[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":642},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,29,50,1948,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,233,251,266,281,296,311,323,334,346,360,375,387,399,410,424,435,449,461,473,485,499,511,523,535,543,554,562,577,591,606,620,634],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},939107,1,"单选题","某项目采用三时估算法估算工作时间，乐观时间、最可能时间和最保守时间，分别是 10 天、16 天、21 天，则此活动的期望时间是（ ）天。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","15",false,{"key":24,"text":25,"correct":26},"B","16",true,{"key":28,"text":29,"correct":22},"C","17",{"key":31,"text":32,"correct":22},"D","18","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},939108,"先将所有节点按其最早时间定位在时标网络计划表中的相应位置，然后再用规定线型（实箭线和虚箭线）按比例绘出工作和虚工作是（ ）的绘制步骤。",[38,40,42,44],{"key":20,"text":39,"correct":22},"直接绘制法",{"key":24,"text":41,"correct":26},"间接绘制法",{"key":28,"text":43,"correct":22},"规定型绘图法",{"key":31,"text":45,"correct":22},"非规定型绘图法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},939109,"下列关于双代号时标网络图的表述，错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"能标明计划的时间过程和关键线路",{"key":24,"text":53,"correct":22},"时标网络计划宜按各工作的最早开始时间绘制",{"key":28,"text":55,"correct":22},"实箭线的水平投影长度表示该工作的持续时间",{"key":31,"text":57,"correct":26},"工作箭线中波形线的水平投影长度表示其总时差",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},939110,"时标网络图宜按各项工作的（ ）时间编制。",[62,64,66,68],{"key":20,"text":63,"correct":26},"最早开始",{"key":24,"text":65,"correct":22},"最迟开始",{"key":28,"text":67,"correct":22},"最早结束",{"key":31,"text":69,"correct":22},"最迟结束",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},939111,"资源需求分析中，在工程项目（ ）阶段，需要咨询工程师牵头，组织各专业技术人员对工程项目进行全面、系统的分析，为决策者提供决策的依据。",[74,76,78,80],{"key":20,"text":75,"correct":26},"前期",{"key":24,"text":77,"correct":22},"准备",{"key":28,"text":79,"correct":22},"实施",{"key":31,"text":81,"correct":22},"试生产",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},939112,"工程项目进度管理工作包括：①工作定义；②工作顺序安排；③工作进度控制；④工作进度计划制定；⑤工作时间估算。正确的顺序是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"①—②—③—④—⑤",{"key":24,"text":89,"correct":26},"①—②—⑤—④—③",{"key":28,"text":91,"correct":22},"①—③—②—⑤—④",{"key":31,"text":93,"correct":22},"①—⑤—②—③—④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},939113,"项目日历中规定了可以开展进度活动的（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"工作日和工作班次",{"key":24,"text":101,"correct":22},"工作地点和工作班次",{"key":28,"text":103,"correct":22},"工作日和工作强度",{"key":31,"text":105,"correct":22},"工作地点和工作强度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},939114,"工期优化一般通过压缩（ ）的持续时间来进行。",[110,112,114,116],{"key":20,"text":111,"correct":22},"有充足备用资源的非关键工作",{"key":24,"text":113,"correct":22},"缩短持续时间对安全影响大的关键工作",{"key":28,"text":115,"correct":26},"缩短持续时间增加费用最少的关键工作",{"key":31,"text":117,"correct":22},"缩短持续时间对质量影响不大的非关键工作",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},939115,"如果网络计划中某项工作进度拖延的时间超过其（ ），则无论该工作是否为关键工作，其实际进度都将对后续工作的总工期产生影响",[122,124,126,128],{"key":20,"text":123,"correct":26},"总时差",{"key":24,"text":125,"correct":22},"自有时差",{"key":28,"text":127,"correct":22},"最早结束时间",{"key":31,"text":129,"correct":22},"最迟结束时间",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},939116,"某双代号网络图有 A、 B、 C、 D、E 五项工作，其中 A、B 完成后 D 开始， B、C 完成后 E 开始，能够正确表达上述逻辑关系的图形是（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"图 1",{"key":24,"text":137,"correct":22},"图 2",{"key":28,"text":139,"correct":22},"图 3",{"key":31,"text":141,"correct":26},"图 4",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},939117,"某双代号网络图如下图所示，下列选项描述正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"虚工作 2-3 是多余的",{"key":24,"text":149,"correct":22},"虚工作 4-5 是多余的",{"key":28,"text":151,"correct":22},"虚工作 5-6 是多余的",{"key":31,"text":153,"correct":26},"所有虚工作均为必要的",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},939118,"下列双代号时标网络计划中，关键线路有（ ）条。",[158,160,162,164],{"key":20,"text":159,"correct":22},"5",{"key":24,"text":161,"correct":22},"4",{"key":28,"text":163,"correct":26},"3",{"key":31,"text":165,"correct":22},"2",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},939119,"在工程网络计划中，关键工作是指（ ）的工作。",[170,172,174,176],{"key":20,"text":171,"correct":26},"最迟完成时间与最早完成时间的差值最小",{"key":24,"text":173,"correct":22},"双代号时标网络计划中无波形线",{"key":28,"text":175,"correct":22},"单代号搭接网络计划中时间间隔为零",{"key":31,"text":177,"correct":22},"双代号网路计划中两端节点均为关键节点",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},939120,"已知某工程的进度计划安排如下图，其中工作 J 的最早开始时间为（ ）天。",[182,183,184,186],{"key":20,"text":161,"correct":22},{"key":24,"text":159,"correct":26},{"key":28,"text":185,"correct":22},"7",{"key":31,"text":187,"correct":22},"8",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},939121,"下列关于关键工作和关键线路的表述，正确的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"关键线路上的工作全部是关键工作",{"key":24,"text":195,"correct":22},"关键工作不能在非关键线路上",{"key":28,"text":197,"correct":22},"关键线路上不允许出现虚工作",{"key":31,"text":199,"correct":22},"关键线路上的工作总时差均为零",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},939122,"下列关于计划评审技术法的表述，正确的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"计划评审技术法是按照按概率处理的网络计划技术",{"key":24,"text":207,"correct":26},"采用计划评审技术法，每项工作的持续时间是不肯定的",{"key":28,"text":209,"correct":22},"关键线路法比计划评审技术法估算出来的进度计划要更现实",{"key":31,"text":211,"correct":22},"采用计划评审技术法，工作与工作之间的逻辑关系是不肯定的",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},939123,"在某工程网络计划中，工作 H 的最早开始时间为第 12 天，持续时间为 4 天；工作 H 有三项紧后工作， 它们的最早开始时间分别为第 21 天、第 23 天和第 25 天，最迟开始时间分别为第 22 天、24 天和第 27 天。 则工作 H 的自由时差和总时差分别为（ ）天。",[216,218,220,222],{"key":20,"text":217,"correct":22},"4；5",{"key":24,"text":219,"correct":26},"5；6",{"key":28,"text":221,"correct":22},"4；4",{"key":31,"text":223,"correct":22},"7；11",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},939124,"某双代号网络图如下图所示，单位（天），其计算工期为（ ）天。",[228,229,230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":29,"correct":26},{"key":28,"text":25,"correct":22},{"key":31,"text":232,"correct":22},"21",{"id":234,"libraryId":5,"type":235,"typeLabel":236,"stem":237,"options":238,"answer":250,"analysis":33},939125,2,"多选题","项目管理计划中需要更新的内容包括（ ）。",[239,241,243,245,247],{"key":20,"text":240,"correct":26},"进度基准",{"key":24,"text":242,"correct":22},"成本数据",{"key":28,"text":244,"correct":26},"进度管理计划",{"key":31,"text":246,"correct":26},"成本基准",{"key":248,"text":249,"correct":22},"E","项目成本计划","ACD",{"id":252,"libraryId":5,"type":235,"typeLabel":236,"stem":253,"options":254,"answer":265,"analysis":33},939126,"某分部工程双代号网络图如下图所示，图中错误有（ ）",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"多个起点节点",{"key":24,"text":258,"correct":26},"多个终点节点",{"key":28,"text":260,"correct":22},"工作代号重复",{"key":31,"text":262,"correct":26},"节点编号有误",{"key":248,"text":264,"correct":22},"存在循环网路","BD",{"id":267,"libraryId":5,"type":235,"typeLabel":236,"stem":268,"options":269,"answer":280,"analysis":33},939127,"根据下面所示双代号网络图，工作 D 的紧前工作有（ ）。",[270,272,274,276,278],{"key":20,"text":271,"correct":26},"工作 H",{"key":24,"text":273,"correct":26},"工作 F",{"key":28,"text":275,"correct":26},"工作 A",{"key":31,"text":277,"correct":22},"工作 E",{"key":248,"text":279,"correct":22},"工作 B","ABC",{"id":282,"libraryId":5,"type":235,"typeLabel":236,"stem":283,"options":284,"answer":295,"analysis":33},939128,"工作进度计划中，需要更新的项目文件包括（ ）。",[285,287,289,291,293],{"key":20,"text":286,"correct":26},"风险登记册",{"key":24,"text":288,"correct":22},"工作时间",{"key":28,"text":290,"correct":22},"工作态度",{"key":31,"text":292,"correct":26},"工作属性",{"key":248,"text":294,"correct":26},"日历","ADE",{"id":297,"libraryId":5,"type":235,"typeLabel":236,"stem":298,"options":299,"answer":310,"analysis":33},939129,"下列不属于工程项目进度管理的工作过程的有（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"工作定义",{"key":24,"text":303,"correct":26},"工作内容实施",{"key":28,"text":305,"correct":22},"进度计划制定",{"key":31,"text":307,"correct":22},"进度控制",{"key":248,"text":309,"correct":26},"成本计划修改","BE",{"id":312,"libraryId":5,"type":235,"typeLabel":236,"stem":313,"options":314,"answer":322,"analysis":33},939130,"下列进度管理过程的内容中，最先和最后进行的内容为( )。",[315,317,318,320,321],{"key":20,"text":316,"correct":26},"规划进度管理",{"key":24,"text":301,"correct":22},{"key":28,"text":319,"correct":22},"工作顺序安排",{"key":31,"text":305,"correct":22},{"key":248,"text":307,"correct":26},"AE",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":31,"analysis":33},939131,"对工作分解结构(WBS)中规定的可交付成果或半成品必须进行的工作进行界定，并形成相 应的文件，这是( )的含义。",[327,329,331,333],{"key":20,"text":328,"correct":22},"工作成果",{"key":24,"text":330,"correct":22},"工作清单",{"key":28,"text":332,"correct":22},"工作顺序",{"key":31,"text":301,"correct":26},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},939132,"工程项目工作定义的基本依据是( )中做出的工作分解结构(WBS)。",[338,340,342,344],{"key":20,"text":339,"correct":22},"进度管理",{"key":24,"text":341,"correct":22},"合同管理",{"key":28,"text":343,"correct":22},"工程管理",{"key":31,"text":345,"correct":26},"范围管理",{"id":347,"libraryId":5,"type":235,"typeLabel":236,"stem":348,"options":349,"answer":359,"analysis":33},939133,"工作顺序安排的依据包括( )。",[350,351,353,355,357],{"key":20,"text":244,"correct":26},{"key":24,"text":352,"correct":26},"成果说明文件",{"key":28,"text":354,"correct":26},"各项工作之间的逻辑关系",{"key":31,"text":356,"correct":26},"组织过程资产",{"key":248,"text":358,"correct":22},"成本强度","ABCD",{"id":361,"libraryId":5,"type":235,"typeLabel":236,"stem":362,"options":363,"answer":374,"analysis":33},939134,"工作时间估算的方法有( )。",[364,366,368,370,372],{"key":20,"text":365,"correct":26},"类比估算",{"key":24,"text":367,"correct":26},"利用历史数据估算",{"key":28,"text":369,"correct":22},"头脑风暴法",{"key":31,"text":371,"correct":26},"专家判断估算",{"key":248,"text":373,"correct":26},"模拟法","ABDE",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},939135,"估算工作时间的模拟法最常用的是( )。",[379,381,383,385],{"key":20,"text":380,"correct":22},"类似模拟法",{"key":24,"text":382,"correct":22},"数字模拟法",{"key":28,"text":384,"correct":26},"蒙特卡罗分析法",{"key":31,"text":386,"correct":22},"情景模拟法",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":31,"analysis":33},939136,"M 工作与 N 工作之间的逻辑关系为工艺关系，说明他们之间的先后顺序是由( )决定的。",[391,393,395,397],{"key":20,"text":392,"correct":22},"人力调配需要",{"key":24,"text":394,"correct":22},"材料供应需要",{"key":28,"text":396,"correct":22},"资金调配需要",{"key":31,"text":398,"correct":26},"工作程序需要",{"id":400,"libraryId":5,"type":235,"typeLabel":236,"stem":401,"options":402,"answer":409,"analysis":33},939137,"某分部工程双代号时标网络计划如图所示，关键工作有( )。",[403,404,405,407,408],{"key":20,"text":275,"correct":26},{"key":24,"text":279,"correct":22},{"key":28,"text":406,"correct":26},"工作 C",{"key":31,"text":277,"correct":22},{"key":248,"text":273,"correct":26},"ACE",{"id":411,"libraryId":5,"type":235,"typeLabel":236,"stem":412,"options":413,"answer":374,"analysis":33},939138,"下列关于双代号绘图法的表述，正确的是( )。",[414,416,418,420,422],{"key":20,"text":415,"correct":26},"在双代号网络图中，工作由一根箭线连接两个圈表示",{"key":24,"text":417,"correct":26},"工作名称写在箭线的上面，完成工程需要的时间写在箭线的下面",{"key":28,"text":419,"correct":22},"箭头表示工作的开始，箭尾表示工作的结束",{"key":31,"text":421,"correct":26},"不消耗时间和资源的工作用虚箭线表示",{"key":248,"text":423,"correct":26},"需要消耗时间和资源的工作用实箭线表示",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},939139,"利用定额进行时间估算一般采用( )。",[428,430,432,434],{"key":20,"text":429,"correct":22},"专家估算法",{"key":24,"text":431,"correct":26},"单一时间估算法",{"key":28,"text":433,"correct":22},"三时估算法",{"key":31,"text":384,"correct":22},{"id":436,"libraryId":5,"type":235,"typeLabel":236,"stem":437,"options":438,"answer":448,"analysis":33},939140,"编制工程项目进度计划的方法主要有( )。",[439,441,443,444,446],{"key":20,"text":440,"correct":26},"关键线路法",{"key":24,"text":442,"correct":26},"计划评审技术",{"key":28,"text":369,"correct":22},{"key":31,"text":445,"correct":26},"图示评审技术",{"key":248,"text":447,"correct":22},"定额计算法","ABD",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},939141,"工期优化选择应缩短持续时间的关键工作不考虑( )因素。",[453,455,457,459],{"key":20,"text":454,"correct":22},"有充足备用资源的工作",{"key":24,"text":456,"correct":22},"缩短持续时间增加费用最少的工作",{"key":28,"text":458,"correct":26},"总时差的大小",{"key":31,"text":460,"correct":22},"缩短持续时间对质量和安全影响不大的工作",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},939142,"在合理工期条件下进行工程费用优化，如果缩短工期将会引起工程( )。",[465,467,469,471],{"key":20,"text":466,"correct":22},"直接费和间接费同时增加",{"key":24,"text":468,"correct":22},"直接费减少，间接费增加",{"key":28,"text":470,"correct":22},"直接费和间接费同时减少",{"key":31,"text":472,"correct":26},"直接费增加，间接费减少",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},939143,"工程项目进度管理中，采用工期最短的资源优化方法的工作有：①检查每天资源需用量 是否超过资源限量；②计算网络计划每天资源需用量；③对资源冲突的工作重新安排顺序；④重 复以上步骤直到出现优化方案。正确的实施顺序是( )。",[477,479,481,483],{"key":20,"text":478,"correct":22},"①→②→③→④",{"key":24,"text":480,"correct":26},"②→①→③→④",{"key":28,"text":482,"correct":22},"①→③→②→④",{"key":31,"text":484,"correct":22},"②→③→①→④",{"id":486,"libraryId":5,"type":235,"typeLabel":236,"stem":487,"options":488,"answer":280,"analysis":33},939144,"常用的进度比较方法有( )。",[489,491,493,495,497],{"key":20,"text":490,"correct":26},"趋势分析",{"key":24,"text":492,"correct":26},"关键路径法",{"key":28,"text":494,"correct":26},"挣值管理",{"key":31,"text":496,"correct":22},"前锋线比较法",{"key":248,"text":498,"correct":22},"列表比较法",{"id":500,"libraryId":5,"type":235,"typeLabel":236,"stem":501,"options":502,"answer":359,"analysis":33},939145,"实际进度与计划进度对比分析的趋势分析包括( )。",[503,505,506,508,510],{"key":20,"text":504,"correct":26},"横道图比较法",{"key":24,"text":496,"correct":26},{"key":28,"text":507,"correct":26},"S 形曲线比较法",{"key":31,"text":509,"correct":26},"香蕉曲线比较法",{"key":248,"text":492,"correct":22},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},939146,"下列不属于进度计划控制的具体内容的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"确定进度是否已发生变化",{"key":24,"text":518,"correct":26},"对工期定额进行重新编制",{"key":28,"text":520,"correct":22},"对实际发生的变化实施管理",{"key":31,"text":522,"correct":22},"对造成进度变化的因素施加影响",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},939147,"下列不属于在匀速进展横道图比较法中，完成任务量表示方法的为（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"费用支出",{"key":24,"text":530,"correct":26},"合同清单量",{"key":28,"text":532,"correct":22},"劳动消耗量",{"key":31,"text":534,"correct":22},"实物工程量",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},939148,"下列关于实际进度与计划进度的对比分析方法中，不属于趋势分析方法的是（ ）。",[539,540,541,542],{"key":20,"text":492,"correct":26},{"key":24,"text":498,"correct":22},{"key":28,"text":496,"correct":22},{"key":31,"text":504,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},939149,"在不影响其紧后工作最早开始的前提下，工作可以利用的机动时间是（ ）。",[547,548,550,552],{"key":20,"text":123,"correct":22},{"key":24,"text":549,"correct":22},"闲置时间",{"key":28,"text":551,"correct":22},"最早时间",{"key":31,"text":553,"correct":26},"自由时差",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},939150,"某网络计划中，工作 M 的最早完成时间为第 8 天，最迟完成时间为第 13 天，工作的持续时间为 4 天，与所有紧后工作的间隔时间最小值为 2 天。则该工作的自由时差为（ ）天。",[558,559,560,561],{"key":20,"text":165,"correct":26},{"key":24,"text":163,"correct":22},{"key":28,"text":161,"correct":22},{"key":31,"text":159,"correct":22},{"id":563,"libraryId":5,"type":235,"typeLabel":236,"stem":564,"options":565,"answer":576,"analysis":33},939151,"下列关于工程费用与工期在一般情况下的关系，正确的有（ ）。",[566,568,570,572,574],{"key":20,"text":567,"correct":22},"工期延长，工程总费用一定增加",{"key":24,"text":569,"correct":22},"工期缩短，工程总费用一定增加",{"key":28,"text":571,"correct":26},"工期缩短，直接费用随着增加",{"key":31,"text":573,"correct":22},"工期缩短，工程间接费用随着增加",{"key":248,"text":575,"correct":26},"工期延长，间接费用随着增加","CE",{"id":578,"libraryId":5,"type":235,"typeLabel":236,"stem":579,"options":580,"answer":359,"analysis":33},939152,"S 形曲线比较法以横坐标表示时间，纵坐标表示累计完成任务量，通过实际进度与计划进度的比较，可以获得的信息有（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":26},"实际工程进展",{"key":24,"text":584,"correct":26},"进度超前或拖延的时间",{"key":28,"text":586,"correct":26},"工程量的完成情况",{"key":31,"text":588,"correct":26},"后续工程进度预测",{"key":248,"text":590,"correct":22},"进度计划是否合理",{"id":592,"libraryId":5,"type":235,"typeLabel":236,"stem":593,"options":594,"answer":605,"analysis":33},939153,"下列关于双代号网络计划的表述，正确的有（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"可能没有关键线路",{"key":24,"text":598,"correct":26},"至少有一条关键线路",{"key":28,"text":600,"correct":26},"在计划工期等于计算工期时，关键工作为总时差为零的工作",{"key":31,"text":602,"correct":22},"在网络计划执行过程中，关键线路不能转移",{"key":248,"text":604,"correct":22},"由关键节点组成的线路就是关键线路","BC",{"id":607,"libraryId":5,"type":235,"typeLabel":236,"stem":608,"options":609,"answer":409,"analysis":33},939154,"针对下列双代号网络计划，下列表述正确的有（ ）。",[610,612,614,616,618],{"key":20,"text":611,"correct":26},"工作 A 的 FF 为 0 天",{"key":24,"text":613,"correct":22},"工作 E 的 FF 为第 4 天",{"key":28,"text":615,"correct":26},"工作 B 的 LF 为第 7 天",{"key":31,"text":617,"correct":22},"工作 E 的 LS 为第 7 天",{"key":248,"text":619,"correct":26},"工作 C 的 TF 为 2 天",{"id":621,"libraryId":5,"type":235,"typeLabel":236,"stem":622,"options":623,"answer":374,"analysis":33},939155,"某工程双代号网络计划如下图，已标出各项工作的最早开始时间（ESi-j）、最迟开始时间（LSi\u0002j）和持续时间（Di-j）。该网络计划表明（ ）。",[624,626,628,630,632],{"key":20,"text":625,"correct":26},"工作 C 和工作 E 均为关键工作",{"key":24,"text":627,"correct":26},"工作 B 的总时差和自由时差相等",{"key":28,"text":629,"correct":22},"工作 D 的总时差和自由时差相等",{"key":31,"text":631,"correct":26},"工作 G 的总时差.自由时差分别为 2 天和 0 天",{"key":248,"text":633,"correct":26},"工作 J 的总时差和自由时差相等",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":24,"analysis":33},939156,"确定为产生项目可交付成果而必须进行的具体工作，这是进度管理过程中的（ ）。",[638,639,640,641],{"key":20,"text":316,"correct":22},{"key":24,"text":301,"correct":26},{"key":28,"text":319,"correct":22},{"key":31,"text":305,"correct":22},[643,646,649,652,655,658],{"id":15,"name":644,"category":7,"favorite":645},"领导干部任职前廉政法规知识测试题",92,{"id":647,"name":648,"category":7,"favorite":15},595,"建筑结构与设备",{"id":650,"name":651,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":653,"name":654,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":656,"name":657,"category":7,"favorite":8},534,"BIM工程师",{"id":659,"name":657,"category":7,"favorite":8},535]