[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":635},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,28,50,1948,[13,34,52,67,82,94,106,118,130,138,153,165,177,189,201,216,231,245,257,272,284,296,308,320,332,344,358,369,378,386,398,410,425,437,445,457,467,476,488,500,511,523,535,549,564,578,591,605,617,627],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},939057,1,"单选题","偏差对后续工期的影响通常需要借助网络计划进行判断，根据该项目是否处于关键线路、其进度偏差是否超过该项工作的（ ）来判断。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","最早开始时间",false,{"key":24,"text":25,"correct":22},"B","最迟开始时间",{"key":27,"text":28,"correct":22},"C","总时差和总工期",{"key":30,"text":31,"correct":32},"D","总时差和自由时差",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},939058,2,"多选题","将工程项目实际进度与计划进度进行比较的方法主要有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"关键线路比较法",{"key":24,"text":43,"correct":32},"横道图比较法",{"key":27,"text":45,"correct":22},"控制图比较法",{"key":30,"text":47,"correct":32},"前锋线比较法",{"key":49,"text":50,"correct":32},"E","列表比较法","BDE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},939059,"下列进度控制过程的内容中，最先和最后进行的内容为（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"出现进度偏差",{"key":24,"text":59,"correct":22},"分析偏差对其后续工作和总工期的影响",{"key":27,"text":61,"correct":22},"采取进度调整措施",{"key":30,"text":63,"correct":22},"采取相应的经济、组织、合同措施",{"key":49,"text":65,"correct":32},"进度监测系统","AE",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},939060,"既保持项目范围不变，又能使关键线路长度减少的措施有（ ）",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"增加资源",{"key":24,"text":74,"correct":22},"消除时差",{"key":27,"text":76,"correct":32},"赶工",{"key":30,"text":78,"correct":32},"调整逻辑关系",{"key":49,"text":80,"correct":22},"减少项目工作","ACD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},939061,"工程双代号时标网络计划如图所示，当计划执行到第 5 周末检查时，其实际进度如图中前锋线所示，检查结果表明（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"D工作滞后1周，不影响总工期",{"key":24,"text":89,"correct":22},"I工作滞后1周，预计总工期延长1周",{"key":27,"text":91,"correct":22},"E工作提前1周，预计总工期缩短1周",{"key":30,"text":93,"correct":32},"H工作提前1周，不影响总工期",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},939062,"下列关于虚箭线的说法错误的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"不消耗时间",{"key":24,"text":101,"correct":22},"不消耗资源",{"key":27,"text":103,"correct":22},"表达逻辑关系",{"key":30,"text":105,"correct":32},"表达组织关系",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},939063,"工程项目进度管理中，可以称为软逻辑关系的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":32},"组织关系",{"key":24,"text":113,"correct":22},"工艺关系",{"key":27,"text":115,"correct":22},"时间关系",{"key":30,"text":117,"correct":22},"工序关系",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},939064,"( )阶段的资源投入对整个工程项目总体投资的影响程度是最重要的。",[122,124,126,128],{"key":20,"text":123,"correct":32},"决策",{"key":24,"text":125,"correct":22},"实施",{"key":27,"text":127,"correct":22},"准备",{"key":30,"text":129,"correct":22},"竣工",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},939065,"工程项目投资建设各阶段中，资源消耗量最大的是项目( )阶段。",[134,135,136,137],{"key":20,"text":123,"correct":22},{"key":24,"text":127,"correct":22},{"key":27,"text":125,"correct":32},{"key":30,"text":129,"correct":22},{"id":139,"libraryId":5,"type":36,"typeLabel":37,"stem":140,"options":141,"answer":152,"analysis":33},939066,"定义优先级的标准一般有( )。",[142,144,146,148,150],{"key":20,"text":143,"correct":32},"资源的数量和价值量",{"key":24,"text":145,"correct":32},"资源增减的可能性",{"key":27,"text":147,"correct":32},"获得程度",{"key":30,"text":149,"correct":32},"可替代性",{"key":49,"text":151,"correct":22},"价格问题对项目的影响","ABCD",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":30,"analysis":33},939067,"双代号网络计划中，关键工作是指( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"自由时差最小的工作",{"key":24,"text":160,"correct":22},"两端节点均为关键节点的工作",{"key":27,"text":162,"correct":22},"持续时间最长的工作",{"key":30,"text":164,"correct":32},"最迟完成时间与最早完成时间的相差最小的工作",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},939068,"工程网络计划中的费用优化，是指寻求( )的过程。",[169,171,173,175],{"key":20,"text":170,"correct":32},"工程总成本最低时的最短工期安排",{"key":24,"text":172,"correct":22},"工程直接成本最低时的工期安排",{"key":27,"text":174,"correct":22},"工程间接成本最低时的工期安排",{"key":30,"text":176,"correct":22},"给定费用下的最短工期安排",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},939069,"某工程拟将持续时间由 15 天缩短为 13 天，持续时间为 15 天时总费用为 10 万元，其中 直接费用为 8 万元，持续时间为 13 天时直接费用为 10 万元。缩短持续时间的间接费用率为 0.1 万元\u002F天，则工程持续时间缩短后总费用为( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"12.0 万元",{"key":24,"text":184,"correct":22},"11.1 万元",{"key":27,"text":186,"correct":32},"11.8 万元",{"key":30,"text":188,"correct":22},"10.2 万元",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},939070,"在工程项目进度资源优化管理中，影响进度的主要因素是( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"资源的需求情况",{"key":24,"text":196,"correct":22},"资源的配置情况",{"key":27,"text":198,"correct":22},"资源的利用情况",{"key":30,"text":200,"correct":32},"资源的供应情况",{"id":202,"libraryId":5,"type":36,"typeLabel":37,"stem":203,"options":204,"answer":215,"analysis":33},939071,"工程项目进度计划的资源优化是在现有资源条件下寻求( )。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"最优工期条件下的资源均衡",{"key":24,"text":208,"correct":32},"工期固定条件下的资源均衡",{"key":27,"text":210,"correct":32},"资源有限条件下的最短工期",{"key":30,"text":212,"correct":22},"资源均衡使用时的最短工期",{"key":49,"text":214,"correct":22},"最低成本条件下的最短工期","BC",{"id":217,"libraryId":5,"type":36,"typeLabel":37,"stem":218,"options":219,"answer":230,"analysis":33},939072,"工程项目进度计划的表示方法包括( )。",[220,222,224,226,228],{"key":20,"text":221,"correct":32},"横道图法",{"key":24,"text":223,"correct":32},"可交付成果法",{"key":27,"text":225,"correct":32},"进度曲线法",{"key":30,"text":227,"correct":22},"计划评审技术法",{"key":49,"text":229,"correct":22},"图示评审技术法","ABC",{"id":232,"libraryId":5,"type":36,"typeLabel":37,"stem":233,"options":234,"answer":244,"analysis":33},939073,"如果要减少项目进度计划的计算工期，可以采取的措施有( )。",[235,237,239,240,242],{"key":20,"text":236,"correct":32},"增加人员",{"key":24,"text":238,"correct":22},"削减时差",{"key":27,"text":76,"correct":32},{"key":30,"text":241,"correct":22},"增加平行作业",{"key":49,"text":243,"correct":32},"取消部分工作","ACE",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},939074,"工程项目进度管理工作包括：①工作定义；②工作排序；③工作进度控制；④工作进度 计划制定；⑤工作时间估计；⑥规划进度管理。正确的顺序是( )。",[249,251,253,255],{"key":20,"text":250,"correct":22},"⑥－①－②－③－④－⑤",{"key":24,"text":252,"correct":32},"⑥－①－②－⑤－④－③",{"key":27,"text":254,"correct":22},"⑥－①－③－②－⑤－④",{"key":30,"text":256,"correct":22},"⑥－①－⑤－②－④－③",{"id":258,"libraryId":5,"type":36,"typeLabel":37,"stem":259,"options":260,"answer":271,"analysis":33},939075,"工程项目进度管理中，工作定义的成果包括( )。",[261,263,265,267,269],{"key":20,"text":262,"correct":32},"工作清单",{"key":24,"text":264,"correct":22},"项目范围说明书",{"key":27,"text":266,"correct":22},"项目网络图",{"key":30,"text":268,"correct":32},"工作分解结构的更新",{"key":49,"text":270,"correct":22},"工作顺序安排","AD",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":30,"analysis":33},939076,"工程项目进度管理中，计划评审技术对时间的估算采用( )估算方法。",[276,278,280,282],{"key":20,"text":277,"correct":22},"总时间",{"key":24,"text":279,"correct":22},"最大可能时间",{"key":27,"text":281,"correct":22},"阶段时间",{"key":30,"text":283,"correct":32},"加权平均时间",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},939077,"工作和工作之间的逻辑关系和工作的持续时间都具有不肯定性而按概率处理的网络计划 技术是( )。",[288,290,292,294],{"key":20,"text":289,"correct":32},"图示评审技术",{"key":24,"text":291,"correct":22},"计划评审技术",{"key":27,"text":293,"correct":22},"关键线路法",{"key":30,"text":295,"correct":22},"定额计算法",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},939078,"在双代号网络计划中，工作的最迟完成时间为其所有紧后工作( )。",[300,302,304,306],{"key":20,"text":301,"correct":22},"最早开始时间的最大值",{"key":24,"text":303,"correct":22},"最早开始时间的最小值",{"key":27,"text":305,"correct":22},"最迟开始时间的最大值",{"key":30,"text":307,"correct":32},"最迟开始时间的最小值",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},939079,"在双代号网络计划中，某一工作的自由时差为其( )。",[312,314,316,318],{"key":20,"text":313,"correct":32},"紧后工作的最早开始时间最小值减去本工作的最早完成时间",{"key":24,"text":315,"correct":22},"紧后工作的最迟开始时间最小值减去本工作的最迟完成时间",{"key":27,"text":317,"correct":22},"紧后工作的最早开始时间最大值减去本工作的最早完成时间",{"key":30,"text":319,"correct":22},"紧后工作的最迟开始时间最大值减去本工作的最迟完成时间",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},939080,"某工程网络计划中，M 工作的最早开始时间和最迟开始时间分别是第 12 天和第 15 天，其 持续时间为 6 天，M 工作有 3 项紧后工作，它们的最早开始时间分别是第 21 天，第 24 天，第 28 天，则 M 工作的自由时差是( )天。",[324,326,328,330],{"key":20,"text":325,"correct":22},"1",{"key":24,"text":327,"correct":32},"3",{"key":27,"text":329,"correct":22},"4",{"key":30,"text":331,"correct":22},"8",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},939081,"某工程双代号网络计划如下图所示，其中关键线路有( )条。",[336,338,340,342],{"key":20,"text":337,"correct":22},"1 条",{"key":24,"text":339,"correct":22},"2 条",{"key":27,"text":341,"correct":32},"3 条",{"key":30,"text":343,"correct":22},"4 条",{"id":345,"libraryId":5,"type":36,"typeLabel":37,"stem":346,"options":347,"answer":230,"analysis":33},939082,"下列关于关键线路法的表述，正确的是( )。",[348,350,352,354,356],{"key":20,"text":349,"correct":32},"线路上所有工作持续时间之和为该线路的总持续时间",{"key":24,"text":351,"correct":32},"总持续时间最长的线路称为关键线路",{"key":27,"text":353,"correct":32},"网络计划中关键线路可能不止一条",{"key":30,"text":355,"correct":22},"网络计划执行过程中关键线路总是固定不变的",{"key":49,"text":357,"correct":22},"关键工作的实际进度提前或拖后，不会对总工期产生影响",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},939083,"某工程项目包括 ABCD 四项工作，工作之间的逻辑关系如下图所示，该项目的工期为( ) 天。",[362,364,365,367],{"key":20,"text":363,"correct":22},"7",{"key":24,"text":331,"correct":22},{"key":27,"text":366,"correct":22},"9",{"key":30,"text":368,"correct":32},"10",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},939084,"某工程项目实施过程的部分时间参数如下表所示： 其中，自由时差最大的工作是( )。",[373,374,375,376],{"key":20,"text":24,"correct":22},{"key":24,"text":30,"correct":32},{"key":27,"text":49,"correct":22},{"key":30,"text":377,"correct":22},"G",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},939085,"某工作网络计划如下图所示，工作 A、 B、 D、E 的总时差最小的是工作( )。",[382,383,384,385],{"key":20,"text":20,"correct":32},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":22},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},939086,"在工程项目进度计划表示方法中，与横道图相比，时标网络图的优点是能够( )。",[390,392,394,396],{"key":20,"text":391,"correct":22},"明确表示各项资源需求量",{"key":24,"text":393,"correct":32},"明确表示各项工作之间的逻辑关系",{"key":27,"text":395,"correct":22},"直观表示各项工作的持续时间",{"key":30,"text":397,"correct":22},"直观表示工程进度计划的计算工期",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},939087,"进度监测的系统过程，首先进行的工作是( )。",[402,404,406,408],{"key":20,"text":403,"correct":32},"进度计划的实施",{"key":24,"text":405,"correct":22},"建立进度数据采集系统",{"key":27,"text":407,"correct":22},"数据的整理统计和分析",{"key":30,"text":409,"correct":22},"实际进度与计划进度比较",{"id":411,"libraryId":5,"type":36,"typeLabel":37,"stem":412,"options":413,"answer":424,"analysis":33},939088,"某工作的实际进度发生偏差，判断其对后续工作和总工期是否产生影响的依据有( )。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"工程资源的分布是否均衡",{"key":24,"text":417,"correct":22},"该工程的实际投资是否到位",{"key":27,"text":419,"correct":32},"该工作是否处于关键线路",{"key":30,"text":421,"correct":32},"进度偏差是否超过该工作的总时差",{"key":49,"text":423,"correct":32},"进度偏差是否超过该工作的自由时差","CDE",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":30,"analysis":33},939089,"工程双代号时标网络计划如图所示，当计划执行到第 5 周末检查时，其实际进度如图中 前锋线所示，检查结果表明( )。",[429,431,433,435],{"key":20,"text":430,"correct":22},"D 工作滞后 1 周，不影响总工期",{"key":24,"text":432,"correct":22},"I 工作滞后 1 周，预计总工期延长 1 周",{"key":27,"text":434,"correct":22},"E 工作提前 1 周，预计总工期缩短 1 周",{"key":30,"text":436,"correct":32},"H 工作提前 1 周，不影响总工期",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},939090,"用双代号绘图法绘制网络图时，某项工作不消耗时间不消耗资源，则该工作用（ ）表示。",[441,442,443,444],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},939091,"工作定义就是对（ ）中规定的可以交付成果或半成品必须进行的工作界定，并形成相应的文件。",[449,451,453,455],{"key":20,"text":450,"correct":22},"进度计划",{"key":24,"text":452,"correct":22},"项目管理计划",{"key":27,"text":454,"correct":32},"工作分解结构",{"key":30,"text":456,"correct":22},"范围界定",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},939092,"在工程项目进度管理中，工作定义基本依据是（ ）。",[461,462,463,465],{"key":20,"text":454,"correct":32},{"key":24,"text":264,"correct":22},{"key":27,"text":464,"correct":22},"环境因素",{"key":30,"text":466,"correct":22},"组织过程资产",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":30,"analysis":33},939093,"规定了用于项目进度规划的方法和工具，对工作排序具有指导作用的工作顺序安排的依据是（ ）。",[471,472,473,474],{"key":20,"text":262,"correct":22},{"key":24,"text":264,"correct":22},{"key":27,"text":464,"correct":22},{"key":30,"text":475,"correct":32},"进度管理计划",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},939094,"关于双代号网络图绘图规则的说法，正确的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"箭线不能交叉",{"key":24,"text":483,"correct":22},"关键工作必须安排在图面中心",{"key":27,"text":485,"correct":32},"只有一个起点节点",{"key":30,"text":487,"correct":22},"工作箭线只能用水平线",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},939095,"某工程双代号时标网络计划如下图所示，其中工作 A 的总时差和自由时差（ ）周",[492,494,496,498],{"key":20,"text":493,"correct":32},"1；0",{"key":24,"text":495,"correct":22},"均为 0",{"key":27,"text":497,"correct":22},"0；1",{"key":30,"text":499,"correct":22},"均为 1",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":30,"analysis":33},939096,"某项目部分工作横道图和对应的劳动力计划图如下图所示，图中 LED 灯安装需要的工人数 为（ ）。",[504,505,507,509],{"key":20,"text":368,"correct":22},{"key":24,"text":506,"correct":22},"12",{"key":27,"text":508,"correct":22},"14",{"key":30,"text":510,"correct":32},"16",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},939097,"项目建设周期中，对整个工程项目总体投资的影响程度最重要是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":32},"前期阶段",{"key":24,"text":518,"correct":22},"准备阶段",{"key":27,"text":520,"correct":22},"实施阶段",{"key":30,"text":522,"correct":22},"投产运营阶段",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},939098,"在计算双代号网络计划的时间参数时，工作的最早开始时间应为其所有紧前工作（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"最早完成时间的最小值",{"key":24,"text":530,"correct":32},"最早完成时间的最大值",{"key":27,"text":532,"correct":22},"最迟完成时间的最小值",{"key":30,"text":534,"correct":22},"最迟完成时间的最大值",{"id":536,"libraryId":5,"type":36,"typeLabel":37,"stem":537,"options":538,"answer":215,"analysis":33},939099,"关于双代号网络计划的说法，正确的有（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"可能没有关键线路",{"key":24,"text":542,"correct":32},"至少有一条关键线路",{"key":27,"text":544,"correct":32},"在计划工期等于计算工期时，关键工作为总时差为零的工作",{"key":30,"text":546,"correct":22},"在网络计划执行过程中，关键线路不能转移",{"key":49,"text":548,"correct":22},"由关键节点组成的线路，就是关键线路",{"id":550,"libraryId":5,"type":36,"typeLabel":37,"stem":551,"options":552,"answer":563,"analysis":33},939100,"工作时间估算的群体决策技术包括（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"类比估算",{"key":24,"text":556,"correct":22},"利用历史数据",{"key":27,"text":558,"correct":22},"专家判断估算",{"key":30,"text":560,"correct":32},"头脑风暴",{"key":49,"text":562,"correct":32},"德尔菲技术","DE",{"id":565,"libraryId":5,"type":36,"typeLabel":37,"stem":566,"options":567,"answer":244,"analysis":33},939101,"下列关于横道图的表述，正确的有（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":32},"横道图的优点是简单明了，易于掌握",{"key":24,"text":571,"correct":22},"横道图的右边按工作的先后顺序列出项目的工作名称",{"key":27,"text":573,"correct":32},"横道图的缺点是不能全面反映各项工作之间的逻辑关系和整个工程的主次工作",{"key":30,"text":575,"correct":22},"横道图的左边是进度表",{"key":49,"text":577,"correct":32},"横道图水平线段的位置和长短反映该项目从开始到完工的时间",{"id":579,"libraryId":5,"type":36,"typeLabel":37,"stem":580,"options":581,"answer":81,"analysis":33},939102,"进度比较方法中，趋势分析的比较方法包括（ ）。",[582,583,585,587,589],{"key":20,"text":221,"correct":32},{"key":24,"text":584,"correct":22},"时标网络图法",{"key":27,"text":586,"correct":32},"前锋线",{"key":30,"text":588,"correct":32},"列表法",{"key":49,"text":590,"correct":22},"里程碑法",{"id":592,"libraryId":5,"type":36,"typeLabel":37,"stem":593,"options":594,"answer":215,"analysis":33},939103,"某工程双代号时标网络计划执行到第 4 周末和第 10 周末时，检查其实际进度如下图前锋线所示，检查结果表明（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"第 4 周末检查时工作 B 拖后 1 周，但不影响总工期",{"key":24,"text":598,"correct":32},"第 4 周末检查时工作 A 拖后 1 周，影响总工期 1 周",{"key":27,"text":600,"correct":32},"第 10 周末检查时工作 G 拖后 1 周，但不影响总工期",{"key":30,"text":602,"correct":22},"第 10 周末检查时工作 I 提前 1 周，可使总工期提前 1 周",{"key":49,"text":604,"correct":22},"在第 5 周到第 10 周内，工作 F 和工作 I 的实际进度正常",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},939104,"下列不属于工程项目进度控制结果的是（ ）",[609,611,613,615],{"key":20,"text":610,"correct":32},"编制进度计划",{"key":24,"text":612,"correct":22},"工作绩效信息",{"key":27,"text":614,"correct":22},"项目文件更新",{"key":30,"text":616,"correct":22},"项目管理计划更新",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":30,"analysis":33},939105,"下列不属于工作定义成果的是（ ）。",[621,622,624,625],{"key":20,"text":262,"correct":22},{"key":24,"text":623,"correct":22},"里程碑清单",{"key":27,"text":454,"correct":22},{"key":30,"text":626,"correct":32},"进度计划制定",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":27,"analysis":33},939106,"工作定义的基本依据是（ ）。",[631,632,633,634],{"key":20,"text":464,"correct":22},{"key":24,"text":475,"correct":22},{"key":27,"text":454,"correct":32},{"key":30,"text":264,"correct":22},[636,639,642,645,648,651],{"id":15,"name":637,"category":7,"favorite":638},"领导干部任职前廉政法规知识测试题",92,{"id":640,"name":641,"category":7,"favorite":15},595,"建筑结构与设备",{"id":643,"name":644,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":646,"name":647,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":649,"name":650,"category":7,"favorite":8},534,"BIM工程师",{"id":652,"name":650,"category":7,"favorite":8},535]