"key":30,"text":195,"correct":22},"28 日",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":30,"analysis":33},939478,"下列不属于施工单位安全责任的是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"应保证安全生产所需资金的投入",{"key":24,"text":203,"correct":22},"应编制安全技术措施和施工现场临时用电方案",{"key":27,"text":205,"correct":22},"应设立安全生产管理机构和配备专职安全管理人员",{"key":30,"text":207,"correct":32},"应确定工程项目安全作业环境及安全施工措施所需费用",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},939479,"（ ）是各项安全生产规章制度的核心。",[212,214,216,218],{"key":20,"text":213,"correct":22},"“三同时”制度",{"key":24,"text":215,"correct":32},"安全生产责任制",{"key":27,"text":217,"correct":22},"安全预评价制度",{"key":30,"text":219,"correct":22},"安全措施计划制度",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},939480,"根据《生产安全事故报告和调查处理条例》，生产安全事故发生后，（ ）应当在接到报告后 1 小时内，向事故发生地县级以上人民政府安全生产监督部门和负有安全生产监督管理职责的有关部门报告。",[224,226,228,230],{"key":20,"text":225,"correct":32},"单位负责人",{"key":24,"text":227,"correct":22},"项目负责人",{"key":27,"text":229,"correct":22},"项目技术负责人",{"key":30,"text":231,"correct":22},"现场专职安全员",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},939481,"职业健康安全与环境管理体系的建立步骤中，人员培训之前的步骤是（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":22},"体系策划与设计",{"key":24,"text":239,"correct":32},"成立工作小组",{"key":27,"text":241,"correct":22},"初始评审",{"key":30,"text":243,"correct":22},"文件发布和体系试运行",{"id":245,"libraryId":5,"type":36,"typeLabel":37,"stem":246,"options":247,"answer":256,"analysis":33},939482,"工程项目环境影响评价的工作内容有（ ）。",[248,250,251,252,254],{"key":20,"text":249,"correct":22},"工程施工",{"key":24,"text":110,"correct":32},{"key":27,"text":108,"correct":32},{"key":30,"text":253,"correct":22},"工程项目环境影响的分析与调整",{"key":49,"text":255,"correct":32},"工程项目的环境影响识别与预测","BCE",{"id":258,"libraryId":5,"type":36,"typeLabel":37,"stem":259,"options":260,"answer":111,"analysis":33},939483,"下列不属于绿色设计方法的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":32},"冗余设计",{"key":24,"text":264,"correct":32},"同步设计",{"key":27,"text":266,"correct":32},"扩大化设计",{"key":30,"text":268,"correct":22},"模块化设计",{"key":49,"text":270,"correct":22},"并行工程设计",{"id":272,"libraryId":5,"type":36,"typeLabel":37,"stem":273,"options":274,"answer":51,"analysis":33},939484,"下列对绿色施工的原则，表述正确的有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":32},"应注重现场环境对于保护生态环境，维持地方文脉",{"key":24,"text":278,"correct":32},"应尽量减少环境污染，提高环境品质",{"key":27,"text":280,"correct":32},"布置施工场地时应尽量结合项目所在地的气候特征",{"key":30,"text":282,"correct":32},"减少资源的消耗，节约能源，保护水资源",{"key":49,"text":284,"correct":22},"增加对建设工程的投资，着重体现经济技术先进性",{"id":286,"libraryId":5,"type":36,"typeLabel":37,"stem":287,"options":288,"answer":299,"analysis":33},939485,"下列关于施工安全计划的实施，表述正确的有（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":32},"安全培训是安全计划的核心内容之一",{"key":24,"text":292,"correct":32},"单位工程技术负责人负责安全技本交底",{"key":27,"text":294,"correct":22},"安全培训应为培训前的准备.信息与知识的传授.培训效果评价三个步骤",{"key":30,"text":296,"correct":22},"安全技术交底可采用书面文本或其他形式",{"key":49,"text":298,"correct":22},"项目经理部应定期对安全生产进行考评","AB",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},939486,"各项安全生产规章制度的核心是（ ）。",[304,305,307,309],{"key":20,"text":215,"correct":32},{"key":24,"text":306,"correct":22},"安全技术措施",{"key":27,"text":308,"correct":22},"职业健康措施",{"key":30,"text":310,"correct":22},"安全宣传教育措施",{"id":312,"libraryId":5,"type":36,"typeLabel":37,"stem":313,"options":314,"answer":66,"analysis":33},939487,"工程项目安全预评价报告的内容主要有（ ）。",[315,317,319,320,322],{"key":20,"text":316,"correct":32},"安全状况初步评价",{"key":24,"text":318,"correct":22},"安全管理岗位",{"key":27,"text":61,"correct":32},{"key":30,"text":321,"correct":32},"安全卫生健康对策措施",{"key":49,"text":323,"correct":22},"安全事故原因分析",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},939488,"安全生产检查的内容不包括（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":32},"查知识",{"key":24,"text":331,"correct":22},"查思想",{"key":27,"text":333,"correct":22},"查管理",{"key":30,"text":335,"correct":22},"查事故处理",{"id":337,"libraryId":5,"type":36,"typeLabel":37,"stem":338,"options":339,"answer":66,"analysis":33},939489,"《建设项目（工程）劳动安全卫生预评价管理办法》规定（ ）必须进行劳动安全卫生预评价。",[340,342,344,346,348],{"key":20,"text":341,"correct":32},"大中型建设项目",{"key":24,"text":343,"correct":22},"火灾危险性生产类别为甲乙类的工程项目",{"key":27,"text":345,"correct":32},"爆炸危险场所等级为特别危险场所和高度危险场所的工程项目",{"key":30,"text":347,"correct":32},"大量生产或使用Ⅰ级、Ⅱ级危害程度的职业性接触毒物的工程项目",{"key":49,"text":349,"correct":22},"大量生产或使用石棉粉料或含有5%以上的游离二氧化硅粉料的工程项目",{"id":351,"libraryId":5,"type":36,"typeLabel":37,"stem":352,"options":353,"answer":299,"analysis":33},939490,"建设方案研究阶段的安全管理包括（ ）。",[354,356,358,360,362],{"key":20,"text":355,"correct":32},"工程项目安全隐患因素分析",{"key":24,"text":357,"correct":32},"安全生产保障措施",{"key":27,"text":359,"correct":22},"安全预评价",{"key":30,"text":361,"correct":22},"施工安全策划",{"key":49,"text":363,"correct":22},"地质安全影响分析",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},939491,"（ ）为绿色施工第一责任人。 ??",[368,370,372,374],{"key":20,"text":369,"correct":22},"施工单位技术负责人",{"key":24,"text":371,"correct":22},"总监理工程师",{"key":27,"text":373,"correct":32},"项目经理",{"key":30,"text":375,"correct":22},"施工单位的主要负责人",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},939492,"死亡4人，造成直接经济损失5000万的事故由（ ）负责调查。",[380,382,384,386],{"key":20,"text":381,"correct":22},"县级人民政府",{"key":24,"text":383,"correct":22},"设区的市级人民政府",{"key":27,"text":385,"correct":32},"省级人民政府",{"key":30,"text":387,"correct":22},"国务院",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":30,"analysis":33},939493,"信息交流属于职业健康安全管理体系中（ ）的二级要素。",[392,394,396,398],{"key":20,"text":393,"correct":22},"组织所处的环境",{"key":24,"text":395,"correct":22},"领导作用",{"key":27,"text":397,"correct":22},"策划",{"key":30,"text":399,"correct":32},"支持和运行",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},939494,"根据《建设工程生产管理条例》，在申请领取施工许可证时应提供建设工程有关 施工措施资料，这属于( )的责任。",[404,406,408,410],{"key":20,"text":405,"correct":32},"建设单位",{"key":24,"text":407,"correct":22},"设计单位",{"key":27,"text":409,"correct":22},"监理单位",{"key":30,"text":411,"correct":22},"施工单位",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},939495,"根据《建设工程生产管理条例》，( )应当审查施工组织设计中的技术措施或 者专项施工方案是否符合工程建设强制性标准。",[416,417,418,419],{"key":20,"text":405,"correct":22},{"key":24,"text":407,"correct":22},{"key":27,"text":409,"correct":32},{"key":30,"text":411,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},939496,"工程项目职业健康管理中的“三同时”制度是指在我国建设的各类工程，职业健康安 全设施必须与主体工程( )。",[424,426,428,430],{"key":20,"text":425,"correct":22},"同时立项、同时实施、同时投产使用",{"key":24,"text":427,"correct":22},"同时立项、同时实施、同时验收交付",{"key":27,"text":429,"correct":32},"同时设计、同时施工、同时投产使用",{"key":30,"text":431,"correct":22},"同时设计、同时施工、同时验收交付",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},939497,"根据《生产事故报告和调查处理条例》，生产事故发生后，单位负责应当在接 到报告后( )，向事故发生的县级以上人民政府生产监督部门和负有生产监督管理职 责的有关部门报告。",[436,438,440,442],{"key":20,"text":437,"correct":32},"1 小时内",{"key":24,"text":439,"correct":22},"2 小时内",{"key":27,"text":441,"correct":22},"8 小时内",{"key":30,"text":443,"correct":22},"12 小时内",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":27,"analysis":33},939498,"某建设工程施工过程中发生较大生产事故，根据《生产事故调查处理条例》规 定该级事故应由( )负责调查。",[448,449,450,451],{"key":20,"text":387,"correct":22},{"key":24,"text":385,"correct":22},{"key":27,"text":383,"correct":32},{"key":30,"text":381,"correct":22},{"id":453,"libraryId":5,"type":36,"typeLabel":37,"stem":454,"options":455,"answer":111,"analysis":33},939499,"绿色设计也称为生态设计、环境设计，绿色设计的方法主要包括( )。",[456,457,459,460,462],{"key":20,"text":268,"correct":32},{"key":24,"text":458,"correct":32},"循环设计",{"key":27,"text":270,"correct":32},{"key":30,"text":461,"correct":22},"平行工程设计",{"key":49,"text":463,"correct":22},"板块设计",{"id":465,"libraryId":5,"type":36,"typeLabel":37,"stem":466,"options":467,"answer":51,"analysis":33},939500,"绿色施工是指通过科学管理和技术进步，最大限度地节约资源并减少对环境负面影响的 施工活动，从而实现( )和环境保护。",[468,470,472,474,476],{"key":20,"text":469,"correct":32},"节能",{"key":24,"text":471,"correct":32},"节地",{"key":27,"text":473,"correct":32},"节水",{"key":30,"text":475,"correct":32},"节材",{"key":49,"text":477,"correct":22},"节电",{"id":479,"libraryId":5,"type":36,"typeLabel":37,"stem":480,"options":481,"answer":492,"analysis":33},939501,"绿色施工管理的主要内容包括( )",[482,484,486,488,490],{"key":20,"text":483,"correct":32},"组织管理",{"key":24,"text":485,"correct":22},"咨询管理",{"key":27,"text":487,"correct":32},"规划管理",{"key":30,"text":489,"correct":22},"设计管理",{"key":49,"text":491,"correct":32},"评价管理","ACE",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},939502,"工程项目的绿色施工方案应包括( )。",[497,499,501,503],{"key":20,"text":498,"correct":22},"提高质量标准措施",{"key":24,"text":500,"correct":22},"降低成本措施",{"key":27,"text":502,"correct":32},"节地措施",{"key":30,"text":504,"correct":22},"提前竣工措施",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},939503,"根据《职业健康管理体系》，不属于运行要素的是( )。",[509,511,513,515],{"key":20,"text":510,"correct":22},"变更管理",{"key":24,"text":512,"correct":32},"管理评审",{"key":27,"text":514,"correct":22},"外包",{"key":30,"text":516,"correct":22},"应急准备和响应",{"id":518,"libraryId":5,"type":36,"typeLabel":37,"stem":519,"options":520,"answer":66,"analysis":33},939504,"HSE 管理体系是（ ）的简称。",[521,523,525,527,529],{"key":20,"text":522,"correct":32},"健康",{"key":24,"text":524,"correct":22},"质量",{"key":27,"text":526,"correct":32},"安全",{"key":30,"text":528,"correct":32},"环境",{"key":49,"text":530,"correct":22},"投资",{"id":532,"libraryId":5,"type":36,"typeLabel":37,"stem":533,"options":534,"answer":545,"analysis":33},939505,"根据安全生产保障措施的要求，针对安全隐患因素的场所、范围以及危害程度，研究提出相应的安全措施方案，主要有（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":32},"对危险部位和危险作业应提出安全防护措施方案",{"key":24,"text":538,"correct":32},"对易产生职业病的场所，应提出防护和卫生保健措施方案",{"key":27,"text":540,"correct":22},"危险.有害因素识别与分析",{"key":30,"text":542,"correct":32},"生产过程中设置自动报警.紧急事故处理等安全设施",{"key":49,"text":544,"correct":22},"提出安全对策措施及建议","ABD",{"id":547,"libraryId":5,"type":36,"typeLabel":37,"stem":548,"options":549,"answer":559,"analysis":33},939506,"根据《安全预评价导则》要求，安全预评价主要包括（ ）等方面的内容。",[550,552,554,556,557],{"key":20,"text":551,"correct":22},"安全验收评价",{"key":24,"text":553,"correct":32},"危险.有害因素识别",{"key":27,"text":555,"correct":22},"风险性评价",{"key":30,"text":21,"correct":32},{"key":49,"text":558,"correct":32},"安全对策措施及建议","BDE",{"id":561,"libraryId":5,"type":36,"typeLabel":37,"stem":562,"options":563,"answer":574,"analysis":33},939507,"按国家的有关规定，一般工程项目的两个阶段设计包括（ ）。",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"方案设计",{"key":24,"text":567,"correct":32},"初步设计",{"key":27,"text":569,"correct":22},"技术设计",{"key":30,"text":571,"correct":22},"总图设计",{"key":49,"text":573,"correct":32},"施工图设计","BE",{"id":576,"libraryId":5,"type":36,"typeLabel":37,"stem":577,"options":578,"answer":589,"analysis":33},939508,"下列属于编制施工安全计划主要内容的有（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":32},"项目概况",{"key":24,"text":582,"correct":22},"卫生保健设拖",{"key":27,"text":584,"correct":22},"地质安全影响因素",{"key":30,"text":586,"correct":32},"制定安全技术措施",{"key":49,"text":588,"correct":32},"落实安全检查评价和奖惩制度","ADE",{"id":591,"libraryId":5,"type":36,"typeLabel":37,"stem":592,"options":593,"answer":604,"analysis":33},939509,"下列属于建设单位的安全责任的有（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":32},"提供施工现场及毗邻区域地下管线资料",{"key":24,"text":597,"correct":22},"按照法律法规和工程建设强制性标准进行设计",{"key":27,"text":599,"correct":22},"审查施工组织设计中的安全技术措施",{"key":30,"text":601,"correct":22},"保证安全生产所需资金的投入",{"key":49,"text":603,"correct":32},"将拆除工程备案","AE",{"id":606,"libraryId":5,"type":36,"typeLabel":37,"stem":607,"options":608,"answer":492,"analysis":33},939510,"根据《建设项目（工程）劳动安全卫生预评价管理办法》，下列项目必须进行劳动安全卫生预评价的有（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":32},"属于《国家计划委员会.国家基本建设委员会.财政部关于基本建设项目和大中型划分标准的规定》中规定的大型建设项目",{"key":24,"text":612,"correct":22},"属于《建筑设计防火规范》中规定的火灾危险性生产类别为乙类的工程项目",{"key":27,"text":614,"correct":32},"属于《爆炸危险场所安全规定》中规定的爆炸危险场所等级为特别危险场所的工程项目",{"key":30,"text":616,"correct":22},"大量生产或使用《职业性接触毒物危害程度分级》规定的Ⅰ.Ⅱ.Ⅲ级危害程度的职业性接触毒物的工程项目",{"key":49,"text":618,"correct":32},"大量生产或使用石棉粉料的工程项目",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":24,"analysis":33},939511,"安全预评价程序中，危险、有害因素识别分析后，下一步要做的是（ ）。",[623,625,627,629],{"key":20,"text":624,"correct":22},"选择安全预测评价方法",{"key":24,"text":626,"correct":32},"确定安全预评价单元",{"key":27,"text":628,"correct":22},"定性评价",{"key":30,"text":630,"correct":22},"定量评价",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":24,"analysis":33},939512,"应急预案的类型不包括（ ）。",[635,637,639,641],{"key":20,"text":636,"correct":22},"综合应急预案",{"key":24,"text":638,"correct":32},"单项应急预案",{"key":27,"text":640,"correct":22},"专项应急预案",{"key":30,"text":642,"correct":22},"现场应急处置方案",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":24,"analysis":33},939513,"现场处置方案的演练频次是（ ）。",[647,649,651,653],{"key":20,"text":648,"correct":22},"每年至少一次",{"key":24,"text":650,"correct":32},"每半年至少一次",{"key":27,"text":652,"correct":22},"每季度至少一次",{"key":30,"text":654,"correct":22},"每月一次",{"id":656,"libraryId":5,"type":36,"typeLabel":37,"stem":657,"options":658,"answer":492,"analysis":33},939514,"绿色施工的原则有（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":32},"关注工程项目的可持续发展，合理利用资源、能源",{"key":24,"text":662,"correct":22},"采用模块化、循环设计、并行工程设计",{"key":27,"text":664,"correct":32},"注重环境品质，减少施工造成的环境污染",{"key":30,"text":666,"correct":22},"建立安全施工责任制",{"key":49,"text":668,"correct":32},"结合气候、气象条件，合理安排施工计划",[670,673,676,679,682,685],{"id":15,"name":671,"category":7,"favorite":672},"领导干部任职前廉政法规知识测试题",92,{"id":674,"name":675,"category":7,"favorite":15},595,"建筑结构与设备",{"id":677,"name":678,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":680,"name":681,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":683,"name":684,"category":7,"favorite":8},534,"BIM工程师",{"id":686,"name":684,"category":7,"favorite":8},535]