[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":656},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,33,50,1948,[13,34,46,58,76,91,103,115,130,142,154,166,174,186,198,210,225,237,249,261,273,288,303,317,329,344,356,366,378,390,402,414,428,442,457,472,487,499,514,528,540,552,562,574,586,600,612,624,636,648],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},939309,1,"单选题","当初步设计深度不够，不能准确地计算工程量，但工程设计采用的技术比较成熟而又有类似工程概算指标可以利用时，可以采用（ ）编制工程概算。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","概算定额法",false,{"key":24,"text":25,"correct":26},"B","概算指标法",true,{"key":28,"text":29,"correct":22},"C","类似工程预算法",{"key":31,"text":32,"correct":22},"D","预算单价法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},939310,"规费的组成不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"养老保险费",{"key":24,"text":41,"correct":22},"工伤保险费",{"key":28,"text":43,"correct":26},"财产保险费",{"key":31,"text":45,"correct":22},"生育保险费",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},939311,"下列不属于建设投资组成部分的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"设备工器具购置费",{"key":24,"text":53,"correct":22},"建筑安装工程费",{"key":28,"text":55,"correct":22},"工程建设其他费用",{"key":31,"text":57,"correct":26},"铺底流动资金",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},939313,2,"多选题","招标工程量清单应以单位(项)工程为单位编制，应由( )组成。",[64,66,68,70,72],{"key":20,"text":65,"correct":26},"分部分项工程量清单",{"key":24,"text":67,"correct":26},"措施项目清单",{"key":28,"text":69,"correct":26},"其他项目清单",{"key":31,"text":71,"correct":26},"规费和税金项目清单",{"key":73,"text":74,"correct":22},"E","单位工程量清单","ABCD",{"id":77,"libraryId":5,"type":60,"typeLabel":61,"stem":78,"options":79,"answer":90,"analysis":33},939314,"招标工程量清单中，其他项目清单内容包括( )。",[80,82,84,86,88],{"key":20,"text":81,"correct":26},"暂列金额",{"key":24,"text":83,"correct":26},"暂估价",{"key":28,"text":85,"correct":26},"计日工",{"key":31,"text":87,"correct":22},"规费和税金",{"key":73,"text":89,"correct":26},"总承包服务费","ABCE",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},939315,"某独立土方工程，招标文件中估计工程量为 100 万 m3，合同中规定：土方工程单价为 10 元\u002Fm3，当实际工程量超过估计工程量 15%时，调整单价，单价调为 9 元\u002Fm3。工程结束时实际完 成土方工程量为 130 万 m3，则土方工程款为( )万元。",[95,97,99,101],{"key":20,"text":96,"correct":22},"1185",{"key":24,"text":98,"correct":22},"1125",{"key":28,"text":100,"correct":26},"1285",{"key":31,"text":102,"correct":22},"1385",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},939316,"根据《建设工程工程量清单计价规范》（GB 50500-2013），在合同履行期间，由于招标工程量清单缺项，新增了分部分项工程量清单项目，关于其合同价款确定的说法，正确的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"新增清单项目的综合单价应由监理工程师提出",{"key":24,"text":110,"correct":26},"新增清单项目应按额外工作处理，承包人可选择做或者不做",{"key":28,"text":112,"correct":22},"新增清单项目的综合单价应由承包人提出，但相关措施项目费不能再做调整",{"key":31,"text":114,"correct":22},"新增清单项目导致新增措施项目的，承包人应将新增措施项目实施方案提交发包人批准",{"id":116,"libraryId":5,"type":60,"typeLabel":61,"stem":117,"options":118,"answer":129,"analysis":33},939317,"下列导致工程项目产生费用偏差的原因中，属于业主原因的有（ ）",[119,121,123,125,127],{"key":20,"text":120,"correct":26},"建设手续不全",{"key":24,"text":122,"correct":22},"物价突然上涨",{"key":28,"text":124,"correct":26},"场地提供不及时",{"key":31,"text":126,"correct":22},"政策发生变化",{"key":73,"text":128,"correct":26},"增加建设内容","ACE",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},939318,"某工程施工到2011 年3 月，已完工作预算费用为6000 万元，计划工作预算费用为5800 万元，已完工作实际费用为6200 万元，则此时的费用绩效指数为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"0.94",{"key":24,"text":137,"correct":26},"0.97",{"key":28,"text":139,"correct":22},"1.03",{"key":31,"text":141,"correct":22},"1.07",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},939319,"挣值法中用于评价费用偏差的指标是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"CV",{"key":24,"text":149,"correct":22},"SV",{"key":28,"text":151,"correct":22},"CPI",{"key":31,"text":153,"correct":22},"SPI",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},939320,"下列关于挣值法评价指标含义的说法，正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"费用偏差为正值，表示项目实际费用高于预算费用",{"key":24,"text":161,"correct":22},"进度偏差为正值，表示项目实际进度落后于计划进度",{"key":28,"text":163,"correct":22},"费用绩效指数小于1，表示项目实际费用低于预算费用",{"key":31,"text":165,"correct":26},"进度绩效指数小于1，表示项目实际进度落后于计划进度",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},939321,"某工程施工到2008 年4 月，已完工作预算费用为6000 万元，计划工作预算费用为5800 万元。已完工作实际费用为6200 万元，则该工程此时的进度绩效指数为（ ）。",[170,171,172,173],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":22},{"key":28,"text":139,"correct":26},{"key":31,"text":141,"correct":22},{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":31,"analysis":33},939322,"某工程施工到2009 年3 月31 日时，得到如下数据：计划工作预算费用为2 800 万元，已完工作预算费用为3 400 万元，已完工作实际费用为3 000 万元。则工程此时的进度偏差为（ ）万元。",[178,180,182,184],{"key":20,"text":179,"correct":22},"-200",{"key":24,"text":181,"correct":22},"200",{"key":28,"text":183,"correct":22},"400",{"key":31,"text":185,"correct":26},"600",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},939323,"如果与费用偏差相联系，工程项目费用控制中的进度偏差是指（ ）之间的差异。",[190,192,194,196],{"key":20,"text":191,"correct":22},"已完工程实际费用与拟完工程计划费用",{"key":24,"text":193,"correct":26},"拟完工程计划费用与已完工程计划费用",{"key":28,"text":195,"correct":22},"已完工程实际时间与拟完工程计划时间",{"key":31,"text":197,"correct":22},"已完工程计划费用与未完工程计划费用",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":28,"analysis":33},939324,"通过对项目费用目标按时间进行分解，在时标网络计划基础上可做项目进度计划的（ ）",[202,204,206,208],{"key":20,"text":203,"correct":22},"直方图",{"key":24,"text":205,"correct":22},"香蕉图",{"key":28,"text":207,"correct":26},"横道图",{"key":31,"text":209,"correct":22},"S曲线",{"id":211,"libraryId":5,"type":60,"typeLabel":61,"stem":212,"options":213,"answer":224,"analysis":33},939325,"编制建设工程项目费用计划时，常用的费用目标分解方式有（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"按投资构成分解",{"key":24,"text":217,"correct":22},"按承包方分解",{"key":28,"text":219,"correct":26},"按项目组成分解",{"key":31,"text":221,"correct":26},"按时间进度分解",{"key":73,"text":223,"correct":22},"按设计方分解","ACD",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},939326,"编制工程项目费用计划时，各项工作都按（ ）安排，有利于节约业主方的贷款利息。",[229,231,233,235],{"key":20,"text":230,"correct":22},"最早开始时期",{"key":24,"text":232,"correct":22},"要求工期",{"key":28,"text":234,"correct":26},"最迟开始时期",{"key":31,"text":236,"correct":22},"计划工期",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},939327,"某施工合同含甲、乙2 个子项工程，估算工程量分别为6000m3 和8000m3，合同工期为12个月，商定合同价甲项为200 元\u002Fm3，乙项为300 元\u002Fm3。合同约定： （1）开发前发包人向承包人支付合同价20%的预付款，在最后2 个月平均扣回。 （2）发包人在承包人每个月的工程款中，按5%的比例扣留质量保证金； （3）根据市场情况，价格调整系数平均按1.1 计算； （4）工程师签发付款最低金额为45 万元。 承包人1～4 月实际完成并经工程师签证确认的工程量分别为： 工程师3 月份实际签发的凭证付款金额为（ ）元",[241,243,245,247],{"key":20,"text":242,"correct":22},"292600",{"key":24,"text":244,"correct":22},"316500",{"key":28,"text":246,"correct":22},"627000",{"key":31,"text":248,"correct":26},"689700",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},939328,"某工程项目的计划工期 17 个月，总预算为 3053150 元，项目开工后第 2 个月末的绩效报告表明：计划工作预算费用为 45672 元，已完工作预算费用为 42932 元，已完工作实际费用为 44721 元，假定费用增加趋势不变，则剩余工作的估计费用为（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"3135655元",{"key":24,"text":256,"correct":22},"3158912元",{"key":28,"text":258,"correct":22},"3171806元",{"key":31,"text":260,"correct":22},"3180365元",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},939329,"某工程项目总费用预算为1000 万元，计划工期为10 个月，第8 个月月末已完工作实际费用为900 万元，若此时预测项目能否按预算完成，还需要（ ）信息。",[265,267,269,271],{"key":20,"text":266,"correct":22},"计划工作预算费用",{"key":24,"text":268,"correct":26},"已完工作预算费用",{"key":28,"text":270,"correct":22},"已使用的准备金",{"key":31,"text":272,"correct":22},"已消耗的资源数量",{"id":274,"libraryId":5,"type":60,"typeLabel":61,"stem":275,"options":276,"answer":287,"analysis":33},939330,"制定工程咨询项目质量计划工作内容包括（ ）。",[277,279,281,283,285],{"key":20,"text":278,"correct":26},"明确项目咨询成果的质量目标和质量标准",{"key":24,"text":280,"correct":26},"明确影响质量的控制节点，制定检查、控制的措施",{"key":28,"text":282,"correct":22},"编制项目质量报告，报上级质检部门和项目经理",{"key":31,"text":284,"correct":26},"层层分析质量目标",{"key":73,"text":286,"correct":22},"发现重大质量问题，及时组织解决并向项目团队负责人报告","ABD",{"id":289,"libraryId":5,"type":60,"typeLabel":61,"stem":290,"options":291,"answer":302,"analysis":33},939331,"根据《工程咨询成果质量评价办法》，进行多方比选情况综合评价时，应主要从（ ）等方面进行评价。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"技术方案比选",{"key":24,"text":295,"correct":22},"节能节水论证",{"key":28,"text":297,"correct":22},"节约土地论证",{"key":31,"text":299,"correct":26},"实施方案比选",{"key":73,"text":301,"correct":22},"职业卫生论证","AD",{"id":304,"libraryId":5,"type":60,"typeLabel":61,"stem":305,"options":306,"answer":287,"analysis":33},939332,"根据《工业项目可行性研究报告质量评价标准》，对市场调查分析情况综合评价的内容有（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"对产品结构符合市场需求的论证情况",{"key":24,"text":310,"correct":26},"营销战略的制订情况",{"key":28,"text":312,"correct":22},"对合理布局的论证情况",{"key":31,"text":314,"correct":26},"预测方法的选用情况",{"key":73,"text":316,"correct":22},"对外部配套条件的论证情况",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},939333,"《工业项目可行性研究报告的质量标准》中，贯彻宏观调控政策情况的综合评价标准不包括对（ ）的论证。",[321,323,325,327],{"key":20,"text":322,"correct":26},"效益估算可靠性",{"key":24,"text":324,"correct":22},"符合布局政策",{"key":28,"text":326,"correct":22},"优化产品结构",{"key":31,"text":328,"correct":22},"符合经济规模",{"id":330,"libraryId":5,"type":60,"typeLabel":61,"stem":331,"options":332,"answer":343,"analysis":33},939334,"根据中国工程咨询协会《工程咨询成果质量评价办法》，对工业项目可行性研究报告进行风险分析情况综合评价时，需要评价的内容有（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"经营风险分析情况",{"key":24,"text":336,"correct":26},"管理风险分析情况",{"key":28,"text":338,"correct":22},"减少风险分析情况",{"key":31,"text":340,"correct":26},"财务、金融风险分析情况",{"key":73,"text":342,"correct":26},"政策风险分析情况","ABDE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},939335,"《工业项目可行性研究报告质量评价标准》中，（ ）属于经济分析情况综合评价。",[348,350,352,354],{"key":20,"text":349,"correct":22},"符合规模经济与否的论证情况",{"key":24,"text":351,"correct":26},"效益估算的可靠性情况",{"key":28,"text":353,"correct":22},"节能、节水论证情况",{"key":31,"text":355,"correct":22},"制定营销战略情况",{"id":357,"libraryId":5,"type":60,"typeLabel":61,"stem":358,"options":359,"answer":343,"analysis":33},939336,"根据中国工程咨询协会对工业项目可行性研究报告进行风险分析情况综合评价时，需要评价的内容有（ ）。",[360,361,362,364,365],{"key":20,"text":334,"correct":26},{"key":24,"text":336,"correct":26},{"key":28,"text":363,"correct":22},"建设风险分析情况",{"key":31,"text":340,"correct":26},{"key":73,"text":342,"correct":26},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},939338,"由工程咨询企业领导组织，邀请社会上的专家参加，由项目经理做汇报的工程咨询成果质量评审属于（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"外部评审",{"key":24,"text":373,"correct":26},"内部评审",{"key":28,"text":375,"correct":22},"第三方评审",{"key":31,"text":377,"correct":22},"社会评审",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},939339,"咨询企业领导组织的内部评审，由（ ）做汇报。",[382,384,386,388],{"key":20,"text":383,"correct":26},"项目经理",{"key":24,"text":385,"correct":22},"企业技术负责人",{"key":28,"text":387,"correct":22},"监理工程师",{"key":31,"text":389,"correct":22},"咨询业务主管",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},939341,"工程项目设计过程质量管理中，设计策划通常以（ ）的形式编制。",[394,396,398,400],{"key":20,"text":395,"correct":22},"项目设计方案",{"key":24,"text":397,"correct":26},"项目设计计划",{"key":28,"text":399,"correct":22},"项目设计图纸",{"key":31,"text":401,"correct":22},"项目设计流程",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},939342,"针对某设计项目建立质量目标，规定质量要求和安排应开展的活动，指的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"设计策划",{"key":24,"text":409,"correct":22},"设计评审",{"key":28,"text":411,"correct":22},"设计控制",{"key":31,"text":413,"correct":22},"设计管理",{"id":415,"libraryId":5,"type":60,"typeLabel":61,"stem":416,"options":417,"answer":287,"analysis":33},939343,"设计管理工作划分为六个阶段，其中设计阶段的工作内容（ ）。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"项目方案设计",{"key":24,"text":421,"correct":26},"项目初步设计",{"key":28,"text":423,"correct":22},"项目竣工验收与竣工图",{"key":31,"text":425,"correct":26},"项目施工图设计",{"key":73,"text":427,"correct":22},"项目后评价",{"id":429,"libraryId":5,"type":60,"typeLabel":61,"stem":430,"options":431,"answer":129,"analysis":33},939344,"下列工作中，属于咨询工程师（投资）在施工图设计阶段质量管理工作的是（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"组织委托施工图审查工作",{"key":24,"text":435,"correct":22},"组织进行项目概念设计方案比选",{"key":28,"text":437,"correct":26},"限额设计",{"key":31,"text":439,"correct":22},"审查地勘报告",{"key":73,"text":441,"correct":26},"组织施工图设计交底",{"id":443,"libraryId":5,"type":60,"typeLabel":61,"stem":444,"options":445,"answer":456,"analysis":33},939345,"分部工程质量验收合格应满足的要求有（ ）。",[446,448,450,452,454],{"key":20,"text":447,"correct":26},"观感质量符合要求",{"key":24,"text":449,"correct":22},"质量控制资料完整",{"key":28,"text":451,"correct":22},"所含分项工程的90%以上质量验收合格",{"key":31,"text":453,"correct":22},"所检验工程具备运行条件",{"key":73,"text":455,"correct":26},"主要使用功能的抽样检验结果符合相应规定","AE",{"id":458,"libraryId":5,"type":60,"typeLabel":61,"stem":459,"options":460,"answer":471,"analysis":33},939346,"分部工程质量验收合格的标准有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"所含检验批的质量均应验收合格",{"key":24,"text":464,"correct":22},"所含检验批的质量验收记录应完整",{"key":28,"text":466,"correct":26},"所含分项工程的质量均应验收合格",{"key":31,"text":468,"correct":26},"观感质量应符合要求",{"key":73,"text":470,"correct":26},"有关安全、节能、环境保护和主要使用功能的抽样检验结果应符合相应规定","CDE",{"id":473,"libraryId":5,"type":60,"typeLabel":61,"stem":474,"options":475,"answer":486,"analysis":33},939347,"根据《建设工程质量管理条例》，建设工程竣工验收应当具备的条件有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"有建设单位签署的工程保修书",{"key":24,"text":479,"correct":22},"完成工程结算备案",{"key":28,"text":481,"correct":26},"有主要建筑材料的进场试验报告",{"key":31,"text":483,"correct":22},"有监理单位和施工单位共同签署的质量合格文件",{"key":73,"text":485,"correct":26},"有勘察单位签署的质量合格文件","CE",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},939348,"某工程竣工验收时发现隐蔽工程检査质重不合格，经査，是由于设计缺陷造成的。下列说法中，正确的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"设计人应负责返修，费用由设计方先行承担",{"key":24,"text":494,"correct":22},"承包人应负责返修，费用由承包人先行承担",{"key":28,"text":496,"correct":26},"承包人应负责返修，费用由发包人先行承担",{"key":31,"text":498,"correct":22},"由设计缺陷造成质箠不合格的，承包人不负责返修",{"id":500,"libraryId":5,"type":60,"typeLabel":61,"stem":501,"options":502,"answer":513,"analysis":33},939349,"在正常条件下，建设工程的最低保修期限，正确的有（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"主体结构工程为50年",{"key":24,"text":506,"correct":26},"供热与供冷系统为2个采暖期、供冷期",{"key":28,"text":508,"correct":22},"屋面防水工程为3年",{"key":31,"text":510,"correct":22},"装修工程为1年",{"key":73,"text":512,"correct":26},"设备安装为2年","BE",{"id":515,"libraryId":5,"type":60,"typeLabel":61,"stem":516,"options":517,"answer":471,"analysis":33},939350,"下列关于试运行质量管理的表述中，正确的有（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"业主方应负责试运行现场的准备工作",{"key":24,"text":521,"correct":22},"承包方负责落实原材料的供应",{"key":28,"text":523,"correct":26},"试运行岗位人员应经过培训并考核合格",{"key":31,"text":525,"correct":26},"试运行一般分阶段进行",{"key":73,"text":527,"correct":26},"试运行工作应由业主方组织进行",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},939351,"下列关于试运行的质量管理的特点，说法正确的是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":26},"试运行是对项目质量的最终检验和试验",{"key":24,"text":535,"correct":22},"试运行是业主方和承包方的交接过程",{"key":28,"text":537,"correct":22},"试运行质量管理的目的是竣工验收",{"key":31,"text":539,"correct":22},"承包方要收集和管理试运行质量记录",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},939352,"组织实施项目试运行工作的是（ ）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"咨询单位",{"key":24,"text":547,"correct":22},"设计单位",{"key":28,"text":549,"correct":22},"施工单位",{"key":31,"text":551,"correct":26},"业主单位",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},939353,"工程项目试运行总结报告由（ ）负责编制。",[556,558,559,560],{"key":20,"text":557,"correct":22},"建设单位",{"key":24,"text":547,"correct":22},{"key":28,"text":549,"correct":26},{"key":31,"text":561,"correct":22},"监理单位",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},939354,"下列不属于工程项目质量管理的特点的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"工程项目质量具有隐蔽性",{"key":24,"text":569,"correct":22},"影响工程项目质量的因素多",{"key":28,"text":571,"correct":22},"工程项目质量管理难度大",{"key":31,"text":573,"correct":26},"工程项目质量特性单一",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":28,"analysis":33},939355,"建立质量管理体系的基本步骤包括：①建立项目管理质量方针和目标；②持续改进质量管理体系；③结合 WBS 分解质量目标；④制定项目质量计划；⑤按照质量计划组织实施；⑥结合项目团队职能分解质量管理职能。正确的顺序是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"①～②～③～④～⑤～⑥",{"key":24,"text":581,"correct":22},"①～⑥～③～⑤～②～④",{"key":28,"text":583,"correct":26},"①～③～⑥～④～⑤～②",{"key":31,"text":585,"correct":22},"①～⑥～③～④～②～⑤",{"id":587,"libraryId":5,"type":60,"typeLabel":61,"stem":588,"options":589,"answer":287,"analysis":33},939356,"工程项目质量管理的基本方法有（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"三阶段控制法",{"key":24,"text":593,"correct":26},"三全控制法",{"key":28,"text":595,"correct":22},"WBS法",{"key":31,"text":597,"correct":26},"PDCA循环管理法",{"key":73,"text":599,"correct":22},"网络图法",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},939357,"工程质量管理的“三全控制”是指（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":26},"全面质量控制、全过程质量控制和全员参与控制",{"key":24,"text":607,"correct":22},"全面质量控制、全方位质量控制、全员参与控制",{"key":28,"text":609,"correct":22},"全面要素质量控制、全方位质量控制、全员参与控制",{"key":31,"text":611,"correct":22},"全面要素质量控制、全过程质量控制、全员参与控制",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":28,"analysis":33},939358,"下列不属于质量计划包括的内容的是（ ）。",[616,618,620,622],{"key":20,"text":617,"correct":22},"明确各层次的质量目标和质量管理职能",{"key":24,"text":619,"correct":22},"明确各层次之问的配合和接口",{"key":28,"text":621,"correct":26},"确定和提供制定质量计划所需的资源",{"key":31,"text":623,"correct":22},"明确记录和报告数据的标准表格",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":31,"analysis":33},939359,"下列不属于质量管理7 项原则的是（ ）。",[628,630,632,634],{"key":20,"text":629,"correct":22},"循证决策",{"key":24,"text":631,"correct":22},"改进",{"key":28,"text":633,"correct":22},"关系管理",{"key":31,"text":635,"correct":26},"方法与手段",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":20,"analysis":33},939360,"工程项目具体质量计划的制订工作不包括（ ）。",[640,642,644,646],{"key":20,"text":641,"correct":26},"确定影响工程项目质量的因素",{"key":24,"text":643,"correct":22},"明确项目团队各层次的质量管理职能",{"key":28,"text":645,"correct":22},"编制收集记录数据的标准表格",{"key":31,"text":647,"correct":22},"明确项目团队各层次间的配合和接口",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":28,"analysis":33},939361,"在领取施工许可证或者开工报告前，应当按照国家有关规定办理工程质量监督手续的主体 是( )。",[652,653,654,655],{"key":20,"text":557,"correct":22},{"key":24,"text":549,"correct":22},{"key":28,"text":561,"correct":26},{"key":31,"text":545,"correct":22},[657,660,663,666,669,672],{"id":15,"name":658,"category":7,"favorite":659},"领导干部任职前廉政法规知识测试题",92,{"id":661,"name":662,"category":7,"favorite":15},595,"建筑结构与设备",{"id":664,"name":665,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":667,"name":668,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":670,"name":671,"category":7,"favorite":8},534,"BIM工程师",{"id":673,"name":671,"category":7,"favorite":8},535]