[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":654},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,26,50,1948,[13,34,46,58,66,84,99,114,129,144,156,168,180,192,204,219,234,246,258,270,282,294,306,321,333,345,357,369,381,392,404,416,428,440,452,464,476,488,500,510,522,534,549,564,574,583,598,612,626,640],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},938957,1,"单选题","下列不属于建设工程施工合同文件的组成内容的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","技术标准",false,{"key":24,"text":25,"correct":22},"B","中标通知书",{"key":27,"text":28,"correct":22},"C","合同协议书",{"key":30,"text":31,"correct":32},"D","现场签证单",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},938958,"下列关于施工合同的表述，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"工程施工合同的标的是永久工程",{"key":24,"text":41,"correct":22},"合同当事人包括发包人.承包人和分包人",{"key":27,"text":43,"correct":32},"合同工期是指承包人在投标函中承诺完成合同工程所需的期限",{"key":30,"text":45,"correct":22},"双方如约定合同生效条件，则合同订立时间就是合同生效时间",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},938959,"监理人在收到索赔通知书或有关索赔的进一步证明材料后的（ ）天内，将索赔处理结果答复承包人。",[50,52,54,56],{"key":20,"text":51,"correct":22},"14",{"key":24,"text":53,"correct":22},"21",{"key":27,"text":55,"correct":22},"28",{"key":30,"text":57,"correct":32},"42",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},938960,"因承包人违约，监理人发出整改通知（ ）天后，承包人仍不纠正违约行为的，发包人可向承包人发出解除合同通知。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":67,"libraryId":5,"type":68,"typeLabel":69,"stem":70,"options":71,"answer":83,"analysis":33},938961,2,"多选题","2017 年版 FIDIC 合同条件，较 1999 年版的特点有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"在编排格式上统一化",{"key":24,"text":75,"correct":32},"通用条件将索赔与争端区分开",{"key":27,"text":77,"correct":22},"新版合同条件在文字上更加简明",{"key":30,"text":79,"correct":32},"加强和拓展了工程师的地位和作用",{"key":81,"text":82,"correct":32},"E","更加强调在风险与责任分配及各项处理程序上业主和承包商的对等关系","BDE",{"id":85,"libraryId":5,"type":68,"typeLabel":69,"stem":86,"options":87,"answer":98,"analysis":33},938962,"下列属于发包人的施工安全责任的有（ ）。",[88,90,92,94,96],{"key":20,"text":89,"correct":22},"分包人人员工程事故的",{"key":24,"text":91,"correct":32},"发包人应对其现场机构雇佣的全部人员的工伤事故",{"key":27,"text":93,"correct":32},"工程或工程的任何部分对土地的占用所造成的第三者财产损失",{"key":30,"text":95,"correct":32},"发包人原因在施工场地及其毗邻地带造成的第三者人身伤亡和财产损失",{"key":81,"text":97,"correct":22},"承包人原因在施工场地内及其毗邻地带造成的发包人.监理人以及第三者人员伤亡和财产损失","BCD",{"id":100,"libraryId":5,"type":68,"typeLabel":69,"stem":101,"options":102,"answer":113,"analysis":33},938963,"建设工程施工合同，按照承包序列划分，包括（ ）。",[103,105,107,109,111],{"key":20,"text":104,"correct":32},"施工总承包合同",{"key":24,"text":106,"correct":32},"专业分包合同",{"key":27,"text":108,"correct":32},"劳务分包合同",{"key":30,"text":110,"correct":22},"劳务总包合同",{"key":81,"text":112,"correct":22},"施工总承包管理合同","ABC",{"id":115,"libraryId":5,"type":68,"typeLabel":69,"stem":116,"options":117,"answer":128,"analysis":33},938964,"根据《标准勘察招标文件》，下列说法错误的有（ ）。",[118,120,122,124,126],{"key":20,"text":119,"correct":22},"发包人有义务及时支付合同价款",{"key":24,"text":121,"correct":22},"发包人有义务向勘察人发出开始勘察通知",{"key":27,"text":123,"correct":32},"发包人有义务编制安全防护方案并制定应急预案",{"key":30,"text":125,"correct":22},"勘察人有义务防止因勘察作业造成的人身伤害和财产损失",{"key":81,"text":127,"correct":32},"勘察人负责办理的工程建设项目必须履行的各类审批.核准或备案手续","CE",{"id":130,"libraryId":5,"type":68,"typeLabel":69,"stem":131,"options":132,"answer":143,"analysis":33},938965,"下列关于违约责任，发包人可书面通知承包人，立即解除合同的情形有（ ）。",[133,135,137,139,141],{"key":20,"text":134,"correct":32},"承包人无法继续履行合同",{"key":24,"text":136,"correct":32},"承包人明确表示不履行合同",{"key":27,"text":138,"correct":22},"承包人违法分包或者转包工程",{"key":30,"text":140,"correct":22},"承包人原因致使工程质量不达标",{"key":81,"text":142,"correct":22},"承包人未能按合同进度计划及时完成合同约定的工作","AB",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":20,"analysis":33},938966,"（ ）推荐用于由雇主或其代表－工程师设计的建筑或工程项目，主要用于单价合同。",[148,150,152,154],{"key":20,"text":149,"correct":32},"《施工合同条件》",{"key":24,"text":151,"correct":22},"“红皮书”",{"key":27,"text":153,"correct":22},"《简明合同格式》",{"key":30,"text":155,"correct":22},"“绿皮书”",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":27,"analysis":33},938967,"（ ）合同条件，项目的最终价格和要求的工期具有更大程度的确定性；由承包商承担项目实施的全部责任，雇主较少介入。",[160,162,164,166],{"key":20,"text":161,"correct":22},"红皮书",{"key":24,"text":163,"correct":22},"黄皮书",{"key":27,"text":165,"correct":32},"银皮书",{"key":30,"text":167,"correct":22},"绿皮书",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":20,"analysis":33},938968,"订立合同时双方当事人的权利和义务应当对等，这体现了工程项目合同管理中的( )原 则。",[172,174,176,178],{"key":20,"text":173,"correct":32},"公平",{"key":24,"text":175,"correct":22},"信用",{"key":27,"text":177,"correct":22},"公正",{"key":30,"text":179,"correct":22},"诚实",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":30,"analysis":33},938969,"关于工程项目合同的说法，错误的是( )。",[184,186,188,190],{"key":20,"text":185,"correct":22},"工程项目合同是一个合同群体",{"key":24,"text":187,"correct":22},"订立合同应遵循平等自愿原则",{"key":27,"text":189,"correct":22},"合同双方行为应遵守《招标投标法》",{"key":30,"text":191,"correct":32},"合同标的不限于项目涉及的内容",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},938970,"建设工程施工合同文件包括:①协议书;②投标书;③中标通知书;④合同通用条款； ⑤合 同专用条款；⑥工程量清单。当各合同文件对同一事项的解释出现不一致时，优先解释顺序为 ( )。",[196,198,200,202],{"key":20,"text":197,"correct":32},"①-③-②-⑤-④-⑥",{"key":24,"text":199,"correct":22},"②-③-①-⑤-④-⑥",{"key":27,"text":201,"correct":22},"③-②-①-④-⑥-⑤",{"key":30,"text":203,"correct":22},"②-①-③-⑤-⑥-④",{"id":205,"libraryId":5,"type":68,"typeLabel":69,"stem":206,"options":207,"answer":218,"analysis":33},938971,"根据《标准施工招标文件》，发包人的义务主要有( )。",[208,210,212,214,216],{"key":20,"text":209,"correct":32},"发出开工通知",{"key":24,"text":211,"correct":22},"保护施工场地",{"key":27,"text":213,"correct":32},"组织设计交底",{"key":30,"text":215,"correct":22},"缴纳工程税费",{"key":81,"text":217,"correct":32},"组织竣工验收","ACE",{"id":220,"libraryId":5,"type":68,"typeLabel":69,"stem":221,"options":222,"answer":233,"analysis":33},938972,"根据《标准施工招标文件》(2007年版)，承包人的义务主要有( )",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"支付合同价款",{"key":24,"text":226,"correct":32},"照管和维护未竣工工程",{"key":27,"text":228,"correct":32},"设计临时设施",{"key":30,"text":230,"correct":32},"保护施工场地周边环境",{"key":81,"text":232,"correct":32},"编制施工组织设计和施工措施计划","BCDE",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":30,"analysis":33},938973,"根据《标准施工招标文件》(2007 年版)，承包人可向发包人提出费用和(或)工期索赔， 但不能提出利润索赔的是( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"由于发包人的原因导致试运行失败的",{"key":24,"text":241,"correct":22},"发包人要求承包人提前竣工",{"key":27,"text":243,"correct":22},"由于发包人违约导致承包人暂停施工",{"key":30,"text":245,"correct":32},"发包人提供的材料不符合合同要求的",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},938974,"根据《标准施工招标文件》(2007 年版)，以下关于竣工验收与国家验收的说法，错误的 是( )。",[250,252,254,256],{"key":20,"text":251,"correct":32},"国家验收是竣工验收的一部分",{"key":24,"text":253,"correct":22},"竣工验收所采用的各项验收和评定标准应符合国家验收标准",{"key":27,"text":255,"correct":22},"竣工验收指承包人完成了全部合同工作后，发包人按合同要求进行的验收",{"key":30,"text":257,"correct":22},"国家验收是政府有关部门，针对发包人全面组织实施的整个工程正式交付投运前的验收",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},938975,"根据《标准施工招标文件》(2007 年版)，承包人向监理人报送竣工验收申请报告，工程 应具备的条件不包括( )。",[262,264,266,268],{"key":20,"text":263,"correct":22},"已按合同约定的内容和份数备齐了符合要求的竣工资料",{"key":24,"text":265,"correct":22},"已按监理人的要求编制了在缺陷责任期内完成的尾工工程工作清单",{"key":27,"text":267,"correct":22},"全部单位工程均已完成，并符合合同要求",{"key":30,"text":269,"correct":32},"监理人同意列入缺陷责任期内完成的缺陷修补工作全部完成",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},938976,"根据《标准施工招标文件》(2007 年版)，经验收合格工程的实际竣工日期，以( )为准， 并在工程接收证书中写明。",[274,276,278,280],{"key":20,"text":275,"correct":22},"发包人收到竣工验收申请报告 56 天",{"key":24,"text":277,"correct":22},"发包人实际占有日期",{"key":27,"text":279,"correct":22},"验收合格日期",{"key":30,"text":281,"correct":32},"承包人提交竣工验收申请报告的日期",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},938977,"根据《标准施工招标文件》(2007 年版)，关于缺陷责任期的表述错误的是( )。",[286,288,290,292],{"key":20,"text":287,"correct":22},"缺陷责任期自实际竣工日期起计算",{"key":24,"text":289,"correct":22},"缺陷责任期最长不超过 2 年",{"key":27,"text":291,"correct":32},"缺陷责任期届满，承包人保修义务终止",{"key":30,"text":293,"correct":22},"缺陷责任期终止后 14 天内退还剩余质量保证金",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},938978,"根据《标准施工招标文件》(2007 年版)，关于缺陷责任的表述错误的是( )。",[298,300,302,304],{"key":20,"text":299,"correct":22},"承包人应在缺陷责任期内对已交付使用的工程承担缺陷责任",{"key":24,"text":301,"correct":22},"缺陷责任期内，发包人对已接收使用的工程负责日常维护工作",{"key":27,"text":303,"correct":22},"缺陷责任期内，经查明缺陷属承包人原因造成的，应由承包人承担修复和查验的费用",{"key":30,"text":305,"correct":32},"缺陷责任期内，承包人不能在合理时间内修复缺陷的，发包人可自行修复，所需费用由承 包人承担",{"id":307,"libraryId":5,"type":68,"typeLabel":69,"stem":308,"options":309,"answer":320,"analysis":33},938979,"关于 FIDIC 合同条件中合同担保的说法，正确的有( )。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"履约保函的有效期至工程师颁发工程接受证书时止",{"key":24,"text":313,"correct":32},"预付款保函为不需承包商确认违约的无条件担保形式",{"key":27,"text":315,"correct":22},"通用条件中明确规定了业主可凭保函索赔的 5 种情形",{"key":30,"text":317,"correct":32},"承包商接受预付款前应提供预付款担保",{"key":81,"text":319,"correct":22},"承包商签订合同后应提供履约担保","BD",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},938980,"下列不属于施工合同履行过程中，承包人义务的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":32},"按合同约定及时组织竣工验收",{"key":24,"text":328,"correct":22},"对施工场地和周围环境进行查勘",{"key":27,"text":330,"correct":22},"避免对邻近的公共设施产生干扰",{"key":30,"text":332,"correct":22},"保证其履约担保在发包人颁发工程接收证书前一直有效",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},938981,"发包人应在（ ）颁发后 28 天内把履约担保退还给承包人。",[337,339,341,343],{"key":20,"text":338,"correct":22},"开工报告",{"key":24,"text":340,"correct":22},"履约保证书",{"key":27,"text":342,"correct":32},"工程接收证书",{"key":30,"text":344,"correct":22},"竣工验收报告",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},938982,"承包人未通知监理人到场检查，私自将工程隐蔽部位覆盖的，监理人有权指示承包人钻孔探测或者揭开检查，无论工程隐蔽部分质量是否合格，由此增加的费用和（或）延误的工期由（ ）承担。",[349,351,353,355],{"key":20,"text":350,"correct":22},"监理人",{"key":24,"text":352,"correct":22},"发包人",{"key":27,"text":354,"correct":32},"承包人",{"key":30,"text":356,"correct":22},"监督机构",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":30,"analysis":33},938983,"监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的（ ）天内完成审查；发包人应在监理人收到进度付款申请单后的（ ）天内将进度应付款支付给承包人。",[361,363,365,367],{"key":20,"text":362,"correct":22},"7；7",{"key":24,"text":364,"correct":22},"7；14",{"key":27,"text":366,"correct":22},"14；14",{"key":30,"text":368,"correct":32},"14；28",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},938984,"下列关于变更权的表述，正确的是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"只有发包人可以提出变更，监理人负责通知",{"key":24,"text":376,"correct":22},"监理人签认的变更指示是可实施变更的最终依据",{"key":27,"text":378,"correct":32},"承包人收到变更指示后，应按变更指示进行变更工作",{"key":30,"text":380,"correct":22},"承包人可以根据经验对工程的非重要部分直接实施变更",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},938985,"下列关于工程项目合同特点的表述，错误的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"合同庞大复杂",{"key":24,"text":388,"correct":32},"合同主体可以是公民",{"key":27,"text":390,"correct":22},"订立合同一般采用书面形式",{"key":30,"text":185,"correct":22},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},938986,"建设工程合同应当采用（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":32},"书面形式",{"key":24,"text":399,"correct":22},"口头形式",{"key":27,"text":401,"correct":22},"自拟形式",{"key":30,"text":403,"correct":22},"其他形式",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":30,"analysis":33},938987,"根据《招标投标法》的规定，中标通知书发出之日起（ ）日，就是合同双方主体进行合同谈判的时间。",[408,410,412,414],{"key":20,"text":409,"correct":22},"10",{"key":24,"text":411,"correct":22},"15",{"key":27,"text":413,"correct":22},"20",{"key":30,"text":415,"correct":32},"30",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},938988,"在变更工作的估价中，已标价工程量清单中无适用于变更工作的子目，但有类似子目的，（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"采用类似子目的单价",{"key":24,"text":423,"correct":32},"参照类似子目的单价",{"key":27,"text":425,"correct":22},"由承包人结合造价信息以及报价浮动率确定单价",{"key":30,"text":427,"correct":22},"由总监理工程师与合同当事人商定或确定变更工作的单价",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":27,"analysis":33},938989,"工程施工合同的标的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"货物",{"key":24,"text":435,"correct":22},"服务",{"key":27,"text":437,"correct":32},"工程",{"key":30,"text":439,"correct":22},"施工",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},938990,"下列事件中，承包人即可得到费用补偿又可得到利润补偿的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"遇到不利物质条件",{"key":24,"text":447,"correct":22},"异常恶劣的气候条件导致工期延误",{"key":27,"text":449,"correct":32},"属发包人原因造成的工程缺陷或损坏",{"key":30,"text":451,"correct":22},"发包人提供的材料或工程设备不符合合同要求",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},938991,"根据《标准施工招标文件》中合同条款的规定，下列可以同时补偿承包人工期、费用和利润的索赔事项是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"采取合同未约定的安全作业环境及安全施工措施的",{"key":24,"text":459,"correct":32},"因发包人原因造成工程质量达不到合同约定验收标准的",{"key":27,"text":461,"correct":22},"监理人未能按合同约定发出指示.指示延误或指示错误的",{"key":30,"text":463,"correct":22},"发包人提供的材料和工程设备，要求向承包人提前交货的",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},938992,"有关合同价款的说法，正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"合同价款即签约合同价",{"key":24,"text":471,"correct":22},"合同价款即合同价格",{"key":27,"text":473,"correct":32},"合同价格包括履行合同过程中所进行的变更和调整",{"key":30,"text":475,"correct":22},"最终结算的合同价款即签约合同价",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},938993,"合同双方主体进行合同谈判的时间是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"投标有效期满 30 日",{"key":24,"text":483,"correct":32},"中标通知书发出之日起 30 日",{"key":27,"text":485,"correct":22},"合同签订之日起 30 日",{"key":30,"text":487,"correct":22},"招投标备案之日起 30 日",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},938994,"承包人的履约担保期限至（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"工程竣工验收合格",{"key":24,"text":495,"correct":22},"工程竣工结算完毕",{"key":27,"text":497,"correct":32},"发包人颁发工程接收证书",{"key":30,"text":499,"correct":22},"发包人颁发最终结清证书",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},938995,"根据《标准施工招标文件》（2007 年版），合同进度计划是指经（ ）批准的施工进度计划。",[504,506,507,508],{"key":20,"text":505,"correct":22},"监督人",{"key":24,"text":354,"correct":22},{"key":27,"text":350,"correct":32},{"key":30,"text":509,"correct":22},"投资人",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":30,"analysis":33},938996,"下列关于工程隐蔽部位覆盖前的检查说法错误的是（ ）",[514,516,518,520],{"key":20,"text":515,"correct":22},"工程隐蔽部位施工作业完成后，必须在覆盖前由承包人先行自检",{"key":24,"text":517,"correct":22},"工程隐蔽部位经监理人检查合格并签证后，才能进行下一道工序",{"key":27,"text":519,"correct":22},"承包人私自覆盖的工程，监理人有权指示承包人进行补检，无论结果如何，责任均由承包人承担",{"key":30,"text":521,"correct":32},"由发包人提供的材料或工程设备不合格造成的工程不合格的，由发包人采取补救措施",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},938997,"由于发包人提供的材料或工程设备不合格造成的工程不合格，需要承包人采取措施补救的，发包人应（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":32},"承担由此增加的费用和（或）工期延误，并支付承包合理利润",{"key":24,"text":529,"correct":22},"承担由此增加的费用和（或）工期延误，不支付承包合理利润",{"key":27,"text":531,"correct":22},"承担由此增加的费用，工期延误和利润损失承包人承担",{"key":30,"text":533,"correct":22},"承担由此增加的费用和承包人利润损失，工期不予延误",{"id":535,"libraryId":5,"type":68,"typeLabel":69,"stem":536,"options":537,"answer":548,"analysis":33},938998,"根据《标准施工招标文件》，合同附件包括（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":32},"履约担保格式",{"key":24,"text":541,"correct":22},"投标保证金形式",{"key":27,"text":543,"correct":32},"预付款担保格式",{"key":30,"text":545,"correct":22},"工程款支付担保方式",{"key":81,"text":547,"correct":22},"质量保证金方式","AC",{"id":550,"libraryId":5,"type":68,"typeLabel":69,"stem":551,"options":552,"answer":563,"analysis":33},938999,"有关合同工期、质量、价款说法，正确的是（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":32},"三者是合同的实质性条款",{"key":24,"text":556,"correct":22},"合同工期指发包人要求承包人完成合同工程所需的期限",{"key":27,"text":558,"correct":32},"质量标准是合同协议书中的核心内容",{"key":30,"text":560,"correct":32},"发包人不得以任何理由降低工程质量",{"key":81,"text":562,"correct":22},"由于分包人原因造成工期延误，承包人有权要求发包人延长工期","ACD",{"id":565,"libraryId":5,"type":68,"typeLabel":69,"stem":566,"options":567,"answer":218,"analysis":33},939000,"发包人的义务主要有（ ）。",[568,570,571,572,573],{"key":20,"text":569,"correct":32},"提供施工场地",{"key":24,"text":211,"correct":22},{"key":27,"text":213,"correct":32},{"key":30,"text":215,"correct":22},{"key":81,"text":217,"correct":32},{"id":575,"libraryId":5,"type":68,"typeLabel":69,"stem":576,"options":577,"answer":98,"analysis":33},939001,"根据《标准施工招标文件》（2007 年版），承包人的义务主要有（ ）。",[578,579,580,581,582],{"key":20,"text":209,"correct":22},{"key":24,"text":226,"correct":32},{"key":27,"text":228,"correct":32},{"key":30,"text":230,"correct":32},{"key":81,"text":217,"correct":22},{"id":584,"libraryId":5,"type":68,"typeLabel":69,"stem":585,"options":586,"answer":597,"analysis":33},939002,"根据《标准施工招标文件》（2007 年版），在履行合同过程中，由于（ ）原因造成工期延误的，承包人有权要求发包人延长工期和（或）增加费用，并支付合理利润。",[587,589,591,593,595],{"key":20,"text":588,"correct":32},"发包人增加合同工作内容",{"key":24,"text":590,"correct":32},"发包人改变合同中任何一项工作的质量要求或其他特性",{"key":27,"text":592,"correct":32},"发包人迟延提供材料、工程设备或变更交货地点的",{"key":30,"text":594,"correct":32},"因发包人原因导致的暂停施工",{"key":81,"text":596,"correct":22},"出现合同约定的异常恶劣气候的条件","ABCD",{"id":599,"libraryId":5,"type":68,"typeLabel":69,"stem":600,"options":601,"answer":597,"analysis":33},939003,"下列关于发包人和承包人施工安全责任的说法，正确的是（ ）。",[602,604,606,608,610],{"key":20,"text":603,"correct":32},"发包人应对其现场机构雇佣的全部人员的工伤事故承担责任",{"key":24,"text":605,"correct":32},"由于承包人原因造成发包人人员工伤的，应由承包人承担责任",{"key":27,"text":607,"correct":32},"承包人应对其履行合同所雇佣的全部人员，包括分包人人员的工伤事故承担责任",{"key":30,"text":609,"correct":32},"由于发包人原因造成承包人人员工伤事故的，应由发包人承担责任",{"key":81,"text":611,"correct":22},"工程或工程的任何部分对土地的占用所造成的第三者财产损失，承包人应负责赔偿",{"id":613,"libraryId":5,"type":68,"typeLabel":69,"stem":614,"options":615,"answer":218,"analysis":33},939004,"预付款的用途包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":32},"用于承包人为合同工程施工购置材料",{"key":24,"text":619,"correct":22},"用于承包人完成零星工程",{"key":27,"text":621,"correct":32},"用于承包人修建临时设施",{"key":30,"text":623,"correct":22},"用于承包人对分包商付款",{"key":81,"text":625,"correct":32},"用于承包人组织施工队伍进场",{"id":627,"libraryId":5,"type":68,"typeLabel":69,"stem":628,"options":629,"answer":218,"analysis":33},939005,"有关工程进度款支付，下列说法正确的是（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":32},"付款周期应按照约定与计量周期保持一致",{"key":24,"text":633,"correct":22},"承包人应在每个付款周期开始向监理人提交进度付款申请单",{"key":27,"text":635,"correct":32},"监理人在收到承包人进度付款申请单后的 14 天内完成核查",{"key":30,"text":637,"correct":22},"监理人出具进度付款证书标明其已同意承包人完成的该部分工作",{"key":81,"text":639,"correct":32},"发包人应在监理人收到进度付款申请单后的 28 天内将进度应付款支付给承包人",{"id":641,"libraryId":5,"type":68,"typeLabel":69,"stem":642,"options":643,"answer":113,"analysis":33},939006,"FIDIC 合同中，合同通用条件的条款中规定，可以给承包商合理延长合同工期的条件通常包括（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":32},"延误发放图纸",{"key":24,"text":647,"correct":32},"延误移交施工现场",{"key":27,"text":649,"correct":32},"不可预见的外界条件",{"key":30,"text":651,"correct":22},"因施工作业所引起的污染",{"key":81,"text":653,"correct":22},"对公众所造成的损害",[655,658,661,664,667,670],{"id":15,"name":656,"category":7,"favorite":657},"领导干部任职前廉政法规知识测试题",92,{"id":659,"name":660,"category":7,"favorite":15},595,"建筑结构与设备",{"id":662,"name":663,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":665,"name":666,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":668,"name":669,"category":7,"favorite":8},534,"BIM工程师",{"id":671,"name":669,"category":7,"favorite":8},535]