[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":627},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,30,50,1948,[13,34,46,58,76,90,105,120,135,149,164,176,187,199,213,225,236,248,260,271,283,295,307,322,337,348,357,366,378,386,400,410,421,435,449,464,473,482,495,507,521,530,542,554,562,570,582,591,603,615],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},939157,1,"单选题","已知某建设工程网络计划中 A 工作的自由时差为 5 天，总时差为 7 天。监理工程师在检查施工进度时发现只有该工作实际进度拖延，且影响总工期 3 天，则该工作实际进度比计划进度拖延（）天。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","3",false,{"key":24,"text":25,"correct":22},"B","5",{"key":27,"text":28,"correct":22},"C","8",{"key":30,"text":31,"correct":32},"D","10",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},939158,"某工程网络计划中，工作 M 的自由时差为 2 天，总时差为 5 天。实施进度检查时发现该工作的持续时间延长了 4 天，则工作 M 的实际进度（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"不影响总工期，但将其紧后工作的最早开始时间推迟 2 天",{"key":24,"text":41,"correct":22},"既不影响总工程，也不影响其后续工作的正常进行",{"key":27,"text":43,"correct":22},"将使总工期延长 4 天，但不影响其后续工作的正常进行",{"key":30,"text":45,"correct":22},"将其后续工作的开始时间推迟 4 天，并使总工期延长 1 天",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},939159,"工程项目进度控制的结果不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工作绩效信息",{"key":24,"text":53,"correct":32},"工作清单更新",{"key":27,"text":55,"correct":22},"项目管理计划更新",{"key":30,"text":57,"correct":22},"项目文件更新",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},939160,2,"多选题","在工程项目进度管理中，工作定义依据中的项目范围说明书包括（ ）。",[64,66,68,70,72],{"key":20,"text":65,"correct":32},"项目交付成果",{"key":24,"text":67,"correct":22},"工作编码",{"key":27,"text":69,"correct":32},"限制性条件",{"key":30,"text":71,"correct":32},"假设",{"key":73,"text":74,"correct":22},"E","组织文化和结构","ACD",{"id":77,"libraryId":5,"type":60,"typeLabel":61,"stem":78,"options":79,"answer":75,"analysis":33},939161,"工作定义的成果有（ ）。",[80,82,84,86,88],{"key":20,"text":81,"correct":32},"工作清单",{"key":24,"text":83,"correct":22},"进度计划",{"key":27,"text":85,"correct":32},"修正的工作分解结构",{"key":30,"text":87,"correct":32},"里程碑清单",{"key":73,"text":89,"correct":22},"工作顺序",{"id":91,"libraryId":5,"type":60,"typeLabel":61,"stem":92,"options":93,"answer":104,"analysis":33},939162,"某双代号网络计划如下图所示，图中存在的绘图错误有（ ）。",[94,96,98,100,102],{"key":20,"text":95,"correct":22},"多个终点节点",{"key":24,"text":97,"correct":32},"节点编号重复",{"key":27,"text":99,"correct":32},"两项工作有相同的节点编号",{"key":30,"text":101,"correct":22},"循环回路",{"key":73,"text":103,"correct":22},"多个起点节点","BC",{"id":106,"libraryId":5,"type":60,"typeLabel":61,"stem":107,"options":108,"answer":119,"analysis":33},939164,"建筑安装工程直接费用中，措施费用主要包括（ ）。",[109,111,113,115,117],{"key":20,"text":110,"correct":32},"安全文明施工费",{"key":24,"text":112,"correct":32},"已完工程及设备保护费",{"key":27,"text":114,"correct":32},"二次搬运费",{"key":30,"text":116,"correct":22},"工程排污费",{"key":73,"text":118,"correct":22},"劳动保险费","ABC",{"id":121,"libraryId":5,"type":60,"typeLabel":61,"stem":122,"options":123,"answer":134,"analysis":33},939165,"工程项目总投资中的工程建设其他费用不包括（ ）",[124,126,128,130,132],{"key":20,"text":125,"correct":32},"工器具购置费",{"key":24,"text":127,"correct":22},"工程保险费",{"key":27,"text":129,"correct":22},"可行性研究费",{"key":30,"text":131,"correct":32},"价差预备费",{"key":73,"text":133,"correct":22},"联合试运转费","AD",{"id":136,"libraryId":5,"type":60,"typeLabel":61,"stem":137,"options":138,"answer":148,"analysis":33},939166,"工程建设其他费用中，与未来企业生产经营有关的费用主要有（ ）。",[139,141,143,145,146],{"key":20,"text":140,"correct":22},"建设管理费",{"key":24,"text":142,"correct":22},"勘察设计费",{"key":27,"text":144,"correct":22},"研究试验费",{"key":30,"text":133,"correct":32},{"key":73,"text":147,"correct":32},"生产准备费","DE",{"id":150,"libraryId":5,"type":60,"typeLabel":61,"stem":151,"options":152,"answer":163,"analysis":33},939167,"建设投资由（ ）等组成。",[153,155,157,159,161],{"key":20,"text":154,"correct":22},"铺底流动资金",{"key":24,"text":156,"correct":32},"设备工器具购置费",{"key":27,"text":158,"correct":32},"建筑安装工程费",{"key":30,"text":160,"correct":32},"工程建设其他费用",{"key":73,"text":162,"correct":32},"预备费","BCDE",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},939168,"工作项目铺底流动资金，一般按照流动资金的（ ）计算。",[168,170,172,174],{"key":20,"text":169,"correct":22},"10%",{"key":24,"text":171,"correct":22},"20%",{"key":27,"text":173,"correct":32},"30%",{"key":30,"text":175,"correct":22},"40%",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},939170,"某工程项目室外管道铺设所花的费用应计入（ ）组成。",[180,182,184,186],{"key":20,"text":181,"correct":22},"基本预备费",{"key":24,"text":183,"correct":32},"建筑工程费",{"key":27,"text":185,"correct":22},"安装工程费",{"key":30,"text":147,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":27,"analysis":33},939171,"下列施工企业支出中，属于建筑安装工程费用组成中人工费的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"生产工人劳动服购置费",{"key":24,"text":194,"correct":22},"塔吊操作工的工资",{"key":27,"text":196,"correct":32},"钢筋工的高温作业津贴",{"key":30,"text":198,"correct":22},"职工调动工作路费",{"id":200,"libraryId":5,"type":60,"typeLabel":61,"stem":201,"options":202,"answer":104,"analysis":33},939172,"下列施工企业支出费用中，不属于建筑安装工程费中企业管理费的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"对混凝土试块进行强度检验所发生的费用",{"key":24,"text":206,"correct":32},"到外地购买钢材所发生的差旅费用",{"key":27,"text":208,"correct":32},"工人按规定定期休假所支付的工资费用",{"key":30,"text":210,"correct":22},"为职工报销探亲路费所发生的费用",{"key":73,"text":212,"correct":22},"按规定缴纳印花税所支付的费用",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},939173,"建筑安装工程费用的税金是指国家税法规定应计入建筑安装工程造价内的（ ）",[217,219,221,223],{"key":20,"text":218,"correct":32},"增值税销项税额",{"key":24,"text":220,"correct":22},"营业税",{"key":27,"text":222,"correct":22},"教育费附加",{"key":30,"text":224,"correct":22},"城市维护建设税",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},939174,"计算建筑安装工程费用中增值税销项税额时，通常采用的税率为（ ）。",[229,231,233,234],{"key":20,"text":230,"correct":22},"7%",{"key":24,"text":232,"correct":32},"9%",{"key":27,"text":169,"correct":22},{"key":30,"text":235,"correct":22},"13%",{"id":237,"libraryId":5,"type":60,"typeLabel":61,"stem":238,"options":239,"answer":134,"analysis":33},939175,"下列费用中，属于建筑安装工程费用中规费的有（ ）。",[240,242,244,245,247],{"key":20,"text":241,"correct":32},"社会保险费",{"key":24,"text":243,"correct":22},"职工教育经费",{"key":27,"text":222,"correct":22},{"key":30,"text":246,"correct":32},"住房公积金",{"key":73,"text":116,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":30,"analysis":33},939176,"安全文明施工费不包括（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"环境保护费",{"key":24,"text":255,"correct":22},"临时设施费",{"key":27,"text":257,"correct":22},"安全设施费",{"key":30,"text":259,"correct":32},"冬雨季施工增加费",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":30,"analysis":33},939177,"环境保护费、文明施工费、安全施工费、临时设施费合并称为（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"环境文明施工费",{"key":24,"text":267,"correct":22},"环保安全施工费",{"key":27,"text":269,"correct":22},"环保、安全文明施工费",{"key":30,"text":110,"correct":32},{"id":272,"libraryId":5,"type":60,"typeLabel":61,"stem":273,"options":274,"answer":282,"analysis":33},939178,"下列费用中，属于工程建设其他费的有（ ）。",[275,276,278,279,281],{"key":20,"text":129,"correct":32},{"key":24,"text":277,"correct":32},"土地使用费和其他补偿费",{"key":27,"text":142,"correct":32},{"key":30,"text":280,"correct":22},"资金筹措费",{"key":73,"text":147,"correct":32},"ABCE",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},939179,"我国目前实行的工程量清单计价采用的综合单价是部分费用综合单价，清单项目单价中不包括（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":32},"规费和税金",{"key":24,"text":290,"correct":22},"企业管理费、规费",{"key":27,"text":292,"correct":22},"规费、利润和税金",{"key":30,"text":294,"correct":22},"企业管理费、规费、利润和税金",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},939180,"采用定额单价法编制施工图预算的主要步骤包括：①准备材料并熟悉施工图纸，②编制工料分析表，③计算工程量，④套用定额单价，计算人、料、机费用，⑤计算其他费用，⑥复核。正确的顺序是（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"①-②-③-④-⑤-⑥",{"key":24,"text":302,"correct":32},"①-③-④-②-⑤-⑥",{"key":27,"text":304,"correct":22},"①-③-②-⑤-④-⑥",{"key":30,"text":306,"correct":22},"①-②-③-⑤-④-⑥",{"id":308,"libraryId":5,"type":60,"typeLabel":61,"stem":309,"options":310,"answer":321,"analysis":33},939181,"建设工程项目总概算的组成内容主要有（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":32},"单项工程综合概算",{"key":24,"text":314,"correct":32},"工程建设其他费用概算",{"key":27,"text":316,"correct":32},"资金筹措费、预备费概算",{"key":30,"text":318,"correct":32},"经营性项目铺底流动资金概算",{"key":73,"text":320,"correct":22},"经营期利息概算","ABCD",{"id":323,"libraryId":5,"type":60,"typeLabel":61,"stem":324,"options":325,"answer":336,"analysis":33},939182,"设备安装工程概算编制方法主要有（ ）。",[326,328,330,332,334],{"key":20,"text":327,"correct":32},"预算单价法",{"key":24,"text":329,"correct":22},"定额指标法",{"key":27,"text":331,"correct":32},"扩大单价法",{"key":30,"text":333,"correct":22},"工程量清单法",{"key":73,"text":335,"correct":32},"概算指标法","ACE",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},939183,"安装预算单价及扩大综合单价不全时，编制设备安装工程概算可采用（ ）。",[341,342,344,346],{"key":20,"text":335,"correct":32},{"key":24,"text":343,"correct":22},"实物法",{"key":27,"text":345,"correct":22},"估算指标法",{"key":30,"text":347,"correct":22},"费用分解法",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},939184,"当初步设计有详细的设备清单时，编制设备安装工程概算宜采用（ ）。",[352,353,354,356],{"key":20,"text":335,"correct":22},{"key":24,"text":327,"correct":32},{"key":27,"text":355,"correct":22},"实物指标法",{"key":30,"text":331,"correct":22},{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},939185,"由于设计深度不够等原因，对投资较小、比较简单的工程项目，多采用（ ）编制单位工程概算。",[361,362,364,365],{"key":20,"text":335,"correct":32},{"key":24,"text":363,"correct":22},"生产能力指数法",{"key":27,"text":343,"correct":22},{"key":30,"text":331,"correct":22},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},939186,"设计概算的编制依据不包括（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"工程项目资金筹措方案",{"key":24,"text":373,"correct":32},"设计合同",{"key":27,"text":375,"correct":22},"工程勘察与设计文件",{"key":30,"text":377,"correct":22},"施工组织设计和施工方案",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":30,"analysis":33},939187,"当初步设计达到一定深度，建筑结构比较明确时，可采用（ ）编制建筑工程概算。",[382,383,384,385],{"key":20,"text":335,"correct":22},{"key":24,"text":327,"correct":22},{"key":27,"text":343,"correct":22},{"key":30,"text":331,"correct":32},{"id":387,"libraryId":5,"type":60,"typeLabel":61,"stem":388,"options":389,"answer":399,"analysis":33},939188,"建设投资可分为静态投资部分和动态投资部分，动态投资包括( )。",[390,392,394,395,397],{"key":20,"text":391,"correct":32},"涨价预备费",{"key":24,"text":393,"correct":32},"建设期利息",{"key":27,"text":181,"correct":22},{"key":30,"text":396,"correct":22},"工程建设其他费",{"key":73,"text":398,"correct":22},"设备及工器具购置费","AB",{"id":401,"libraryId":5,"type":60,"typeLabel":61,"stem":402,"options":403,"answer":119,"analysis":33},939189,"工程造价是指工程项目在建设期预计或实际支出的建设费用，包括( )。",[404,406,407,408,409],{"key":20,"text":405,"correct":32},"工程费用",{"key":24,"text":160,"correct":32},{"key":27,"text":162,"correct":32},{"key":30,"text":280,"correct":22},{"key":73,"text":154,"correct":22},{"id":411,"libraryId":5,"type":60,"typeLabel":61,"stem":412,"options":413,"answer":420,"analysis":33},939190,"下列施工企业支出中，属于建筑安装工程费用组成中人工费的是( )。",[414,415,416,417,418],{"key":20,"text":192,"correct":22},{"key":24,"text":194,"correct":22},{"key":27,"text":196,"correct":32},{"key":30,"text":198,"correct":22},{"key":73,"text":419,"correct":32},"物价补贴","CE",{"id":422,"libraryId":5,"type":60,"typeLabel":61,"stem":423,"options":424,"answer":321,"analysis":33},939191,"以下施工企业支付的各项费用中，属于材料费的有( )。",[425,427,429,431,433],{"key":20,"text":426,"correct":32},"材料原价",{"key":24,"text":428,"correct":32},"运杂费",{"key":27,"text":430,"correct":32},"运输损耗费",{"key":30,"text":432,"correct":32},"采购费、仓储费、工地保管费、仓储损耗",{"key":73,"text":434,"correct":22},"折旧费",{"id":436,"libraryId":5,"type":60,"typeLabel":61,"stem":437,"options":438,"answer":321,"analysis":33},939192,"以下费用中，属于施工机械使用费的有( )。",[439,441,443,445,447],{"key":20,"text":440,"correct":32},"机上司机的人工费",{"key":24,"text":442,"correct":32},"施工机械应缴纳的车船使用税",{"key":27,"text":444,"correct":32},"大修理费",{"key":30,"text":446,"correct":32},"经常修理费",{"key":73,"text":448,"correct":22},"大型机械在现场进行安装与拆卸所需的费用",{"id":450,"libraryId":5,"type":60,"typeLabel":61,"stem":451,"options":452,"answer":463,"analysis":33},939193,"下列施工企业支出费用中，属于建筑安装工程费中企业管理费的有( )。",[453,455,457,459,461],{"key":20,"text":454,"correct":32},"管理人员工资",{"key":24,"text":456,"correct":22},"工伤保险费",{"key":27,"text":458,"correct":32},"固定资产的折旧费",{"key":30,"text":460,"correct":32},"职业资格认定培训费",{"key":73,"text":462,"correct":32},"施工管理用车辆的保险费","ACDE",{"id":465,"libraryId":5,"type":60,"typeLabel":61,"stem":466,"options":467,"answer":134,"analysis":33},939194,"下列费用中，属于建筑安装工程费用中规费的有( )。",[468,469,470,471,472],{"key":20,"text":241,"correct":32},{"key":24,"text":243,"correct":22},{"key":27,"text":222,"correct":22},{"key":30,"text":246,"correct":32},{"key":73,"text":116,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":30,"analysis":33},939195,"文明施工费不包括( )。",[477,478,479,481],{"key":20,"text":253,"correct":22},{"key":24,"text":255,"correct":22},{"key":27,"text":480,"correct":22},"设施费",{"key":30,"text":259,"correct":32},{"id":483,"libraryId":5,"type":60,"typeLabel":61,"stem":484,"options":485,"answer":119,"analysis":33},939196,"下列费用中，属于措施项目费的有( )。",[486,488,489,491,493],{"key":20,"text":487,"correct":32},"文明施工费",{"key":24,"text":114,"correct":32},{"key":27,"text":490,"correct":32},"大型机械设备进出场及安拆费",{"key":30,"text":492,"correct":22},"暂列金额",{"key":73,"text":494,"correct":22},"总承包服务费",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":30,"analysis":33},939197,"增值税的计税方法，包括一般计税方法和简易计税方法。关于两者的表述错误的是( )。",[499,501,503,505],{"key":20,"text":500,"correct":22},"一般计税方法税前造价各费用项目均以不含税价格计算",{"key":24,"text":502,"correct":22},"简易计税方法税前造价各费用项目均以含税价格计算",{"key":27,"text":504,"correct":22},"当采用一般计税方法时，建筑业增值税税率为 9%",{"key":30,"text":506,"correct":32},"当采用简易计税方法时，建筑业增值税税率为 3%",{"id":508,"libraryId":5,"type":60,"typeLabel":61,"stem":509,"options":510,"answer":399,"analysis":33},939198,"分部分项工程费=∑(分部分项工程量×综合单价)，其中综合单价不包括( )。",[511,513,515,517,519],{"key":20,"text":512,"correct":32},"税金",{"key":24,"text":514,"correct":32},"规费",{"key":27,"text":516,"correct":22},"企业管理费",{"key":30,"text":518,"correct":22},"利润",{"key":73,"text":520,"correct":22},"一定范围的风险费用",{"id":522,"libraryId":5,"type":60,"typeLabel":61,"stem":523,"options":524,"answer":321,"analysis":33},939199,"不得作为竞争性费用的有( )。",[525,526,527,528,529],{"key":20,"text":512,"correct":32},{"key":24,"text":514,"correct":32},{"key":27,"text":253,"correct":32},{"key":30,"text":487,"correct":32},{"key":73,"text":520,"correct":22},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":30,"analysis":33},939200,"设计概算审查的方法不包括( )。",[534,536,538,540],{"key":20,"text":535,"correct":22},"对比分析法",{"key":24,"text":537,"correct":22},"查询核实法",{"key":27,"text":539,"correct":22},"联合会审法",{"key":30,"text":541,"correct":32},"全面审查法",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":27,"analysis":33},939201,"采用定额单价法编制施工图预算，计算人、料、机费用时( )。",[546,548,550,552],{"key":20,"text":547,"correct":22},"分项工程与定额单价完全一致时，直接套用定额单价",{"key":24,"text":549,"correct":22},"分项工程的主要材料品种与定额单价不一致时，按实际价格换算定额单价",{"key":27,"text":551,"correct":32},"分项工程施工工艺条件与定额单价不一致时，一般调价不换量",{"key":30,"text":553,"correct":22},"分项工程不能直接套用定额、不能换算和调整时，应编制补充定额单价",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},939202,"采用定额单价法编制施工图预算的主要步骤包括：①准备材料并熟悉施工图纸，②编制 工料分析表，③计算工程量，④套用定额单价，计算人、料、机费用，⑤计算其他费用，⑥复核。 正确的顺序是( )。",[558,559,560,561],{"key":20,"text":300,"correct":22},{"key":24,"text":302,"correct":32},{"key":27,"text":304,"correct":22},{"key":30,"text":306,"correct":22},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},939203,"我国目前实行的工程量清单计价采用的综合单价是部分费用综合单价，清单项目单价中 不包括( )。",[566,567,568,569],{"key":20,"text":288,"correct":32},{"key":24,"text":290,"correct":22},{"key":27,"text":292,"correct":22},{"key":30,"text":294,"correct":22},{"id":571,"libraryId":5,"type":60,"typeLabel":61,"stem":572,"options":573,"answer":321,"analysis":33},939204,"施工图预算审查的方法包括( )。",[574,575,577,579,581],{"key":20,"text":541,"correct":32},{"key":24,"text":576,"correct":32},"标准预算审查法",{"key":27,"text":578,"correct":32},"分组计算审查法",{"key":30,"text":580,"correct":32},"分解对比审查法",{"key":73,"text":539,"correct":22},{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},939205,"施工图预算审查，工程量较小、工艺比较简单的工程适合采用( )。",[586,587,589,590],{"key":20,"text":578,"correct":22},{"key":24,"text":588,"correct":22},"筛选审查法",{"key":27,"text":541,"correct":32},{"key":30,"text":576,"correct":22},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":27,"analysis":33},939206,"财政部对施工图预算评审，要求项目预算应由项目( )提供。",[595,597,599,601],{"key":20,"text":596,"correct":22},"省级建设主管部门",{"key":24,"text":598,"correct":22},"承建单位",{"key":27,"text":600,"correct":32},"建设单位",{"key":30,"text":602,"correct":22},"预算编制单位",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":20,"analysis":33},939207,"《计价规范》规定，分部分项工程量清单应采用( )计价。",[607,609,611,613],{"key":20,"text":608,"correct":32},"综合单价",{"key":24,"text":610,"correct":22},"全费用综合单价",{"key":27,"text":612,"correct":22},"工料单价",{"key":30,"text":614,"correct":22},"部分费用综合单价",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":20,"analysis":33},939208,"采用工程量清单计价，单位工程造价计算公式为( )。",[619,621,623,625],{"key":20,"text":620,"correct":32},"单位工程造价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"key":24,"text":622,"correct":22},"单位工程造价=分部分项工程费+措施项目费+其他项目费+规费",{"key":27,"text":624,"correct":22},"单位工程造价=分部分项工程费+措施项目费+其他项目费",{"key":30,"text":626,"correct":22},"单位工程造价=分部分项工程费+措施项目费",[628,631,634,637,640,643],{"id":15,"name":629,"category":7,"favorite":630},"领导干部任职前廉政法规知识测试题",92,{"id":632,"name":633,"category":7,"favorite":15},595,"建筑结构与设备",{"id":635,"name":636,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":638,"name":639,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":641,"name":642,"category":7,"favorite":8},534,"BIM工程师",{"id":644,"name":642,"category":7,"favorite":8},535]