[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":644},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,31,50,1948,[13,38,53,68,82,94,106,118,133,148,160,172,184,196,208,219,231,243,255,266,278,290,302,314,325,337,349,361,373,383,394,406,418,433,445,457,467,479,491,506,521,534,548,560,574,589,599,607,621,630],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},939209,2,"多选题","采用工程量清单计价，建筑安装工程造价由( )组成。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","分部分项工程费",true,{"key":24,"text":25,"correct":22},"B","措施项目费",{"key":27,"text":28,"correct":22},"C","其他项目费",{"key":30,"text":31,"correct":22},"D","规费和税金",{"key":33,"text":34,"correct":35},"E","单位工程费",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},939210,"措施项目费的计算方法一般有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"综合单价法",{"key":24,"text":45,"correct":22},"参数法计价",{"key":27,"text":47,"correct":35},"工料单价法",{"key":30,"text":49,"correct":22},"分包法计价",{"key":33,"text":51,"correct":35},"清单计价法","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},939211,"编制建设工程项目费用计划时，常用的费用目标分解方式有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"按投资构成分解",{"key":24,"text":60,"correct":35},"按承包方分解",{"key":27,"text":62,"correct":22},"按项目组成分解",{"key":30,"text":64,"correct":22},"按时间进度分解",{"key":33,"text":66,"correct":35},"按设计方分解","ACD",{"id":69,"libraryId":5,"type":70,"typeLabel":71,"stem":72,"options":73,"answer":27,"analysis":37},939212,1,"单选题","编制工程项目费用计划时，各项工作都按( )安排，有利于节约业主方的贷款利息。",[74,76,78,80],{"key":20,"text":75,"correct":35},"最早开始时期",{"key":24,"text":77,"correct":35},"要求工期",{"key":27,"text":79,"correct":22},"最迟开始时期",{"key":30,"text":81,"correct":35},"计划工期",{"id":83,"libraryId":5,"type":70,"typeLabel":71,"stem":84,"options":85,"answer":27,"analysis":37},939213,"某工程约定采用价格指数法调整合同价款，具体约定见表 7-11 数据，本期完成合同价款 为 1000 万元。计算应调整的合同价款差额为( )。 表 7-11 承包人提供材料和工程设备一览表(适用于价格指数调整方法)",[86,88,90,92],{"key":20,"text":87,"correct":35},"115",{"key":24,"text":89,"correct":35},"125",{"key":27,"text":91,"correct":22},"116",{"key":30,"text":93,"correct":35},"126",{"id":95,"libraryId":5,"type":70,"typeLabel":71,"stem":96,"options":97,"answer":20,"analysis":37},939214,"某工程采用的 C20 预拌混凝土由承包人提供，合同约定风险系数 5%，基准单价为 310 元 \u002Fm3，投标单价为 308 元\u002Fm3，在施工期间，采购混凝土时单价为 327 元\u002Fm3。合同约定的材料单 价调整后为( )元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"309.50",{"key":24,"text":101,"correct":35},"319.50",{"key":27,"text":103,"correct":35},"209.50",{"key":30,"text":105,"correct":35},"305.50",{"id":107,"libraryId":5,"type":70,"typeLabel":71,"stem":108,"options":109,"answer":24,"analysis":37},939215,"某工程完工预算为 80000 元，施工至某月月底的投资绩效指数为 0.79。则在该时间节点 下该工程项目预测的完工投资为( )元",[110,112,114,116],{"key":20,"text":111,"correct":35},"104265",{"key":24,"text":113,"correct":22},"101265",{"key":27,"text":115,"correct":35},"101365",{"key":30,"text":117,"correct":35},"102265",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":132,"analysis":37},939216,"下列导致工程项目产生费用偏差的原因中，属于业主原因的有( )。",[122,124,126,128,130],{"key":20,"text":123,"correct":22},"建设手续不全",{"key":24,"text":125,"correct":35},"物价突然上涨",{"key":27,"text":127,"correct":22},"场地提供不及时",{"key":30,"text":129,"correct":35},"图纸提供不及时",{"key":33,"text":131,"correct":22},"增加建设内容","ACE",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":147,"analysis":37},939217,"纠偏的主要对象是( )造成的投资偏差。",[137,139,141,143,145],{"key":20,"text":138,"correct":22},"发包人原因",{"key":24,"text":140,"correct":35},"物价上涨原因",{"key":27,"text":142,"correct":35},"客观原因",{"key":30,"text":144,"correct":35},"施工原因",{"key":33,"text":146,"correct":22},"设计原因","AE",{"id":149,"libraryId":5,"type":70,"typeLabel":71,"stem":150,"options":151,"answer":20,"analysis":37},939218,"在合同价款调整中，不能预见、不可避免、不能克服的客观情况是指（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"不可抗力",{"key":24,"text":155,"correct":35},"暂估价",{"key":27,"text":157,"correct":35},"暂列金额",{"key":30,"text":159,"correct":35},"双方约定的其他调整事项",{"id":161,"libraryId":5,"type":70,"typeLabel":71,"stem":162,"options":163,"answer":27,"analysis":37},939219,"根据《建设工程工程量清单计价规范》（GB 50500－2013），若合同未约定，当工程量清单项目的清单工程量偏差在（ ）以内时，其综合单价不作调整，执行清单原有的综合单价。",[164,166,168,170],{"key":20,"text":165,"correct":35},"5%",{"key":24,"text":167,"correct":35},"10%",{"key":27,"text":169,"correct":22},"15%",{"key":30,"text":171,"correct":35},"20%",{"id":173,"libraryId":5,"type":70,"typeLabel":71,"stem":174,"options":175,"answer":27,"analysis":37},939220,"工程量清单计价是一种主要由（ ）的计价模式。",[176,178,180,182],{"key":20,"text":177,"correct":35},"政府定价",{"key":24,"text":179,"correct":35},"协商定价",{"key":27,"text":181,"correct":22},"市场定价",{"key":30,"text":183,"correct":35},"造价信息机构定价",{"id":185,"libraryId":5,"type":70,"typeLabel":71,"stem":186,"options":187,"answer":27,"analysis":37},939221,"在工程量清单计价模式下，编制投标报价时一般采用（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":35},"施工定额",{"key":24,"text":191,"correct":35},"预算定额",{"key":27,"text":193,"correct":22},"企业定额",{"key":30,"text":195,"correct":35},"消耗量定额",{"id":197,"libraryId":5,"type":70,"typeLabel":71,"stem":198,"options":199,"answer":30,"analysis":37},939222,"下列不属于建设投资款项的是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":35},"建筑工程费",{"key":24,"text":203,"correct":35},"基本预备费",{"key":27,"text":205,"correct":35},"可行性研究费",{"key":30,"text":207,"correct":22},"铺底流动资金",{"id":209,"libraryId":5,"type":70,"typeLabel":71,"stem":210,"options":211,"answer":27,"analysis":37},939223,"某工程项目联合试运转费用应计入（ ）。",[212,214,215,217],{"key":20,"text":213,"correct":35},"安装工程费",{"key":24,"text":201,"correct":35},{"key":27,"text":216,"correct":22},"工程建设其他费",{"key":30,"text":218,"correct":35},"生产准备费",{"id":220,"libraryId":5,"type":70,"typeLabel":71,"stem":221,"options":222,"answer":30,"analysis":37},939224,"某工程采用的预拌混凝土由承包人提供，其基准单价为 330 元\u002Fm3，承包人当初投标价为 335 元\u002Fm3。施工期间，在采购该预拌混凝土时，其单价为 300 元\u002Fm3，该材料单价应调整为（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":35},"313.50",{"key":24,"text":226,"correct":35},"316.50",{"key":27,"text":228,"correct":35},"318.50",{"key":30,"text":230,"correct":22},"321.50",{"id":232,"libraryId":5,"type":70,"typeLabel":71,"stem":233,"options":234,"answer":30,"analysis":37},939225,"根据建筑安装工程费用项目的组成，工具用具使用费属于（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":35},"直接费",{"key":24,"text":238,"correct":35},"措施费",{"key":27,"text":240,"correct":35},"其他费用",{"key":30,"text":242,"correct":22},"企业管理费",{"id":244,"libraryId":5,"type":70,"typeLabel":71,"stem":245,"options":246,"answer":30,"analysis":37},939226,"根据分部分项工程费的计算公式，下列不属于综合单价内涵的是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":35},"人工费",{"key":24,"text":250,"correct":35},"材料费",{"key":27,"text":252,"correct":35},"施工机具使用费",{"key":30,"text":254,"correct":22},"所有范围的风险费用",{"id":256,"libraryId":5,"type":70,"typeLabel":71,"stem":257,"options":258,"answer":20,"analysis":37},939227,"当采用简易计税方法时，建筑业增值税征收率为（ ）。",[259,261,263,264],{"key":20,"text":260,"correct":22},"3%",{"key":24,"text":262,"correct":35},"9%",{"key":27,"text":167,"correct":35},{"key":30,"text":265,"correct":35},"11%",{"id":267,"libraryId":5,"type":70,"typeLabel":71,"stem":268,"options":269,"answer":20,"analysis":37},939228,"下列不属于设计概算编制的依据的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"最终的施工方案",{"key":24,"text":273,"correct":35},"工程勘察与设计文件",{"key":27,"text":275,"correct":35},"工程项目资金筹措方案",{"key":30,"text":277,"correct":35},"工程造价管理机构发布的概算定额",{"id":279,"libraryId":5,"type":70,"typeLabel":71,"stem":280,"options":281,"answer":27,"analysis":37},939229,"当工程项目有多个单项工程时，应采用（ ）级预算编制形式。",[282,284,286,288],{"key":20,"text":283,"correct":35},"一",{"key":24,"text":285,"correct":35},"二",{"key":27,"text":287,"correct":22},"三",{"key":30,"text":289,"correct":35},"四",{"id":291,"libraryId":5,"type":70,"typeLabel":71,"stem":292,"options":293,"answer":24,"analysis":37},939230,"2018 年 6 月，实际完成的某工程基准日期的价格为 2000 万元。价格调整公式中的固定系数为 0.3，对比基准日前的相关成本要素，水泥的价格指数上升了 30%，水泥的费用占合同调值部分的 40%，其它成本要素的价格均未发生变化。则 2017 年 3 月，应调整的合同价的差额为（ ）万元。",[294,296,298,300],{"key":20,"text":295,"correct":35},"84",{"key":24,"text":297,"correct":22},"168",{"key":27,"text":299,"correct":35},"728",{"key":30,"text":301,"correct":35},"1328",{"id":303,"libraryId":5,"type":70,"typeLabel":71,"stem":304,"options":305,"answer":27,"analysis":37},939231,"根据《建设工程工程量清单计价规范》，除另有约定外，当承包人投标报价中材料单价低于基准单价（ ）时，施工期间材料单价涨幅以（ ）为基础，超过合同约定的风险幅度值的，其超过部分按实调整。",[306,308,310,312],{"key":20,"text":307,"correct":35},"5%；投标报价",{"key":24,"text":309,"correct":35},"10%；基准单价",{"key":27,"text":311,"correct":22},"5%；基准单价",{"key":30,"text":313,"correct":35},"10%；投标报价",{"id":315,"libraryId":5,"type":70,"typeLabel":71,"stem":316,"options":317,"answer":20,"analysis":37},939232,"根据《计价规范》的规定，承包人应发包人的要求，采取加快工程进度的措施，使合同工程工期缩短产生的，应由发包人支付的费用，该费用属于（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"提前竣工（赶工）费",{"key":24,"text":321,"correct":35},"施工索赔",{"key":27,"text":323,"correct":35},"误期赔偿费",{"key":30,"text":157,"correct":35},{"id":326,"libraryId":5,"type":70,"typeLabel":71,"stem":327,"options":328,"answer":27,"analysis":37},939233,"某工程主体结构混凝土工程量为 3200m3，预算单价为 550 元\u002Fm3，计划 4 个月内均衡完成。开工后，混凝土实际采购价格为 560 元\u002Fm3。施工至第二个月月底，实际累计完成混凝土工程量为 1800m3，则此时的进度偏差为（ ）万元。",[329,331,333,335],{"key":20,"text":330,"correct":35},"-1.8",{"key":24,"text":332,"correct":35},"9.4",{"key":27,"text":334,"correct":22},"11.0",{"key":30,"text":336,"correct":35},"11.2",{"id":338,"libraryId":5,"type":70,"typeLabel":71,"stem":339,"options":340,"answer":20,"analysis":37},939234,"某工程 10 月份 BCWS 为 50 万元，BCWP 为 45 万元，ACWP 为 48 万元，该工程 10 月底施工成本偏差和进度偏差分别是（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"成本超支 3 万元，进度拖延 5 万元",{"key":24,"text":344,"correct":35},"成本超支 3 万元，进度拖延 3 万元",{"key":27,"text":346,"correct":35},"成本节约 2 万元，进度提前 5 万元",{"key":30,"text":348,"correct":35},"成本节约 2 万元，进度提前 3 万元",{"id":350,"libraryId":5,"type":70,"typeLabel":71,"stem":351,"options":352,"answer":24,"analysis":37},939235,"某施工企业进行土方开挖工程，按合同约定 3 月份的计划工作量为 2400m3，计划单价是 12 元\u002Fm3；到月底检查时，工程师确认承包商完成的工程量为 2000m3，实际单价为 15 元\u002Fm3。则该工程的进度偏差（SV）和进度绩效指数（SPI）分别为（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":35},"-4800 元；0.67",{"key":24,"text":356,"correct":22},"-4800 元；0.83",{"key":27,"text":358,"correct":35},"-6000 元；0.80",{"key":30,"text":360,"correct":35},"-12000 元；0.83",{"id":362,"libraryId":5,"type":70,"typeLabel":71,"stem":363,"options":364,"answer":20,"analysis":37},939236,"根据《建设工程工程量清单计价规范》，下列关于项目特征不符引起合同价款调整的表述，错误的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"项目特征是构成清单项目价值的本质特征，单价的高低与其联系不大",{"key":24,"text":368,"correct":35},"发包人在招标工程量清单中对项目特征的描述，应被认为是准确的和全面的",{"key":27,"text":370,"correct":35},"当项目特征变化后，发承包双方应按实际施工的项目特征重新确定综合单价",{"key":30,"text":372,"correct":35},"承包人应按照发包人提供的招标工程量清单，根据其项目特征描述的内容及有关要求实施合同工程，直到项目被改变为止",{"id":374,"libraryId":5,"type":70,"typeLabel":71,"stem":375,"options":376,"answer":30,"analysis":37},939237,"暂估材料或工程设备的单价确定后，在综合单价中只应取代原暂估单价。则下列不属于暂估单价内涵的是（ ）。",[377,378,379,381],{"key":20,"text":250,"correct":35},{"key":24,"text":242,"correct":35},{"key":27,"text":380,"correct":35},"利润",{"key":30,"text":382,"correct":22},"规费",{"id":384,"libraryId":5,"type":70,"typeLabel":71,"stem":385,"options":386,"answer":20,"analysis":37},939238,"暂列金额是指（ ）在工程量清单中暂定并包括在合同价款中的一笔款项，施工过程中由（ ）掌握使用、扣除合同价款调整后如有余额，归（ ）。",[387,389,391,392],{"key":20,"text":388,"correct":22},"招标人.发包人.发包人",{"key":24,"text":390,"correct":35},"招标人.监理人.发包人",{"key":27,"text":390,"correct":35},{"key":30,"text":393,"correct":35},"招标人.监理人.监理人",{"id":395,"libraryId":5,"type":70,"typeLabel":71,"stem":396,"options":397,"answer":20,"analysis":37},939239,"在编制招标控制价时，计日工中的材料价格应按（ ）计算。",[398,400,402,404],{"key":20,"text":399,"correct":22},"工程造价管理机构发布的单价",{"key":24,"text":401,"correct":35},"清单中列出的单价",{"key":27,"text":403,"correct":35},"市场调查确定的单价",{"key":30,"text":405,"correct":35},"清单中列出的金额",{"id":407,"libraryId":5,"type":70,"typeLabel":71,"stem":408,"options":409,"answer":30,"analysis":37},939240,"时间－投资累计曲线（S 形曲线），当所有工作都按最迟开始时间开始，那么对（ ）有利。",[410,412,414,416],{"key":20,"text":411,"correct":35},"保证质量",{"key":24,"text":413,"correct":35},"加快进度",{"key":27,"text":415,"correct":35},"安全管理",{"key":30,"text":417,"correct":22},"节约贷款利息",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":432,"analysis":37},939241,"下列产生投资偏差的原因中，属于客观原因的有（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":35},"利率变化",{"key":24,"text":425,"correct":35},"协调不佳",{"key":27,"text":427,"correct":22},"基础处理",{"key":30,"text":429,"correct":22},"自然因素",{"key":33,"text":431,"correct":22},"社会原因","CDE",{"id":434,"libraryId":5,"type":70,"typeLabel":71,"stem":435,"options":436,"answer":24,"analysis":37},939242,"有关质量保证金的说法，不正确的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":35},"监理人应从第一个付款周期开始扣留",{"key":24,"text":440,"correct":22},"计算额度包括预付款的支付、扣回",{"key":27,"text":442,"correct":35},"期限为缺陷责任期满",{"key":30,"text":444,"correct":35},"承包人没有完成缺陷责任的，发包人有权扣留相应金额",{"id":446,"libraryId":5,"type":70,"typeLabel":71,"stem":447,"options":448,"answer":20,"analysis":37},939243,"某施工机械预算价为100万元，折旧年限为10年，年平均工作200个台班，残值率为5%，则该机械台班折旧费为（ ）元。",[449,451,453,455],{"key":20,"text":450,"correct":22},"475",{"key":24,"text":452,"correct":35},"463",{"key":27,"text":454,"correct":35},"273",{"key":30,"text":456,"correct":35},"345",{"id":458,"libraryId":5,"type":70,"typeLabel":71,"stem":459,"options":460,"answer":24,"analysis":37},939244,"纳税人所在地在县城、镇的，城市维护建设税税率税率为（ ）。",[461,463,464,465],{"key":20,"text":462,"correct":35},"7%",{"key":24,"text":165,"correct":22},{"key":27,"text":260,"correct":35},{"key":30,"text":466,"correct":35},"1%",{"id":468,"libraryId":5,"type":70,"typeLabel":71,"stem":469,"options":470,"answer":20,"analysis":37},939245,"按费用构成要素计算，规费中的社会保险费和住房公积金应以（ ）为计算基础，根据工程所在地省、自治区、直辖市或行业建设主管部门规定费率计算。",[471,473,475,477],{"key":20,"text":472,"correct":22},"定额人工费",{"key":24,"text":474,"correct":35},"定额人工费和机械费合计",{"key":27,"text":476,"correct":35},"定额人工费、材料费和机械费合计",{"key":30,"text":478,"correct":35},"定额人工费和材料费合计",{"id":480,"libraryId":5,"type":70,"typeLabel":71,"stem":481,"options":482,"answer":20,"analysis":37},939246,"设计概算编制依据的审查不包括（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"定额指标的审查",{"key":24,"text":486,"correct":35},"合法性审查",{"key":27,"text":488,"correct":35},"时效性审查",{"key":30,"text":490,"correct":35},"适用范围审查",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":505,"analysis":37},939247,"措施项目清单中的（ ）应按照国家或省级、行业建设主管部门的规定计价，不得作为竞争性费用。",[495,497,499,501,503],{"key":20,"text":496,"correct":22},"环境保护费",{"key":24,"text":498,"correct":22},"文明施工费",{"key":27,"text":500,"correct":35},"夜间施工增加费",{"key":30,"text":502,"correct":35},"脚手架工程费",{"key":33,"text":504,"correct":22},"临时设施费","ABE",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":520,"analysis":37},939248,"措施项目费的计算方法中的参数法计价适用于的措施项目包括（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":35},"混凝土模板",{"key":24,"text":513,"correct":22},"夜间施工费",{"key":27,"text":515,"correct":22},"二次搬运费",{"key":30,"text":517,"correct":22},"冬雨期施工",{"key":33,"text":519,"correct":35},"脚手架施工","BCD",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":533,"analysis":37},939249,"建设投资可分为静态投资部分和动态投资部分，动态投资包括（ ）。",[525,527,529,530,531],{"key":20,"text":526,"correct":22},"价差预备费",{"key":24,"text":528,"correct":22},"建设期利息",{"key":27,"text":203,"correct":35},{"key":30,"text":216,"correct":35},{"key":33,"text":532,"correct":35},"设备及工器具购置费","AB",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":547,"analysis":37},939250,"工程建设其他费用中，与项目建设有关的费用主要有（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":22},"建设管理费",{"key":24,"text":541,"correct":22},"勘察设计费",{"key":27,"text":543,"correct":22},"研究试验费",{"key":30,"text":545,"correct":35},"联合试运转费",{"key":33,"text":218,"correct":35},"ABC",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":132,"analysis":37},939251,"下列产生工程项目投资偏差的原因中，属于业主原因的有（ ）。",[552,553,555,557,559],{"key":20,"text":123,"correct":22},{"key":24,"text":554,"correct":35},"施工方案不当",{"key":27,"text":556,"correct":22},"组织不落实",{"key":30,"text":558,"correct":35},"设计错误",{"key":33,"text":425,"correct":22},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":547,"analysis":37},939252,"下列费用中，属于人工费的有（ ）。",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"劳动竞赛奖",{"key":24,"text":567,"correct":22},"高温作业临时津贴",{"key":27,"text":569,"correct":22},"加班加点工资",{"key":30,"text":571,"correct":35},"管理人员的津贴补贴",{"key":33,"text":573,"correct":35},"职工退职金",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":588,"analysis":37},939253,"下列建筑安装工程费用中，属于措施费的有（ ）。",[578,580,582,584,586],{"key":20,"text":579,"correct":35},"零星工程费",{"key":24,"text":581,"correct":22},"冬雨季施工增加费",{"key":27,"text":583,"correct":22},"特殊地区施工增加费",{"key":30,"text":585,"correct":35},"城市轨道交通工程费",{"key":33,"text":587,"correct":22},"大型机械设备进出场及安拆费","BCE",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":547,"analysis":37},939254,"建筑安装工程费按照工程造价形成划分，分部分项工程费的综合单价包括（ ）。",[593,594,595,596,597],{"key":20,"text":248,"correct":22},{"key":24,"text":242,"correct":22},{"key":27,"text":380,"correct":22},{"key":30,"text":382,"correct":35},{"key":33,"text":598,"correct":35},"税金",{"id":600,"libraryId":5,"type":70,"typeLabel":71,"stem":601,"options":602,"answer":24,"analysis":37},939255,"企业为施工生产筹集资金或提供预付款担保、履约担保、职工工资支付担保等所发生的各种费用计入（ ）。",[603,604,605,606],{"key":20,"text":248,"correct":35},{"key":24,"text":242,"correct":22},{"key":27,"text":598,"correct":35},{"key":30,"text":382,"correct":35},{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":432,"analysis":37},939256,"工程项目设备、工器具购置费由（ ）组成。",[611,613,615,617,619],{"key":20,"text":612,"correct":35},"设备安装费",{"key":24,"text":614,"correct":35},"设备试运转费",{"key":27,"text":616,"correct":22},"设备原价",{"key":30,"text":618,"correct":22},"工器具原价",{"key":33,"text":620,"correct":22},"运杂费",{"id":622,"libraryId":5,"type":70,"typeLabel":71,"stem":623,"options":624,"answer":30,"analysis":37},939257,"工程费用不包括（ ）。",[625,626,627,628],{"key":20,"text":532,"correct":35},{"key":24,"text":201,"correct":35},{"key":27,"text":213,"correct":35},{"key":30,"text":629,"correct":22},"土地使用费",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":52,"analysis":37},939258,"“筛选法“的特点有（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"审查速度快",{"key":24,"text":637,"correct":22},"简单易懂，便于掌握",{"key":27,"text":639,"correct":35},"突出重点",{"key":30,"text":641,"correct":22},"便于发现问题",{"key":33,"text":643,"correct":35},"易定案",[645,648,651,654,657,660],{"id":70,"name":646,"category":7,"favorite":647},"领导干部任职前廉政法规知识测试题",92,{"id":649,"name":650,"category":7,"favorite":70},595,"建筑结构与设备",{"id":652,"name":653,"category":7,"favorite":70},715,"招标采购专业知识与法律法规",{"id":655,"name":656,"category":7,"favorite":70},848,"市政方向-通用基础",{"id":658,"name":659,"category":7,"favorite":8},534,"BIM工程师",{"id":661,"name":659,"category":7,"favorite":8},535]