[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":650},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,27,50,1948,[13,34,46,58,76,88,100,112,124,136,148,160,172,187,202,214,222,232,247,259,274,284,296,311,323,335,347,361,376,388,403,415,429,441,456,468,480,492,504,516,526,535,549,559,571,583,595,608,620,635],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},939007,1,"单选题","关于工程项目合同的说法，错误的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程项目合同是一个合同群体",false,{"key":24,"text":25,"correct":22},"B","订立合同应遵循平等自愿原则",{"key":27,"text":28,"correct":22},"C","合同双方行为应遵守《招标投标法》",{"key":30,"text":31,"correct":32},"D","合同标的不限于项目涉及的内容",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},939008,"订立合同时双方当事人的权利和义务应当对等，这体现了工程项目合同管理中的（ ）原则。",[38,40,42,44],{"key":20,"text":39,"correct":32},"公平",{"key":24,"text":41,"correct":22},"信用",{"key":27,"text":43,"correct":22},"公正",{"key":30,"text":45,"correct":22},"诚实",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},939009,"合同一方不得把自己的意愿强加于另一方，这是合同管理（ ）原则的要求。",[50,52,54,56],{"key":20,"text":51,"correct":22},"诚实信用",{"key":24,"text":53,"correct":32},"平等自愿",{"key":27,"text":55,"correct":22},"等价有偿",{"key":30,"text":57,"correct":22},"公平公正",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},939010,2,"多选题","工程项目材料采购合同条款主要涉及材料的（ ）等。",[64,66,68,70,72],{"key":20,"text":65,"correct":32},"交接程序",{"key":24,"text":67,"correct":32},"检验方式",{"key":27,"text":69,"correct":22},"性能保修",{"key":30,"text":71,"correct":32},"质量要求",{"key":73,"text":74,"correct":22},"E","安装调试","ABD",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":30,"analysis":33},939011,"对工作分解结构（WBS）中规定的可交付成果或半成品必须进行的工作进行界定，并形成相应的文件，这是（ ）的含义。",[80,82,84,86],{"key":20,"text":81,"correct":22},"工作成果",{"key":24,"text":83,"correct":22},"工作清单",{"key":27,"text":85,"correct":22},"工作顺序",{"key":30,"text":87,"correct":32},"工作定义",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":30,"analysis":33},939012,"工程项目进度管理中，工作定义的主要任务是（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":22},"制订出完成各项具体工作的时间进度安排",{"key":24,"text":95,"correct":22},"对完成各项具体工作所需要的时间进行估计推算",{"key":27,"text":97,"correct":22},"找出各项具体工作之问的逻辑关系并形成文件",{"key":30,"text":99,"correct":32},"确定为产生各项可交付成果必须进行的具体工作",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":27,"analysis":33},939013,"某工程双代号网络计划如图所示，其中关键线路有（ ）条。",[104,106,108,110],{"key":20,"text":105,"correct":22},"1条",{"key":24,"text":107,"correct":22},"2条",{"key":27,"text":109,"correct":32},"3条",{"key":30,"text":111,"correct":22},"4条",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":30,"analysis":33},939014,"M 工作与N 工作之间的逻辑关系为工艺关系，说明他们之间的先后顺序是由（ ）决定的。",[116,118,120,122],{"key":20,"text":117,"correct":22},"人力调配需要",{"key":24,"text":119,"correct":22},"材料供应需要",{"key":27,"text":121,"correct":22},"资金调配需要",{"key":30,"text":123,"correct":32},"工作程序需要",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":30,"analysis":33},939015,"下列关于虚箭线的说法错误的是（ ）",[128,130,132,134],{"key":20,"text":129,"correct":22},"不消耗时间",{"key":24,"text":131,"correct":22},"不消耗资源",{"key":27,"text":133,"correct":22},"表达逻辑关系",{"key":30,"text":135,"correct":32},"表达组织关系",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":27,"analysis":33},939016,"关于双代号时标网络计划的说法，错误的是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"实箭线的水平投影长度表示该工作的持续时间",{"key":24,"text":143,"correct":22},"波形线表示工作与其紧后工作之间的时间间隔",{"key":27,"text":145,"correct":32},"时标网络计划宜按各项工作的最晚开始时间编制",{"key":30,"text":147,"correct":22},"双代号时标网络计划以水平时间坐标为尺度进行绘制",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},939017,"工程项目进度管理中，可以称为软逻辑关系的是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":32},"组织关系",{"key":24,"text":155,"correct":22},"工艺关系",{"key":27,"text":157,"correct":22},"时间关系",{"key":30,"text":159,"correct":22},"工序关系",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":30,"analysis":33},939018,"工程项目工作定义的基本依据是（ ）中做出的工作分解结构（WBS）",[164,166,168,170],{"key":20,"text":165,"correct":22},"进度管理",{"key":24,"text":167,"correct":22},"合同管理",{"key":27,"text":169,"correct":22},"工程管理",{"key":30,"text":171,"correct":32},"范围管理",{"id":173,"libraryId":5,"type":60,"typeLabel":61,"stem":174,"options":175,"answer":186,"analysis":33},939019,"工程项目进度管理的工作内容主要有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"资源需求分析",{"key":24,"text":179,"correct":32},"工作时间估算",{"key":27,"text":181,"correct":22},"工作成本测算",{"key":30,"text":183,"correct":32},"工作顺序安排",{"key":73,"text":185,"correct":32},"进度计划编制","BDE",{"id":188,"libraryId":5,"type":60,"typeLabel":61,"stem":189,"options":190,"answer":201,"analysis":33},939020,"工作时间估算的方法有（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":32},"类比估算",{"key":24,"text":194,"correct":32},"利用历史数据估算",{"key":27,"text":196,"correct":22},"头脑风暴法",{"key":30,"text":198,"correct":32},"专家判断估算",{"key":73,"text":200,"correct":32},"模拟法","ABDE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},939021,"（ ）阶段的资源投入对整个工程项目总体投资的影响程度是最重要的。",[206,208,210,212],{"key":20,"text":207,"correct":32},"决策",{"key":24,"text":209,"correct":22},"实施",{"key":27,"text":211,"correct":22},"准备",{"key":30,"text":213,"correct":22},"竣工",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},939022,"工程项目投资建设各阶段中，资源消耗量最大的是项目（ ）阶段。",[218,219,220,221],{"key":20,"text":207,"correct":22},{"key":24,"text":211,"correct":22},{"key":27,"text":209,"correct":32},{"key":30,"text":213,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},939023,"在工程项目建设中，普通人员及材料设备的需要量高峰值通常出现在（ ）阶段。",[226,228,229,230],{"key":20,"text":227,"correct":22},"前期",{"key":24,"text":211,"correct":22},{"key":27,"text":209,"correct":32},{"key":30,"text":231,"correct":22},"试生产及竣工验收",{"id":233,"libraryId":5,"type":60,"typeLabel":61,"stem":234,"options":235,"answer":246,"analysis":33},939024,"定义优先级的标准一般有（ ）。",[236,238,240,242,244],{"key":20,"text":237,"correct":32},"资源的数量和价值量",{"key":24,"text":239,"correct":32},"资源增减的可能性",{"key":27,"text":241,"correct":32},"获得程度",{"key":30,"text":243,"correct":32},"可替代性",{"key":73,"text":245,"correct":22},"价格问题对项目的影响","ABCD",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},939025,"估算工作时间的模拟法最常用的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"类似模拟法",{"key":24,"text":254,"correct":22},"数字模拟法",{"key":27,"text":256,"correct":32},"蒙特卡罗分析法",{"key":30,"text":258,"correct":22},"情景模拟法",{"id":260,"libraryId":5,"type":60,"typeLabel":61,"stem":261,"options":262,"answer":273,"analysis":33},939026,"工程项目进度计划的表示方法包括（ ）",[263,265,267,269,271],{"key":20,"text":264,"correct":32},"横道图法",{"key":24,"text":266,"correct":32},"可交付成果法",{"key":27,"text":268,"correct":32},"进度曲线法",{"key":30,"text":270,"correct":22},"计划评审技术法",{"key":73,"text":272,"correct":22},"图示评审技术法","ABC",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":30,"analysis":33},939027,"下列工程进度计划表示方法中，不能直接在图上显示各项工作的开始和完成时间的方法是（ ）。",[278,279,281,283],{"key":20,"text":264,"correct":22},{"key":24,"text":280,"correct":22},"时标网络图法",{"key":27,"text":282,"correct":22},"单代号网络图法",{"key":30,"text":268,"correct":32},{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},939028,"在工程项目进度计划表示方法中，与横道图相比，时标网络图的优点是能够（ ）",[288,290,292,294],{"key":20,"text":289,"correct":22},"明确表示各项资源需求量",{"key":24,"text":291,"correct":32},"明确表示各项工作之间的逻辑关系",{"key":27,"text":293,"correct":22},"直观表示各项工作的持续时间",{"key":30,"text":295,"correct":22},"直观表示工程进度计划的计算工期",{"id":297,"libraryId":5,"type":60,"typeLabel":61,"stem":298,"options":299,"answer":310,"analysis":33},939029,"关于项目进度计划及其优化的说法，正确的有（ ）",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"计划中的关键工作指的是自由时差为零的工作",{"key":24,"text":303,"correct":32},"计划优化时应考虑有充足备用资源的工作",{"key":27,"text":305,"correct":22},"工期优化通过压缩持续时间长的工作进行",{"key":30,"text":307,"correct":32},"横道图是传统的进度计划表示方法",{"key":73,"text":309,"correct":22},"工作间逻辑关系不能确定时，应采用计划评审技术编制计划","BD",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":27,"analysis":33},939030,"某工程拟将持续时间由15 天缩短为13 天，持续时间为15 天时总费用为10 万元，其中直接费用为8 万元，持续时间为13 天时直接费用为10 万元。缩短持续时间的间接费用率为0.1 万元\u002F天，则工程持续时间缩短后总费用为（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"12.0万元",{"key":24,"text":318,"correct":22},"11.1万元",{"key":27,"text":320,"correct":32},"11.8万元",{"key":30,"text":322,"correct":22},"10.2万元",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},939031,"工程项目进度管理中，采用工期最短的资源优化方法的工作有：①检查每天资源需用量是否超过资源限量；②计算网络计划每天资源需用量；③对资源冲突的工作重新安排顺序；④重复以上步骤直到出现优化方案。正确的实施顺序是（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"①→②→③→④",{"key":24,"text":330,"correct":32},"②→①→③→④",{"key":27,"text":332,"correct":22},"①→③→②→④",{"key":30,"text":334,"correct":22},"②→③→①→④",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},939032,"工程网络计划中的费用优化，是指寻求（ ）的过程。",[339,341,343,345],{"key":20,"text":340,"correct":32},"工程总成本最低时的最短工期安排",{"key":24,"text":342,"correct":22},"工程直接成本最低时的工期安排",{"key":27,"text":344,"correct":22},"工程间接成本最低时的工期安排",{"key":30,"text":346,"correct":22},"给定费用下的最短工期安排",{"id":348,"libraryId":5,"type":60,"typeLabel":61,"stem":349,"options":350,"answer":310,"analysis":33},939033,"工程项目进度计划优化中的费用优化是为了寻求（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"资源有限条件下的最短工期安排",{"key":24,"text":354,"correct":32},"最低成本时的最短工期安排",{"key":27,"text":356,"correct":22},"资源均衡使用时的最短工期安排",{"key":30,"text":358,"correct":32},"满足要求工期时的最低成本安排",{"key":73,"text":360,"correct":22},"最低成本条件下资源均衡安排",{"id":362,"libraryId":5,"type":60,"typeLabel":61,"stem":363,"options":364,"answer":375,"analysis":33},939034,"工程网络计划工期优化的目的是为了（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":32},"缩短计算工期",{"key":24,"text":368,"correct":22},"寻求资源有限条件下的最短工期",{"key":27,"text":370,"correct":22},"寻求资源均衡条件下的最优工期",{"key":30,"text":372,"correct":22},"寻求最低成本时的最优工期",{"key":73,"text":374,"correct":32},"在一定约束条件下使工期最短","AE",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":30,"analysis":33},939035,"工程网络计划的工期优化是通过（ ），使计算工期满足要求工期。",[380,382,384,386],{"key":20,"text":381,"correct":22},"改变关键工作之间的逻辑关系",{"key":24,"text":383,"correct":22},"将关键工作压缩成非关键工作",{"key":27,"text":385,"correct":22},"压缩直接费最小的工作的持续时间",{"key":30,"text":387,"correct":32},"压缩关键工作的持续时间",{"id":389,"libraryId":5,"type":60,"typeLabel":61,"stem":390,"options":391,"answer":402,"analysis":33},939036,"进度计划的优化方法包括（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":32},"工期优化",{"key":24,"text":395,"correct":32},"费用优化",{"key":27,"text":397,"correct":22},"工艺优化",{"key":30,"text":399,"correct":22},"质量优化",{"key":73,"text":401,"correct":32},"资源优化","ABE",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":30,"analysis":33},939037,"在合理工期条件下进行工程费用优化，如果缩短工期将会引起工程（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"直接费和间接费同时增加",{"key":24,"text":410,"correct":22},"直接费减少，间接费增加",{"key":27,"text":412,"correct":22},"直接费和间接费同时减少",{"key":30,"text":414,"correct":32},"直接费增加，间接费减少",{"id":416,"libraryId":5,"type":60,"typeLabel":61,"stem":417,"options":418,"answer":402,"analysis":33},939038,"选择缩短持续时间的关键工作进行工程项目工期优化时，应优先选择（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":32},"对质量影响不大的工作",{"key":24,"text":422,"correct":32},"增加费用最少的工作",{"key":27,"text":424,"correct":22},"持续时间最长的工作",{"key":30,"text":426,"correct":22},"可以最后进行的工作",{"key":73,"text":428,"correct":32},"有充足备用资源的工作",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},939039,"在工程项目进度资源优化管理中，影响进度的主要因素是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"资源的需求情况",{"key":24,"text":436,"correct":22},"资源的配置情况",{"key":27,"text":438,"correct":22},"资源的利用情况",{"key":30,"text":440,"correct":32},"资源的供应情况",{"id":442,"libraryId":5,"type":60,"typeLabel":61,"stem":443,"options":444,"answer":455,"analysis":33},939040,"工程项目进度计划的资源优化是在现有资源条件下寻求（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"最优工期条件下的资源均衡",{"key":24,"text":448,"correct":32},"工期固定条件下的资源均衡",{"key":27,"text":450,"correct":32},"资源有限条件下的最短工期",{"key":30,"text":452,"correct":22},"资源均衡使用时的最短工期",{"key":73,"text":454,"correct":22},"最低成本条件下的最短工期","BC",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},939041,"某工程单代号网络计划中，M 工作的最早开始时间和最迟开始时间分别是第 12 天和第 15 天，其持续时间为 6 天，M 工作有 3 项紧后工作，它们的最早开始时间分别是第 21 天，第 24 天，第 28 天，则 M 工作的自由时差是（ ）天。",[460,462,464,466],{"key":20,"text":461,"correct":22},"1",{"key":24,"text":463,"correct":32},"3",{"key":27,"text":465,"correct":22},"4",{"key":30,"text":467,"correct":22},"8",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":30,"analysis":33},939042,"某双代号网络计划如下图所示，工作D 的总时差和自由时差分别为（ ）",[472,474,476,478],{"key":20,"text":473,"correct":22},"1天和1天",{"key":24,"text":475,"correct":22},"1天和2天",{"key":27,"text":477,"correct":22},"2天和1天",{"key":30,"text":479,"correct":32},"2天和2天",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},939043,"M 工作有2 个紧前工作，其持续时间分别是6 天和10 天，最早开工时间分别为第15 天和第20 天，则M 工作的最早开始时间为第（ ）天。",[484,486,488,490],{"key":20,"text":485,"correct":32},"30",{"key":24,"text":487,"correct":22},"26",{"key":27,"text":489,"correct":22},"25",{"key":30,"text":491,"correct":22},"21",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},939044,"某网络计划中，A 工作有两项紧后工作 B、 C，已知B 工作的最迟完成时间为24，持续时间为6 天；C 工作的最迟完成时间为28 天，持续时间为12 天，则A 工作的最迟完成时间是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":32},"16天",{"key":24,"text":499,"correct":22},"18天",{"key":27,"text":501,"correct":22},"24天",{"key":30,"text":503,"correct":22},"28天",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},939045,"某分部工程双代号时标网络计划如图9－16 所示，则工作B 的总时差和自由时差分别是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"0天，0天",{"key":24,"text":511,"correct":32},"2天，0天",{"key":27,"text":513,"correct":22},"2天，2天",{"key":30,"text":515,"correct":22},"4天，0天",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":30,"analysis":33},939046,"某工作网络计划中，N 工作的最早开始时间和最早完成时间分别为第5 天和第8 天，最迟开始时间和最迟完成时间分别为第7 天和第10 天，则工作N 的总时差为（ ）天。",[520,522,523,524],{"key":20,"text":521,"correct":22},"5",{"key":24,"text":465,"correct":22},{"key":27,"text":463,"correct":22},{"key":30,"text":525,"correct":32},"2",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},939047,"某工程项目实施过程的部分时间参数如下表所示： 其中，总时差最大的活动是（ ）。",[530,531,532,533],{"key":20,"text":24,"correct":22},{"key":24,"text":30,"correct":32},{"key":27,"text":73,"correct":22},{"key":30,"text":534,"correct":22},"G",{"id":536,"libraryId":5,"type":60,"typeLabel":61,"stem":537,"options":538,"answer":310,"analysis":33},939048,"下列关于制定工程项目进度计划方法的说法，错误的有（ ）",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"关键线路法假定项目进度计划中工作之间的逻辑关系是确定的，且每项工作只估算一个肯定的持续时间",{"key":24,"text":542,"correct":32},"关键线路法在考虑资源限制的前提下，计算所有工作理论上的最早开始与完成时间、最迟开始与完成时间",{"key":27,"text":544,"correct":22},"关键线路法中计算得到的最早开始与完成时间、最迟开始与完成时间不一定是项目工作最终的计划时间",{"key":30,"text":546,"correct":32},"使用关键路线法按最大可能时间估算制定的项目进度计划比使用计划评审技术制定的进度计划更符合实际情况",{"key":73,"text":548,"correct":22},"图示评审技术假定工作之间的逻辑关系及工作的持续时间都是不确定的",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},939049,"工程项目双代号网络计划如图所示，工作F 的最迟开始时间是（ ）天。",[553,554,556,557],{"key":20,"text":465,"correct":32},{"key":24,"text":555,"correct":22},"6",{"key":27,"text":467,"correct":22},{"key":30,"text":558,"correct":22},"10",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},939050,"在双代号或单代号网络计划中，工作的最早开始时间应为其所有紧前工作（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":32},"最早完成时间的最大值",{"key":24,"text":566,"correct":22},"最早完成时间的最小值",{"key":27,"text":568,"correct":22},"最迟完成时间的最大值",{"key":30,"text":570,"correct":22},"最迟完成时间的最小值",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},939051,"在双代号或单代号网络计划中，判别为关键工作的条件是该工作（ ）",[575,577,579,581],{"key":20,"text":576,"correct":22},"自由时差最小",{"key":24,"text":578,"correct":22},"与其紧后工作之间的时间间隔为零",{"key":27,"text":580,"correct":32},"最迟开始与最早开始时间的差值最小",{"key":30,"text":582,"correct":22},"资源消耗最多",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":27,"analysis":33},939052,"PERT 与 CPM 的根本区别在于 PERT 使用了（ ）时间估计。",[587,589,591,593],{"key":20,"text":588,"correct":22},"最大可能",{"key":24,"text":590,"correct":22},"平均",{"key":27,"text":592,"correct":32},"加权平均",{"key":30,"text":594,"correct":22},"最小可能",{"id":596,"libraryId":5,"type":60,"typeLabel":61,"stem":597,"options":598,"answer":75,"analysis":33},939053,"编制工程项目进度计划的方法主要有（ ）。",[599,601,603,604,606],{"key":20,"text":600,"correct":32},"关键线路法",{"key":24,"text":602,"correct":32},"计划评审技术",{"key":27,"text":196,"correct":22},{"key":30,"text":605,"correct":32},"图示评审技术",{"key":73,"text":607,"correct":22},"定额计算法",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":30,"analysis":33},939054,"工程项目进度管理中，计划评审技术对时间的估算采用（ ）估算方法。",[612,614,616,618],{"key":20,"text":613,"correct":22},"总时间",{"key":24,"text":615,"correct":22},"最大可能时间",{"key":27,"text":617,"correct":22},"阶段时间",{"key":30,"text":619,"correct":32},"加权平均时间",{"id":621,"libraryId":5,"type":60,"typeLabel":61,"stem":622,"options":623,"answer":634,"analysis":33},939055,"工程项目实际进度与计划进度的比较方法主要有（ ）",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"关键线路比较法",{"key":24,"text":627,"correct":32},"横道图比较法",{"key":27,"text":629,"correct":32},"S曲线比较法",{"key":30,"text":631,"correct":32},"前锋线比较法",{"key":73,"text":633,"correct":32},"列表比较法","BCDE",{"id":636,"libraryId":5,"type":60,"typeLabel":61,"stem":637,"options":638,"answer":649,"analysis":33},939056,"某工作的实际进度发生偏差，判断其对后续工作和总工期是否产生影响的依据有（ ）",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"工程资源的分布是否均衡",{"key":24,"text":642,"correct":22},"该工程的实际投资是否到位",{"key":27,"text":644,"correct":32},"该工作是否处于关键线路",{"key":30,"text":646,"correct":32},"进度偏差是否超过该工作的总时差",{"key":73,"text":648,"correct":32},"进度偏差是否超过该工作的自由时差","CDE",[651,654,657,660,663,666],{"id":15,"name":652,"category":7,"favorite":653},"领导干部任职前廉政法规知识测试题",92,{"id":655,"name":656,"category":7,"favorite":15},595,"建筑结构与设备",{"id":658,"name":659,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":661,"name":662,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":664,"name":665,"category":7,"favorite":8},534,"BIM工程师",{"id":667,"name":665,"category":7,"favorite":8},535]