[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":711},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,3,50,1948,[13,34,46,58,70,82,94,106,118,130,148,163,178,193,208,223,238,253,268,281,295,310,325,339,353,367,381,396,410,424,439,453,467,481,494,508,520,535,549,563,578,592,606,620,634,648,659,668,683,697],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},937771,1,"单选题","（2010年真题）关于工程项目职能式组织结构的说法是，错误的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","职能式组织结构可以在部门工作与项目任务的平衡中调整人员安排",false,{"key":24,"text":25,"correct":22},"B","职能式组织结构导致项目管理工作往往没有真正的权威性",{"key":27,"text":28,"correct":29},"C","职能式组织结构不利于公司项目发展与管理的连续性",true,{"key":31,"text":32,"correct":22},"D","职能式组织结构不利于不同职能部门的成员之间交流","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},937772,"（2017年真题）下列各种工程项目组织结构的优点中，属于项目式组织结构优点的是( )",[38,40,42,44],{"key":20,"text":39,"correct":22},"有利于公司项目的发展与管理的连续性",{"key":24,"text":41,"correct":22},"有利于项目专业技术问题的解决",{"key":27,"text":43,"correct":22},"有利于提高资源利用率",{"key":31,"text":45,"correct":29},"有利于项目团队内部沟通",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},937773,"（2011年真题）项目式组织结构存在的缺点是( )。",[50,52,54,56],{"key":20,"text":51,"correct":29},"项目较多时易出现资源浪费问题",{"key":24,"text":53,"correct":22},"管理没有正式的权威性",{"key":27,"text":55,"correct":22},"项目成本进度不易控制",{"key":31,"text":57,"correct":22},"信息回路比较复杂",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},937774,"（2010年真题）区别不同矩阵式项目组织结构形式的主要依据是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目团队成员之间的沟通方式",{"key":24,"text":65,"correct":29},"项目经理对项目的约束程度",{"key":27,"text":67,"correct":22},"项目团队的工作效率和反应速度",{"key":31,"text":69,"correct":22},"职能部门负责人与项目经理的权力分配",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},937775,"（2011年真题）关于复合式组织结构的说法，错误的是( )",[74,76,78,80],{"key":20,"text":75,"correct":22},"复合式组织结构不受承担项目的公司现有模式限制",{"key":24,"text":77,"correct":29},"复合式组织结构信息流不容易产生障碍",{"key":27,"text":79,"correct":22},"复合式组织结构是指公司可能有两种以上项目组织结构形式",{"key":31,"text":81,"correct":22},"复合式组织结构是指项目可能有两种以上组织结构形式",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},937776,"（2016年真题）下列关于减小管理幅度对组织的影响错误的是( )",[86,88,90,92],{"key":20,"text":87,"correct":22},"加大了相互之间的工作协调难度",{"key":24,"text":89,"correct":22},"信息的传递容易失真",{"key":27,"text":91,"correct":22},"可能会降低办事效率",{"key":31,"text":93,"correct":29},"提高工作效率",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},937777,"（2016年真题）下列不属于项目界面的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"组织界面",{"key":24,"text":101,"correct":22},"技术界面",{"key":27,"text":103,"correct":22},"人际关系界面",{"key":31,"text":105,"correct":29},"工作界面",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},937778,"（2013年真题）团队的工作开始进入有序化状态是在团队发展经过( )之后。",[110,112,114,116],{"key":20,"text":111,"correct":22},"休整阶段",{"key":24,"text":113,"correct":22},"规范阶段",{"key":27,"text":115,"correct":29},"磨合阶段",{"key":31,"text":117,"correct":22},"表现阶段",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},937779,"（2012年真题）在编制工程项目技术建议书时就确定了项目团队的部分人员，这种吸纳人员的方式称为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"内部招聘",{"key":24,"text":125,"correct":22},"外部招聘",{"key":27,"text":127,"correct":22},"商谈",{"key":31,"text":129,"correct":29},"预安排",{"id":131,"libraryId":5,"type":132,"typeLabel":133,"stem":134,"options":135,"answer":147,"analysis":33},937780,2,"多选题","（2011年真题）关于编制项目工作计划的说法，正确的有（ ）。",[136,138,140,142,144],{"key":20,"text":137,"correct":29},"组织编制项目工作计划是项目经理的重要工作",{"key":24,"text":139,"correct":29},"项目工作计划是开展项目工作的规定性文件",{"key":27,"text":141,"correct":22},"项目工作计划的编制不受委托方影响",{"key":31,"text":143,"correct":22},"项目工作计划又称为项目工作大纲（TOR）",{"key":145,"text":146,"correct":29},"E","项目工作计划应包括项目工作进度计划","ABE",{"id":149,"libraryId":5,"type":132,"typeLabel":133,"stem":150,"options":151,"answer":162,"analysis":33},937781,"（2016年真题）可吸纳人力资源情况在进行项目人力资源安排时，必须考虑的潜在的可能得到的人力资源特点有（ ）。",[152,154,156,158,160],{"key":20,"text":153,"correct":29},"以前的经验",{"key":24,"text":155,"correct":29},"可得到的程度",{"key":27,"text":157,"correct":29},"个人特点",{"key":31,"text":159,"correct":29},"个人兴趣",{"key":145,"text":161,"correct":22},"来源分析","ABCD",{"id":164,"libraryId":5,"type":132,"typeLabel":133,"stem":165,"options":166,"answer":177,"analysis":33},937782,"（2011年真题）制约项目组织计划制订的主要因素包括（ ）。",[167,169,171,173,175],{"key":20,"text":168,"correct":29},"项目的组织结构",{"key":24,"text":170,"correct":22},"项目的融资方案",{"key":27,"text":172,"correct":29},"项目管理层的偏好",{"key":31,"text":174,"correct":29},"项目人员的预先安排",{"key":145,"text":176,"correct":22},"项目的质量标准","ACD",{"id":179,"libraryId":5,"type":132,"typeLabel":133,"stem":180,"options":181,"answer":192,"analysis":33},937783,"（2014年真题）项目经理召开项目启动会议，会议内容主要有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":29},"公布工作程序和规则",{"key":24,"text":185,"correct":29},"介绍项目基本情况",{"key":27,"text":187,"correct":22},"对团队成员工作以具体指导",{"key":31,"text":189,"correct":22},"讨论项目的质量计划",{"key":145,"text":191,"correct":22},"讨论项目费用计划","AB",{"id":194,"libraryId":5,"type":132,"typeLabel":133,"stem":195,"options":196,"answer":207,"analysis":33},937784,"（2014年真题）关于项目团队表现阶段状态的表述，正确的有（ ）。",[197,199,201,203,205],{"key":20,"text":198,"correct":22},"团队工作开始进入有序状态",{"key":24,"text":200,"correct":29},"团队工作效率有较大提高",{"key":27,"text":202,"correct":29},"团队成员彼此高度信任",{"key":31,"text":204,"correct":22},"开始形成团队文化",{"key":145,"text":206,"correct":22},"成员分工再适当优化后即可稳定","BC",{"id":209,"libraryId":5,"type":132,"typeLabel":133,"stem":210,"options":211,"answer":222,"analysis":33},937785,"（2011年真题）项目经理对项目相关人员进行分析，可以有效地( )。",[212,214,216,218,220],{"key":20,"text":213,"correct":29},"开展协调工作",{"key":24,"text":215,"correct":29},"识别和确定与项目相关的关键人员",{"key":27,"text":217,"correct":22},"进行项目结构分解",{"key":31,"text":219,"correct":29},"选定项目团队成员",{"key":145,"text":221,"correct":22},"制订项目管理制度","ABD",{"id":224,"libraryId":5,"type":132,"typeLabel":133,"stem":225,"options":226,"answer":237,"analysis":33},937786,"（2013年真题）构成项目团队的基本条件主要有( )。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"团队成员有各自独立的目标",{"key":24,"text":230,"correct":22},"团队有独立的活动经费",{"key":27,"text":232,"correct":29},"团队内部有职责分工",{"key":31,"text":234,"correct":29},"团队内部有工作程序",{"key":145,"text":236,"correct":29},"团队成员有共同目标","CDE",{"id":239,"libraryId":5,"type":132,"typeLabel":133,"stem":240,"options":241,"answer":252,"analysis":33},937787,"（2006年真题）下列关于工程项目经理的表述，正确的有( )",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"项目经理可以是项目承担单位的法定代表人",{"key":24,"text":245,"correct":29},"项目经理可以是项目承担单位的法定代表人的代理人",{"key":27,"text":247,"correct":29},"项目经理是项目的直接领导与组织者",{"key":31,"text":249,"correct":22},"项目经理只负责沟通、传递指令",{"key":145,"text":251,"correct":29},"项目经理可以是公司以外的人","BCE",{"id":254,"libraryId":5,"type":132,"typeLabel":133,"stem":255,"options":256,"answer":267,"analysis":33},937788,"（2009年真题）项目经理在建立工作基础阶段的工作包括( )。",[257,259,261,263,265],{"key":20,"text":258,"correct":29},"编制项目工作计划",{"key":24,"text":260,"correct":29},"分析项目相关人员",{"key":27,"text":262,"correct":22},"组织制订具体实施计划",{"key":31,"text":264,"correct":29},"了解项目情况",{"key":145,"text":266,"correct":29},"研究工作任务","ABDE",{"id":269,"libraryId":5,"type":132,"typeLabel":133,"stem":270,"options":271,"answer":252,"analysis":33},937789,"（2005年真题）正式启动项目时，项目经理的主要工作包括( )。",[272,274,276,278,279],{"key":20,"text":273,"correct":22},"编制项目工作大纲",{"key":24,"text":275,"correct":29},"组建项目团队",{"key":27,"text":277,"correct":29},"召开项目启动会议",{"key":31,"text":260,"correct":22},{"key":145,"text":280,"correct":29},"组织制订团队各项具体计划",{"id":282,"libraryId":5,"type":132,"typeLabel":133,"stem":283,"options":284,"answer":294,"analysis":33},937790,"（2005年真题）项目团队正式开展工作以后，项目经理管理团队工作必须( )",[285,286,288,290,292],{"key":20,"text":273,"correct":22},{"key":24,"text":287,"correct":29},"对项目全过程进行全面控制",{"key":27,"text":289,"correct":29},"协调相关关系",{"key":31,"text":291,"correct":29},"对团队成员工作进行指导",{"key":145,"text":293,"correct":22},"关心团队成员未来去向","BCD",{"id":296,"libraryId":5,"type":132,"typeLabel":133,"stem":297,"options":298,"answer":309,"analysis":33},937791,"（2004年真题）项目经理在整个项目执行当中的主要工作包括( )。",[299,301,303,305,307],{"key":20,"text":300,"correct":29},"建立工作基础",{"key":24,"text":302,"correct":29},"正式启动项目",{"key":27,"text":304,"correct":29},"管理团队工作",{"key":31,"text":306,"correct":22},"积极拓展并承接各类项目",{"key":145,"text":308,"correct":29},"项目结束阶段的工作","ABCE",{"id":311,"libraryId":5,"type":132,"typeLabel":133,"stem":312,"options":313,"answer":324,"analysis":33},937792,"（2005年真题）项目团队能力开发的途径与手段包括( )",[314,316,318,320,322],{"key":20,"text":315,"correct":29},"改善环境",{"key":24,"text":317,"correct":22},"人员来源分析",{"key":27,"text":319,"correct":29},"开展团队建设性活动",{"key":31,"text":321,"correct":29},"外部反馈",{"key":145,"text":323,"correct":29},"培训","ACDE",{"id":326,"libraryId":5,"type":132,"typeLabel":133,"stem":327,"options":328,"answer":309,"analysis":33},937793,"（2010年真题）影响项目组织的社会因素有( )。",[329,331,333,335,337],{"key":20,"text":330,"correct":29},"项目管理的范围",{"key":24,"text":332,"correct":29},"国家经济管理环境",{"key":27,"text":334,"correct":29},"项目的经济合同关系与形式",{"key":31,"text":336,"correct":22},"组织领导及成员的素质",{"key":145,"text":338,"correct":29},"国际通行的项目管理方法与惯例",{"id":340,"libraryId":5,"type":132,"typeLabel":133,"stem":341,"options":342,"answer":252,"analysis":33},937794,"（2009年真题）工程项目人力资源配备计划的内容包括( )",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"人员报酬需求",{"key":24,"text":346,"correct":29},"人员参加项目工作时间",{"key":27,"text":348,"correct":29},"人员需求数量与种类",{"key":31,"text":350,"correct":22},"人员的奖惩",{"key":145,"text":352,"correct":29},"人员离开项目工作的时间",{"id":354,"libraryId":5,"type":132,"typeLabel":133,"stem":355,"options":356,"answer":177,"analysis":33},937795,"（2009年真题） 工程项目组织管理中常用的部门划分方法有( )划分法。",[357,359,361,363,365],{"key":20,"text":358,"correct":29},"程序",{"key":24,"text":360,"correct":22},"规模",{"key":27,"text":362,"correct":29},"职能",{"key":31,"text":364,"correct":29},"区域",{"key":145,"text":366,"correct":22},"序列",{"id":368,"libraryId":5,"type":132,"typeLabel":133,"stem":369,"options":370,"answer":294,"analysis":33},937796,"（2013年真题）关于部门划分方法中职能划分法的说法，正确的有( )",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"职能划分法有利于工程项目多目标管理",{"key":24,"text":374,"correct":29},"职能划分法有利于提高组织的专业化程度",{"key":27,"text":376,"correct":29},"职能划分法有利于提高管理人员的技术水平",{"key":31,"text":378,"correct":29},"职能划分法不利于高级项目管理人员的培养",{"key":145,"text":380,"correct":22},"职能划分法有利于培养专业人员的综合能力",{"id":382,"libraryId":5,"type":132,"typeLabel":133,"stem":383,"options":384,"answer":395,"analysis":33},937797,"（2014年真题）从工程项目的主要工作程序考虑，可以在项目管理公司设置的部门有( )。",[385,387,389,391,393],{"key":20,"text":386,"correct":29},"市场开发部",{"key":24,"text":388,"correct":29},"项目设计部",{"key":27,"text":390,"correct":29},"施工管理部",{"key":31,"text":392,"correct":22},"基础设施部",{"key":145,"text":394,"correct":22},"欧洲项目部","ABC",{"id":397,"libraryId":5,"type":132,"typeLabel":133,"stem":398,"options":399,"answer":395,"analysis":33},937798,"（2017年真题）职务特征模型(JCM)中，决定工作职务意义重要程度的维度有( )。",[400,402,404,406,408],{"key":20,"text":401,"correct":29},"职务要求员工运用各种技术和才能从事多种不同活动的程度",{"key":24,"text":403,"correct":29},"职务要求完成一项完整的和具有同一性的任务的程度",{"key":27,"text":405,"correct":29},"职务要求完成一项具有重要意义任务的程度",{"key":31,"text":407,"correct":22},"职务给予任职者在安排工作进度和使用方法上的自主程度",{"key":145,"text":409,"correct":22},"任职者从事活动获得的有关其绩效信息和直接和清晰程度",{"id":411,"libraryId":5,"type":132,"typeLabel":133,"stem":412,"options":413,"answer":324,"analysis":33},937799,"（2008年真题）根据职务特征模型，任何职务都可以从多方面描述，主要包括( )。",[414,416,418,420,422],{"key":20,"text":415,"correct":29},"职务的自主性",{"key":24,"text":417,"correct":22},"任务的简单性",{"key":27,"text":419,"correct":29},"技能的多样性",{"key":31,"text":421,"correct":29},"任务的同一性",{"key":145,"text":423,"correct":29},"任务的重要性",{"id":425,"libraryId":5,"type":132,"typeLabel":133,"stem":426,"options":427,"answer":438,"analysis":33},937800,"（2013年真题）根据职务特征模型，决定工作职务重要程度的特征有( )。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"信息反馈性",{"key":24,"text":431,"correct":29},"技能多样性",{"key":27,"text":433,"correct":22},"决策自主性",{"key":31,"text":435,"correct":29},"任务同一性",{"key":145,"text":437,"correct":29},"任务重要性","BDE",{"id":440,"libraryId":5,"type":132,"typeLabel":133,"stem":441,"options":442,"answer":267,"analysis":33},937801,"（2017年真题）进行工程项目管理组织设计应考虑的主要因素有( )。",[443,445,447,449,451],{"key":20,"text":444,"correct":29},"项目规模、工作内容、工作性质",{"key":24,"text":446,"correct":29},"项目任务单位的管理水平",{"key":27,"text":448,"correct":22},"社会公众的教育程度",{"key":31,"text":450,"correct":29},"项目的信息资源、人力资源等情况",{"key":145,"text":452,"correct":29},"国家法律法规要求",{"id":454,"libraryId":5,"type":132,"typeLabel":133,"stem":455,"options":456,"answer":324,"analysis":33},937802,"（2012年真题）工程项目管理组织设计的依据主要有( )。",[457,459,461,463,465],{"key":20,"text":458,"correct":29},"有关法律法规",{"key":24,"text":460,"correct":22},"项目招标方式",{"key":27,"text":462,"correct":29},"项目建设工期",{"key":31,"text":464,"correct":29},"项目业主的要求",{"key":145,"text":466,"correct":29},"项目规模",{"id":468,"libraryId":5,"type":132,"typeLabel":133,"stem":469,"options":470,"answer":162,"analysis":33},937803,"（2008年真题）传统组织设计的原则主要包括( )。",[471,473,475,477,479],{"key":20,"text":472,"correct":29},"目标原则",{"key":24,"text":474,"correct":29},"协调原则",{"key":27,"text":476,"correct":29},"专业化原则",{"key":31,"text":478,"correct":29},"明确性原则",{"key":145,"text":480,"correct":22},"弹性设计原则",{"id":482,"libraryId":5,"type":132,"typeLabel":133,"stem":483,"options":484,"answer":493,"analysis":33},937804,"（2013年真题）项目式组织结构的缺点主要有( )。",[485,486,488,489,491],{"key":20,"text":57,"correct":22},{"key":24,"text":487,"correct":22},"项目管理层次较为复杂",{"key":27,"text":55,"correct":22},{"key":31,"text":490,"correct":29},"同时有多个项目时容易出现资源浪费",{"key":145,"text":492,"correct":29},"项目结束时团队成员可能为去向担忧","DE",{"id":495,"libraryId":5,"type":132,"typeLabel":133,"stem":496,"options":497,"answer":192,"analysis":33},937805,"（2005年真题）矩阵式组织结构的优点有( )。",[498,500,502,504,506],{"key":20,"text":499,"correct":29},"团队的工作目标与任务比较明确",{"key":24,"text":501,"correct":29},"团队成员无后顾之忧",{"key":27,"text":503,"correct":22},"项目管理权力不需要平衡",{"key":31,"text":505,"correct":22},"信息回路比较简单",{"key":145,"text":507,"correct":22},"不易产生多头领导的问题",{"id":509,"libraryId":5,"type":132,"typeLabel":133,"stem":510,"options":511,"answer":162,"analysis":33},937806,"（2016年真题）下列关于矩阵组织形式的说法，正确的是( )。",[512,513,515,517,518],{"key":20,"text":57,"correct":29},{"key":24,"text":514,"correct":29},"项目成员处于多头领导状态",{"key":27,"text":516,"correct":29},"在一定程度上避免资源的囤积于浪费",{"key":31,"text":501,"correct":29},{"key":145,"text":519,"correct":22},"项目团队成员在项目后期没有归属感",{"id":521,"libraryId":5,"type":132,"typeLabel":133,"stem":522,"options":523,"answer":534,"analysis":33},937807,"（2013年真题）关于矩阵式组织结构优点的说法，错误的是( )。",[524,526,528,530,532],{"key":20,"text":525,"correct":22},"团队工作目标明确",{"key":24,"text":527,"correct":29},"项目管理权力平衡容易",{"key":27,"text":529,"correct":22},"部门资源利用率高",{"key":31,"text":531,"correct":22},"项目团队成员一般无去向担忧",{"key":145,"text":533,"correct":29},"信息回路简单，沟通效率高","BE",{"id":536,"libraryId":5,"type":132,"typeLabel":133,"stem":537,"options":538,"answer":207,"analysis":33},937808,"（2012年真题）全职人员在项目团队中占 50%～60%的项目组织模式可能是( BC )。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"项目式",{"key":24,"text":542,"correct":29},"平衡矩阵式",{"key":27,"text":544,"correct":29},"强矩阵式",{"key":31,"text":546,"correct":22},"弱矩阵式",{"key":145,"text":548,"correct":22},"职能式",{"id":550,"libraryId":5,"type":132,"typeLabel":133,"stem":551,"options":552,"answer":237,"analysis":33},937809,"（2011年真题）需要设置专职项目经理的组织模式有( )。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"职能式模式",{"key":24,"text":556,"correct":22},"弱矩阵式模式",{"key":27,"text":558,"correct":29},"平衡矩阵式模式",{"key":31,"text":560,"correct":29},"强矩阵式模式",{"key":145,"text":562,"correct":29},"项目式模式",{"id":564,"libraryId":5,"type":132,"typeLabel":133,"stem":565,"options":566,"answer":577,"analysis":33},937810,"（2012年真题）项目经理在项目实施中应承担的指导工作主要有( )。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"落实人员分工",{"key":24,"text":570,"correct":29},"进行方法指导",{"key":27,"text":572,"correct":29},"培养团队精神",{"key":31,"text":574,"correct":29},"对成员提出具体要求",{"key":145,"text":576,"correct":29},"解决团队工作中的问题","BCDE",{"id":579,"libraryId":5,"type":132,"typeLabel":133,"stem":580,"options":581,"answer":309,"analysis":33},937811,"（2004年真题）对团队成员进行有效的控制是项目经理对项目进行全过程控制的关键，重点包括( )。",[582,584,586,588,590],{"key":20,"text":583,"correct":29},"进行适度的授权",{"key":24,"text":585,"correct":29},"进行必要的调整",{"key":27,"text":587,"correct":29},"进行经常性的检查",{"key":31,"text":589,"correct":22},"做好对外关系的协调",{"key":145,"text":591,"correct":29},"建立和保持有效、畅通的信息通道",{"id":593,"libraryId":5,"type":132,"typeLabel":133,"stem":594,"options":595,"answer":162,"analysis":33},937812,"（2016年真题）项目经理要做好内外关系的协调，主要包括( )",[596,598,600,602,604],{"key":20,"text":597,"correct":29},"与委托方或顾客及时有效的沟通",{"key":24,"text":599,"correct":29},"与项目所在单位的有关领导保持信息的畅通",{"key":27,"text":601,"correct":29},"与项目所在单位的职能部门保持适当的互动关系",{"key":31,"text":603,"correct":29},"在团队内部形成统一、有序、高效的工作氛围",{"key":145,"text":605,"correct":22},"项目成果总结与报送",{"id":607,"libraryId":5,"type":132,"typeLabel":133,"stem":608,"options":609,"answer":395,"analysis":33},937813,"（2016年真题）评价是指对员工的工作业绩、工作态度、工作能力等方面进行检查和评定，可采取( )方式进行",[610,612,614,616,618],{"key":20,"text":611,"correct":29},"指标考核",{"key":24,"text":613,"correct":29},"团队评议",{"key":27,"text":615,"correct":29},"自我评价",{"key":31,"text":617,"correct":22},"客户评价",{"key":145,"text":619,"correct":22},"领导考核",{"id":621,"libraryId":5,"type":132,"typeLabel":133,"stem":622,"options":623,"answer":577,"analysis":33},937814,"（2016年真题）项目雇员考核的作用包括( )",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"及时发现问题",{"key":24,"text":627,"correct":29},"有利于加强成员的团队意识",{"key":27,"text":629,"correct":29},"时刻提醒成员要完成的任务",{"key":31,"text":631,"correct":29},"调动成员积极性",{"key":145,"text":633,"correct":29},"提高成员工作效率",{"id":635,"libraryId":5,"type":132,"typeLabel":133,"stem":636,"options":637,"answer":577,"analysis":33},937815,"（2010年真题）良好的项目管理组织有利于( )。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"确定项目需要完成的工作内容",{"key":24,"text":641,"correct":29},"提高项目团队的工作效率",{"key":27,"text":643,"correct":29},"分解和完成项目目标",{"key":31,"text":645,"correct":29},"项目组织的稳定和平衡",{"key":145,"text":647,"correct":29},"协调项目内外关系",{"id":649,"libraryId":5,"type":132,"typeLabel":133,"stem":650,"options":651,"answer":294,"analysis":33},937816,"（2012年真题）项目组织计划制定与执行中重点关注的项目界面主要有( )。",[652,654,655,656,657],{"key":20,"text":653,"correct":22},"信息界面",{"key":24,"text":101,"correct":29},{"key":27,"text":99,"correct":29},{"key":31,"text":103,"correct":29},{"key":145,"text":658,"correct":22},"资金界面",{"id":660,"libraryId":5,"type":132,"typeLabel":133,"stem":661,"options":662,"answer":177,"analysis":33},937817,"（2011年真题）制约项目组织计划制订的主要因素包括( )。",[663,664,665,666,667],{"key":20,"text":168,"correct":29},{"key":24,"text":170,"correct":22},{"key":27,"text":172,"correct":29},{"key":31,"text":174,"correct":29},{"key":145,"text":176,"correct":22},{"id":669,"libraryId":5,"type":132,"typeLabel":133,"stem":670,"options":671,"answer":682,"analysis":33},937818,"（2014年真题）减少管理幅度对项目组织产生的影响主要有( )。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"减少管理层次",{"key":24,"text":675,"correct":22},"减少用于协调的时间和费用",{"key":27,"text":677,"correct":29},"信息传递中易发生信息丢失",{"key":31,"text":679,"correct":29},"降低办事效率",{"key":145,"text":681,"correct":22},"减少对下属的监督时间","CD",{"id":684,"libraryId":5,"type":132,"typeLabel":133,"stem":685,"options":686,"answer":309,"analysis":33},937819,"（2017年真题）确定项目组织内管理幅度应考虑的主要因素有( )。",[687,689,691,693,695],{"key":20,"text":688,"correct":29},"管理者的工作性质",{"key":24,"text":690,"correct":29},"层次内信息传递效率",{"key":27,"text":692,"correct":29},"组织机构在空间上的分散程度",{"key":31,"text":694,"correct":22},"任务的重要程度",{"key":145,"text":696,"correct":29},"经营形式和发展阶段",{"id":698,"libraryId":5,"type":132,"typeLabel":133,"stem":699,"options":700,"answer":710,"analysis":33},937820,"（2013年真题）当工程项目管理者的有效控制幅度超过其能力时，需要( )。",[701,703,704,706,708],{"key":20,"text":702,"correct":22},"增加管理幅度",{"key":24,"text":673,"correct":22},{"key":27,"text":705,"correct":29},"增加管理层次",{"key":31,"text":707,"correct":22},"减少上级部门",{"key":145,"text":709,"correct":29},"减少管理幅度","CE",[712,715,718,721,724,727],{"id":15,"name":713,"category":7,"favorite":714},"领导干部任职前廉政法规知识测试题",92,{"id":716,"name":717,"category":7,"favorite":15},595,"建筑结构与设备",{"id":719,"name":720,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":722,"name":723,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":725,"name":726,"category":7,"favorite":8},534,"BIM工程师",{"id":728,"name":726,"category":7,"favorite":8},535]