[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":643},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,34,50,1948,[13,34,43,55,67,79,91,103,121,136,148,160,175,183,194,206,218,230,242,254,266,278,290,302,311,323,335,347,359,373,388,402,417,431,446,458,473,485,499,511,523,538,552,561,573,582,594,606,618,630],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},939362,1,"单选题","设计单位应当就审查合格的施工图设计文件向( )作出详细说明。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","建设单位",false,{"key":24,"text":25,"correct":26},"B","施工单位",true,{"key":28,"text":29,"correct":22},"C","监理单位",{"key":31,"text":32,"correct":22},"D","咨询单位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},939363,"对建设工程的施工质量负责的主体是( )。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":42,"correct":22},"设计单位",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":28,"analysis":33},939364,"工程项目质量管理的 PDCA 循环管理法的第三个步骤的内容是( )。",[47,49,51,53],{"key":20,"text":48,"correct":22},"分析现状，找出问题",{"key":24,"text":50,"correct":22},"分析产生问题的原因",{"key":28,"text":52,"correct":26},"主因确认",{"key":31,"text":54,"correct":22},"制定计划",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":24,"analysis":33},939365,"由工程咨询企业领导组织，邀请社会上的专家参加，由项目经理做汇报的工程咨询成果 质量评审属于( )。",[59,61,63,65],{"key":20,"text":60,"correct":22},"外部评审",{"key":24,"text":62,"correct":26},"内部评审",{"key":28,"text":64,"correct":22},"第三方评审",{"key":31,"text":66,"correct":22},"社会评审",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":28,"analysis":33},939366,"《建设工程勘察设计管理条例》规定，编制( )设计文件，应注明建设工程合理使用年 限。",[71,73,75,77],{"key":20,"text":72,"correct":22},"方案设计",{"key":24,"text":74,"correct":22},"初步设计",{"key":28,"text":76,"correct":26},"施工图",{"key":31,"text":78,"correct":22},"勘察",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},939367,"工程勘察工作的三个阶段不包括( )。",[83,85,87,89],{"key":20,"text":84,"correct":22},"可行性研究勘察",{"key":24,"text":86,"correct":22},"初步勘察",{"key":28,"text":88,"correct":22},"详细勘察",{"key":31,"text":90,"correct":26},"施工勘察",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},939368,"勘察纲要应由( )审批、签字并加盖公章。",[95,97,99,101],{"key":20,"text":96,"correct":22},"项目负责人",{"key":24,"text":98,"correct":26},"勘察单位技术负责人",{"key":28,"text":100,"correct":22},"项目技术负责人",{"key":31,"text":102,"correct":22},"总监理工程师",{"id":104,"libraryId":5,"type":105,"typeLabel":106,"stem":107,"options":108,"answer":120,"analysis":33},939369,2,"多选题","设计管理工作划分为六个阶段，其中设计阶段的工作内容( )。",[109,111,113,115,117],{"key":20,"text":110,"correct":26},"项目方案设计",{"key":24,"text":112,"correct":26},"项目初步设计",{"key":28,"text":114,"correct":22},"项目竣工验收与竣工图",{"key":31,"text":116,"correct":26},"项目施工图设计",{"key":118,"text":119,"correct":22},"E","项目后评价","ABD",{"id":122,"libraryId":5,"type":105,"typeLabel":106,"stem":123,"options":124,"answer":135,"analysis":33},939370,"施工图设计阶段需报政府审批的主要技术文件包括( )。",[125,127,129,131,133],{"key":20,"text":126,"correct":26},"人防设计",{"key":24,"text":128,"correct":26},"消防设计",{"key":28,"text":130,"correct":26},"施工图设计",{"key":31,"text":132,"correct":22},"交通设计",{"key":118,"text":134,"correct":22},"人防规划设计","ABC",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":31,"analysis":33},939371,"对涉及结构、节能、环境保护和主要使用功能的试块、试件及材料，应在进场时或 施工中按规定进行( )。",[140,142,144,146],{"key":20,"text":141,"correct":22},"验收",{"key":24,"text":143,"correct":22},"现场检查",{"key":28,"text":145,"correct":22},"抽样检验",{"key":31,"text":147,"correct":26},"见证检验",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":28,"analysis":33},939372,"某工程竣工验收时发现隐蔽工程检査质重不合格，经査，是由于设计缺陷造成的。下列 说法中，正确的是( )。",[152,154,156,158],{"key":20,"text":153,"correct":22},"设计人应负责返修，费用由设计方先行承担",{"key":24,"text":155,"correct":22},"承包人应负责返修，费用由承包人先行承担",{"key":28,"text":157,"correct":26},"承包人应负责返修，费用由发包人先行承担",{"key":31,"text":159,"correct":22},"由设计缺陷造成质量不合格的，承包人不负责返修",{"id":161,"libraryId":5,"type":105,"typeLabel":106,"stem":162,"options":163,"answer":174,"analysis":33},939373,"在正常条件下，建设工程的最低保修期限，正确的有( )。",[164,166,168,170,172],{"key":20,"text":165,"correct":26},"主体结构工程为设计文件规定的该工程的合理使用年限",{"key":24,"text":167,"correct":26},"供热与供冷系统，为 2 个采暖期、供冷期",{"key":28,"text":169,"correct":22},"屋面防水工程为 3 年",{"key":31,"text":171,"correct":22},"装修工程为 1 年",{"key":118,"text":173,"correct":26},"设备安装为 2 年","ABE",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":28,"analysis":33},939374,"工程项目试运行总结报告由( )负责编制。",[179,180,181,182],{"key":20,"text":21,"correct":22},{"key":24,"text":42,"correct":22},{"key":28,"text":25,"correct":26},{"key":31,"text":29,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},939375,"建设单位收到工程竣工报告后，由( )组织监理、施工、设计、勘察等单位项目负责人 进行单位工程验收",[187,189,191,192],{"key":20,"text":188,"correct":22},"专业监理工程师",{"key":24,"text":190,"correct":22},"咨询工程师",{"key":28,"text":102,"correct":22},{"key":31,"text":193,"correct":26},"建设单位项目负责人",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},939376,"工程项目的前期阶段，不属于项目经理建立并落实质量管理责任制的工作内容是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"制订质量计划并组织实施",{"key":24,"text":201,"correct":26},"明确咨询成果的质量目标和质量标准",{"key":28,"text":203,"correct":22},"对需要进行科学实验的工作进行科学实验",{"key":31,"text":205,"correct":22},"按质量计划规定，督促.检查项目质量计划执行情况",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":33},939377,"下列属于工程咨询成果质量评审制度中的外部评审的是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":26},"业主组织评审",{"key":24,"text":213,"correct":22},"政府主管部门组织评审",{"key":28,"text":215,"correct":22},"项目团队组织的内部评审",{"key":31,"text":217,"correct":22},"工程咨询单位领导组织的内部评审",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},939378,"试运行由业主方和承包方在合同中约定，下列关于试运行阶段双方的职责，表述错误的是（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"由承包方编写试运行总结",{"key":24,"text":225,"correct":26},"一般由业主方负责指导和技术服务",{"key":28,"text":227,"correct":22},"一般由业主方全面负责组织和指挥",{"key":31,"text":229,"correct":22},"试运行工作是由业主方和承包方合作进行",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":28,"analysis":33},939379,"下列工作中，属于业主方在试运行阶段负责的工作是（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"编制试运行计划",{"key":24,"text":237,"correct":22},"编制试运行操作手册",{"key":28,"text":239,"correct":26},"提供试运行所需各种资源",{"key":31,"text":241,"correct":22},"明确试运行过程的质量控制点和合格标准",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":28,"analysis":33},939380,"根据《质量管理体系 基础和术语》（GB\u002FT 19000－2016），下列不属于对质量的要求为（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":22},"适用性",{"key":24,"text":249,"correct":22},"可靠性",{"key":28,"text":251,"correct":26},"持续性",{"key":31,"text":253,"correct":22},"经济性",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},939381,"下列不属于勘察现场作业的质量管理内容的是（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":26},"审查勘察纲要编制情况",{"key":24,"text":261,"correct":22},"现场作业人员应进行专业培训",{"key":28,"text":263,"correct":22},"原始记录表格经有关作业人员检查.签字",{"key":31,"text":265,"correct":22},"勘察仪器.设备.试验室有明确的管理程序",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},939382,"编制（ ），应当满足编制初步设计文件和控制概算的需要。",[270,272,274,276],{"key":20,"text":271,"correct":26},"方案设计文件",{"key":24,"text":273,"correct":22},"技术设计文件",{"key":28,"text":275,"correct":22},"施工图设计文件",{"key":31,"text":277,"correct":22},"竣工图备案文件",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},939383,"工程项目前期研究工作一般由业主委托（ ）去做，咨询成果经评审后由业主决策或报经有关单位决策。",[282,284,286,288],{"key":20,"text":283,"correct":22},"造价咨询单位",{"key":24,"text":285,"correct":26},"工程咨询单位",{"key":28,"text":287,"correct":22},"工程监理单位",{"key":31,"text":289,"correct":22},"资产评估单位",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":28,"analysis":33},939384,"为了使设计过程中设计部门以及设计各专业之间能做到协调、统一，工程咨询单位对设计质量管理的方法主要是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"加强设计标准化工作",{"key":24,"text":297,"correct":22},"加强设计质量流程管理",{"key":28,"text":299,"correct":26},"加强设计接口管理",{"key":31,"text":301,"correct":22},"加强设计文件会签管理",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},939385,"在（ ）阶段，工程咨询单位应做出设计概算，对相应设计内容组织实施评审工作，并提出勘察工作需求，完成地勘报告申报管理工作。",[306,307,308,309],{"key":20,"text":110,"correct":22},{"key":24,"text":112,"correct":26},{"key":28,"text":116,"correct":22},{"key":31,"text":310,"correct":22},"项目勘察设计",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},939386,"下列不属于单位工程质量验收合格的标准的为（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"观感质量应符合要求",{"key":24,"text":318,"correct":22},"质量管理资料应完整",{"key":28,"text":320,"correct":22},"所含分部工程的质量均验收合格",{"key":31,"text":322,"correct":26},"所含分部工程所有使用功能的检验资料应完整",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":28,"analysis":33},939387,"（ ）阶段，将设计意图变成工程实体，是保证工程项目质量的关键环节。",[327,329,331,333],{"key":20,"text":328,"correct":22},"工程项目前期阶段",{"key":24,"text":330,"correct":22},"工程项目准备阶段",{"key":28,"text":332,"correct":26},"工程项目实施阶段",{"key":31,"text":334,"correct":22},"工程项目试运行阶段",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},939388,"（ ）是施工准备和施工全过程的指导性文件。",[339,341,343,345],{"key":20,"text":340,"correct":22},"施工方案",{"key":24,"text":342,"correct":26},"施工组织设计",{"key":28,"text":344,"correct":22},"项目设计文件",{"key":31,"text":346,"correct":22},"项目管理规划大纲",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},939389,"根据《建设工程质量管理条例》规定，屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏的最低保修期限为（ ）年。",[351,353,355,357],{"key":20,"text":352,"correct":22},"1",{"key":24,"text":354,"correct":22},"2",{"key":28,"text":356,"correct":22},"3",{"key":31,"text":358,"correct":26},"5",{"id":360,"libraryId":5,"type":105,"typeLabel":106,"stem":361,"options":362,"answer":372,"analysis":33},939390,"在项目前期阶段制订并执行质量管理计划的内容包括（ ）。",[363,365,367,369,370],{"key":20,"text":364,"correct":22},"制订分层次的质量职责",{"key":24,"text":366,"correct":26},"把质量目标要求层层分解",{"key":28,"text":368,"correct":26},"识别顾客和相关方的要求和期望",{"key":31,"text":201,"correct":26},{"key":118,"text":371,"correct":22},"督促.检査项目质量计划执行情况","BCD",{"id":374,"libraryId":5,"type":105,"typeLabel":106,"stem":375,"options":376,"answer":387,"analysis":33},939391,"工程项目在机械选型及性能参数确定时，应考虑（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"技术上的合理性",{"key":24,"text":380,"correct":22},"经济上的先进性",{"key":28,"text":382,"correct":22},"施工过程的快捷性",{"key":31,"text":384,"correct":26},"使用操作及维护上的便利",{"key":118,"text":386,"correct":26},"对保证工程项目质量的影响","DE",{"id":389,"libraryId":5,"type":105,"typeLabel":106,"stem":390,"options":391,"answer":120,"analysis":33},939392,"下列属于工程项目质量管理基本方法的有（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":26},"三阶段控制法",{"key":24,"text":395,"correct":26},"三全控制法",{"key":28,"text":397,"correct":22},"全周期控制法",{"key":31,"text":399,"correct":26},"PDCA 循环管理法",{"key":118,"text":401,"correct":22},"WBS 控制法",{"id":403,"libraryId":5,"type":105,"typeLabel":106,"stem":404,"options":405,"answer":416,"analysis":33},939393,"根据《建设工程勘察设计管理条例》的相关规定，编制施工图设计文件，应当满足（ ）的需要。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"编制施工招标文件",{"key":24,"text":409,"correct":26},"非标准设备制作",{"key":28,"text":411,"correct":26},"施工",{"key":31,"text":413,"correct":22},"编制初步设计文件",{"key":118,"text":415,"correct":26},"设备材料采购","BCE",{"id":418,"libraryId":5,"type":105,"typeLabel":106,"stem":419,"options":420,"answer":416,"analysis":33},939394,"施工单位的质量责任和义务包括（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"向建设行政主管部门移交项目档案",{"key":24,"text":424,"correct":26},"建立质量责任制",{"key":28,"text":426,"correct":26},"按图施工",{"key":31,"text":428,"correct":22},"组织竣工验收",{"key":118,"text":430,"correct":26},"现场见证取样送检",{"id":432,"libraryId":5,"type":105,"typeLabel":106,"stem":433,"options":434,"answer":445,"analysis":33},939395,"质量控制点的内容不包括（ ）。 ??",[435,437,439,441,443],{"key":20,"text":436,"correct":22},"隐蔽工程验收",{"key":24,"text":438,"correct":26},"对下道工序有影响的部位",{"key":28,"text":440,"correct":22},"影响下道工序质量的技术间歇时间",{"key":31,"text":442,"correct":26},"与施工质量有关的参数",{"key":118,"text":444,"correct":22},"容易出现质量通病的部位","BD",{"id":447,"libraryId":5,"type":105,"typeLabel":106,"stem":448,"options":449,"answer":457,"analysis":33},939396,"工程项目质量是指工程项目产品、服务满足( )的程度。",[450,451,452,453,455],{"key":20,"text":247,"correct":26},{"key":24,"text":249,"correct":26},{"key":28,"text":253,"correct":26},{"key":31,"text":454,"correct":26},"协调性",{"key":118,"text":456,"correct":22},"系统性","ABCD",{"id":459,"libraryId":5,"type":105,"typeLabel":106,"stem":460,"options":461,"answer":472,"analysis":33},939397,"下列属于工程项目质量管理的特点的是( )。",[462,464,466,468,470],{"key":20,"text":463,"correct":26},"工程项目质量具有隐蔽性",{"key":24,"text":465,"correct":26},"影响工程项目质量的因素多",{"key":28,"text":467,"correct":26},"工程项目质量管理难度大",{"key":31,"text":469,"correct":22},"工程项目质量特性单一",{"key":118,"text":471,"correct":26},"工程项目周期长风险多","ABCE",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},939398,"《质量管理体系基础和术语 GB\u002FT 19000-2016 》规定的质量管理原则中，能够提升顾客 价值的是( )。",[477,479,481,483],{"key":20,"text":478,"correct":26},"以顾客为关注焦点",{"key":24,"text":480,"correct":22},"改进",{"key":28,"text":482,"correct":22},"关系管理",{"key":31,"text":484,"correct":22},"循证决策",{"id":486,"libraryId":5,"type":105,"typeLabel":106,"stem":487,"options":488,"answer":135,"analysis":33},939399,"工程质量管理的三阶段控制法是对质量进行( )",[489,491,493,495,497],{"key":20,"text":490,"correct":26},"事前控制",{"key":24,"text":492,"correct":26},"事中控制",{"key":28,"text":494,"correct":26},"事后控制",{"key":31,"text":496,"correct":22},"全面控制",{"key":118,"text":498,"correct":22},"全过程控制",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},939400,"全面质量管理活动的全部过程，就是质量计划的制订和组织实现的过程，这个过程就是 按照( )周而复始地运转。",[503,505,507,509],{"key":20,"text":504,"correct":26},"计划-实施-检查-处理",{"key":24,"text":506,"correct":22},"实施-计划-检查-处理",{"key":28,"text":508,"correct":22},"计划-检查-实施-处理",{"key":31,"text":510,"correct":22},"计划-实施-处理-检查",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},939401,"施工图经审查合格后，在设计文件交付施工时，设计单位应当对提交的施工图设计文件 向( )做出详细的说明，进行系统的设计技术交底。",[515,517,519,521],{"key":20,"text":516,"correct":26},"施工单位和监理单位",{"key":24,"text":518,"correct":22},"施工单位和建设单位",{"key":28,"text":520,"correct":22},"施工单位和勘察单位",{"key":31,"text":522,"correct":22},"建设单位和监理单位",{"id":524,"libraryId":5,"type":105,"typeLabel":106,"stem":525,"options":526,"answer":537,"analysis":33},939402,"下列工作中，属于咨询工程师(投资)在施工图设计阶段质量管理工作的是( )。",[527,529,531,533,535],{"key":20,"text":528,"correct":26},"组织委托施工图审查工作",{"key":24,"text":530,"correct":22},"组织进行项目概念设计方案比选",{"key":28,"text":532,"correct":26},"限额设计",{"key":31,"text":534,"correct":22},"审查地勘报告",{"key":118,"text":536,"correct":26},"组织施工图设计交底","ACE",{"id":539,"libraryId":5,"type":105,"typeLabel":106,"stem":540,"options":541,"answer":551,"analysis":33},939403,"分部工程质量验收合格的标准有( )。",[542,544,546,548,549],{"key":20,"text":543,"correct":22},"所含检验批的质量均应验收合格",{"key":24,"text":545,"correct":22},"所含检验批的质量验收记录应完整",{"key":28,"text":547,"correct":26},"所含分项工程的质量均应验收合格",{"key":31,"text":316,"correct":26},{"key":118,"text":550,"correct":26},"有关、节能、环境保护和主要使用功能的抽样检验结果应符合相应规定","CDE",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},939404,"( )向建设单位提交工程竣工报告，申请工程竣工验收。",[556,557,558,559],{"key":20,"text":25,"correct":26},{"key":24,"text":102,"correct":22},{"key":28,"text":193,"correct":22},{"key":31,"text":560,"correct":22},"分包单位",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":31,"analysis":33},939405,"与工业产品相比，工程项目质量管理具有更多特点，下列表述错误的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"工程项目形体庞大",{"key":24,"text":568,"correct":22},"工程项目的质量特性较多",{"key":28,"text":570,"correct":22},"工程项目质量影响因素多",{"key":31,"text":572,"correct":26},"工程项目质量具有透明性",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},939406,"每个工程项目都有各自的特点和区别，质量管理工作需要不断地适应新情况，这表明（ ）。",[577,578,579,580],{"key":20,"text":566,"correct":22},{"key":24,"text":570,"correct":22},{"key":28,"text":568,"correct":22},{"key":31,"text":581,"correct":26},"工程项目质量管理难度较大",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},939407,"PDCA 循环管理法中，P 代表的是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"实施行动计划",{"key":24,"text":589,"correct":22},"评估结果检查",{"key":28,"text":591,"correct":22},"质量效益的现值",{"key":31,"text":593,"correct":26},"从问题的定义到行动计划",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":31,"analysis":33},939408,"根据《质量管理体系 基础和术语》，在建立质量管理体系时，应该结合（ ），把质量目标层层分解，使工作目标和质量目标相结合。",[598,600,602,604],{"key":20,"text":599,"correct":22},"质量方针",{"key":24,"text":601,"correct":22},"质量目标",{"key":28,"text":603,"correct":22},"质量计划",{"key":31,"text":605,"correct":26},"项目工作分解结构",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},939409,"建立质量管理体系的基本步骤包括：①确定项目管理的质量方针和质量目标；②持续改进质量管理体系；③结合 WBS 分解质量目标；④制定具体的可操作的质量计划；⑤按照质量计划组织实施；⑥结合项目团队职能分解质量管理职能。正确的顺序是（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":22},"①—②—③—④—⑤—⑥",{"key":24,"text":613,"correct":22},"①—⑥—③—⑤—②—④",{"key":28,"text":615,"correct":26},"①—③—⑥—④—⑤—②",{"key":31,"text":617,"correct":22},"①—⑥—③—④—②—⑤",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":31,"analysis":33},939410,"下列不属于质量计划内容的是（ ）。",[622,624,626,628],{"key":20,"text":623,"correct":22},"明确各层次的质量目标和质量管理职能",{"key":24,"text":625,"correct":22},"明确实现质量目标的过程顺序",{"key":28,"text":627,"correct":22},"确定和提供实现质量目标必需的资源",{"key":31,"text":629,"correct":26},"实现质量目标的进度安排",{"id":631,"libraryId":5,"type":105,"typeLabel":106,"stem":632,"options":633,"answer":642,"analysis":33},939411,"检验批、分项、分部、单位工程施工质量验收合格的共同标准有（ ）。",[634,636,638,639,640],{"key":20,"text":635,"correct":26},"符合工程勘察.设计文件的要求",{"key":24,"text":637,"correct":26},"符合相关专业验收规范的规定",{"key":28,"text":318,"correct":22},{"key":31,"text":316,"correct":22},{"key":118,"text":641,"correct":22},"主控项目均应合格","AB",[644,647,650,653,656,659],{"id":15,"name":645,"category":7,"favorite":646},"领导干部任职前廉政法规知识测试题",92,{"id":648,"name":649,"category":7,"favorite":15},595,"建筑结构与设备",{"id":651,"name":652,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":654,"name":655,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":657,"name":658,"category":7,"favorite":8},534,"BIM工程师",{"id":660,"name":658,"category":7,"favorite":8},535]