[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":666},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,25,50,1948,[13,34,46,58,70,82,94,106,118,126,138,150,162,174,186,204,219,234,249,264,279,294,309,324,338,353,368,382,396,410,424,439,451,463,475,487,499,511,523,535,547,559,571,583,595,607,619,630,642,654],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},938907,1,"单选题","下列关于FIDIC施工合同条件下缺陷通知期的说法，错误的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","缺陷通知期即国内施工文本所指的工程保修期",true,{"key":24,"text":25,"correct":26},"B","缺陷通知期自工程接收证书中写明的竣工日开始",false,{"key":28,"text":29,"correct":26},"C","缺陷通知期为考验工程动态进行中是否达到合同要求而设置",{"key":31,"text":32,"correct":26},"D","缺陷通知期内工程出现质量问题由承包商负责","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},938908,"合同一方不得把自己的意愿强加于另一方，这是合同管理（ ）原则的要求。",[38,40,42,44],{"key":20,"text":39,"correct":26},"诚实信用",{"key":24,"text":41,"correct":22},"平等自愿",{"key":28,"text":43,"correct":26},"等价有偿",{"key":31,"text":45,"correct":26},"公平公正",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},938909,"有关工程监理合同的说法，不正确的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":26},"监理合同是委托合同的一种",{"key":24,"text":53,"correct":26},"工程监理合同必须采取书面形式",{"key":28,"text":55,"correct":22},"监理合同的标的是施工",{"key":31,"text":57,"correct":26},"监理人与委托人、承包人之间分别形成不同的法律关系",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},938910,"由监理人委派常驻施工现场对合同进行实施管理的全权负责人是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"监理工程师",{"key":24,"text":65,"correct":22},"总监理工程师",{"key":28,"text":67,"correct":26},"项目经理",{"key":31,"text":69,"correct":26},"技术负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},938911,"合同变更指示通过（ ）发出。",[74,76,78,80],{"key":20,"text":75,"correct":26},"发包人",{"key":24,"text":77,"correct":26},"承包人",{"key":28,"text":79,"correct":22},"监理人",{"key":31,"text":81,"correct":26},"设计人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},938912,"承包人应在知道或应当知道索赔事件发生后（ ），向监理人递交索赔意向通知书。",[86,88,90,92],{"key":20,"text":87,"correct":26},"14 天内",{"key":24,"text":89,"correct":22},"28 天内",{"key":28,"text":91,"correct":26},"14 天后",{"key":31,"text":93,"correct":26},"28 天后",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},938913,"经验收合格工程的实际竣工日期，以（ ）为准。",[98,100,102,104],{"key":20,"text":99,"correct":26},"验收合格日期",{"key":24,"text":101,"correct":22},"提交竣工验收申请报告的日期",{"key":28,"text":103,"correct":26},"组织竣工验收日期",{"key":31,"text":105,"correct":26},"发包人使用日期",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},938914,"关于质量保证金的说法，不正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"在工程项目竣工前，已经缴纳履约保证金的，发包人不得同时预留工程质量保证金",{"key":24,"text":113,"correct":26},"采用工程质量保证担保、工程质量保险等其他保证方式的，发包人不得再预留保证金",{"key":28,"text":115,"correct":22},"保证金总预留比例不得高于工程价款结算总额的 5%",{"key":31,"text":117,"correct":26},"合同可以约定由承包人以银行保函替代预留保证金",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},938915,"发包人违约后，收到承包人通知后的（ ）仍不履行合同义务，承包人有权暂停施工。",[122,123,124,125],{"key":20,"text":87,"correct":26},{"key":24,"text":89,"correct":22},{"key":28,"text":91,"correct":26},{"key":31,"text":93,"correct":26},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},938916,"货物采购合同的预付款是在合同生效后，买方在收到卖方开具的注明应付预付款金额的财务收据正本一份并经审核无误后（ ）内，向卖方支付签约合同价的（ ）作为预付款。",[130,132,134,136],{"key":20,"text":131,"correct":26},"14 天内；10%",{"key":24,"text":133,"correct":22},"28 天内；10%",{"key":28,"text":135,"correct":26},"14 天内；20%",{"key":31,"text":137,"correct":26},"28 天内；20%",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},938917,"如由于买方原因在最后一批合同设备交货后 6 个月内未能开始考核，则买卖双方应在上述期限届满后（ ）签署验收款支付函。",[142,144,146,148],{"key":20,"text":143,"correct":22},"7 日内",{"key":24,"text":145,"correct":26},"14 日内",{"key":28,"text":147,"correct":26},"21 日内",{"key":31,"text":149,"correct":26},"28 日内",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},938918,"根据 FIDIC《施工合同条件》，承包商完成建造和保修任务后，对所有合格工程有权获得的全部工程款称为（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"合同价格",{"key":24,"text":157,"correct":26},"接受的合同款额",{"key":28,"text":159,"correct":26},"合同结算价格",{"key":31,"text":161,"correct":26},"合同决算价格",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},938919,"关于 FIDIC 指定分包商的说法，正确的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"指定分包商可由工程师选定",{"key":24,"text":169,"correct":26},"指定分包商应与业主签订合同",{"key":28,"text":171,"correct":26},"指定分包商不能提出工程技术服务",{"key":31,"text":173,"correct":26},"承包商不负责对指定分包商的监督",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},938920,"FIDIC 中有关施工进度管理说法，正确的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"合同未作约定时，承包商应在接到中标函后的 28 天内开工",{"key":24,"text":181,"correct":22},"工程师应至少提前 7 天通知承包商开工日期",{"key":28,"text":183,"correct":26},"承包商收到开工通知后的 14 天内，提交施工进度计划",{"key":31,"text":185,"correct":26},"进度计划应按月列出根据合同预计应支付给承包人费用的资金估算表",{"id":187,"libraryId":5,"type":188,"typeLabel":189,"stem":190,"options":191,"answer":203,"analysis":33},938921,2,"多选题","合同履行过程中发生以下情形的，应按照合同约定进行变更（ ）。",[192,194,196,198,200],{"key":20,"text":193,"correct":22},"增加或减少合同中任何工作",{"key":24,"text":195,"correct":26},"专业分包",{"key":28,"text":197,"correct":22},"质量标准改变",{"key":31,"text":199,"correct":22},"改变工程的基线、标高、位置和尺寸",{"key":201,"text":202,"correct":26},"E","改变安全技术措施","ACD",{"id":205,"libraryId":5,"type":188,"typeLabel":189,"stem":206,"options":207,"answer":218,"analysis":33},938922,"有关索赔的说法，正确的是（ ）。",[208,210,212,214,216],{"key":20,"text":209,"correct":22},"并非由于自己的过错，由合同对方承担责任的情况造成",{"key":24,"text":211,"correct":26},"实际发生损失或者预期会发生损失",{"key":28,"text":213,"correct":26},"损失结果与被索赔人的行为存在因果关系",{"key":31,"text":215,"correct":26},"由合同当事人一方引起",{"key":201,"text":217,"correct":22},"性质属于经济补偿","AE",{"id":220,"libraryId":5,"type":188,"typeLabel":189,"stem":221,"options":222,"answer":233,"analysis":33},938923,"承包人向发包人可索赔费用和工期，不可索赔利润的情形有（ ）。",[223,225,227,229,231],{"key":20,"text":224,"correct":22},"发现文物",{"key":24,"text":226,"correct":22},"监理指示错误",{"key":28,"text":228,"correct":26},"异常恶劣气候条件导致工期延误",{"key":31,"text":230,"correct":22},"遇到不利物质条件",{"key":201,"text":232,"correct":26},"不可抗力","ABD",{"id":235,"libraryId":5,"type":188,"typeLabel":189,"stem":236,"options":237,"answer":248,"analysis":33},938924,"因发包人违约解除合同后，发包人应向承包人支付下列金额的付款（ ）。",[238,240,242,244,246],{"key":20,"text":239,"correct":26},"签约合同价款",{"key":24,"text":241,"correct":22},"承包人为该工程施工订购并已付款的材料、工程设备和其他物品的金额",{"key":28,"text":243,"correct":22},"承包人撤离施工场地的费用",{"key":31,"text":245,"correct":22},"承包人因合同解除所受的损失",{"key":201,"text":247,"correct":26},"预付工程款","BCD",{"id":250,"libraryId":5,"type":188,"typeLabel":189,"stem":251,"options":252,"answer":263,"analysis":33},938925,"因承包人违约解除合同后的处理包括（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"监理人按合同商定或确定承包人实际完成工作的价值",{"key":24,"text":256,"correct":22},"发包人应暂停对承包人的一切付款",{"key":28,"text":258,"correct":22},"发包人应查清各项付款和已扣款金额",{"key":31,"text":260,"correct":22},"发包人应按合同约定向承包人索赔由于解除合同给发包人造成的损失",{"key":201,"text":262,"correct":26},"发包人出具最终支付证书，支付全部合同款项","ABCD",{"id":265,"libraryId":5,"type":188,"typeLabel":189,"stem":266,"options":267,"answer":278,"analysis":33},938926,"关于货物采购合同中的监造，下列说法正确的是（ ）。",[268,270,272,274,276],{"key":20,"text":269,"correct":26},"无论合同有无约定，买方均可派人监造",{"key":24,"text":271,"correct":26},"买方监造人员可随时进行监造",{"key":28,"text":273,"correct":22},"买方监造人员的交通、食宿费用由买方承担",{"key":31,"text":275,"correct":26},"买方应提前 7 日将需要现场监造事项通知卖方",{"key":201,"text":277,"correct":22},"买方监造人员对合同设备的监造，不视为对合同设备质量的确认","CE",{"id":280,"libraryId":5,"type":188,"typeLabel":189,"stem":281,"options":282,"answer":293,"analysis":33},938927,"有关货物采购合同的交货，下列说法正确的是（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":26},"卖方在施工单位仓库交货",{"key":24,"text":286,"correct":26},"卖方负责卸货",{"key":28,"text":288,"correct":22},"买方签发收货清单不代表对合同设备的接受",{"key":31,"text":290,"correct":22},"合同设备的所有权和风险自交付时起由卖方转移至买方",{"key":201,"text":292,"correct":22},"卖方应在收到买方的通知后 7 日内免费补齐短缺和（或）损坏的部分","CDE",{"id":295,"libraryId":5,"type":188,"typeLabel":189,"stem":296,"options":297,"answer":308,"analysis":33},938928,"有关货物采购合同的开箱检验交货，下列说法正确的是（ ）。",[298,300,302,304,306],{"key":20,"text":299,"correct":22},"开箱检验应在施工场地进行",{"key":24,"text":301,"correct":26},"卖方参加开箱检验费用由买方承担",{"key":28,"text":303,"correct":26},"如果卖方代表事先通知不能参加开箱检验，视为卖方接受买方开箱检验结果",{"key":31,"text":305,"correct":22},"开箱检验的检验结果不能对抗在合同设备的安装、调试、考核、验收中发现的合同设备质量问题",{"key":201,"text":307,"correct":22},"开箱检验的检验结果不能免除卖方负有的设备质量责任","ADE",{"id":310,"libraryId":5,"type":188,"typeLabel":189,"stem":311,"options":312,"answer":323,"analysis":33},938929,"货物催交工作中，咨询工程师的主要工作包括（ ）。",[313,315,317,319,321],{"key":20,"text":314,"correct":22},"督促供货人按期提交货物",{"key":24,"text":316,"correct":26},"向供货人提交制造进度表",{"key":28,"text":318,"correct":22},"检查货物装运准备情况",{"key":31,"text":320,"correct":22},"检查货物关键工序生产情况",{"key":201,"text":322,"correct":22},"检查供货人原材料采购进展情况","ACDE",{"id":325,"libraryId":5,"type":188,"typeLabel":189,"stem":326,"options":327,"answer":263,"analysis":33},938930,"下列关于合同生效的说法正确的是（ ）。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"依法成立的合同，自成立时生效",{"key":24,"text":331,"correct":22},"当事人对合同的效力可以约定附条件",{"key":28,"text":333,"correct":22},"当事人采用合同书形式订立合同的，自双方当事人签字或盖章时合同成立",{"key":31,"text":335,"correct":22},"合同订立地点指合同双方签字盖章的地点",{"key":201,"text":337,"correct":26},"合同订立的时间就是合同生效的时间",{"id":339,"libraryId":5,"type":188,"typeLabel":189,"stem":340,"options":341,"answer":352,"analysis":33},938931,"在履行合同过程中，由于发包人的下列（ ）原因造成勘察服务期限延误的，发包人应当延长勘察服务期限并增加勘察费用。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"合同变更",{"key":24,"text":345,"correct":22},"未按合同约定期限及时答复勘察事项",{"key":28,"text":347,"correct":22},"提供的基准资料错误",{"key":31,"text":349,"correct":26},"异常恶劣气候条件",{"key":201,"text":351,"correct":26},"发现地下文物或化石","ABC",{"id":354,"libraryId":5,"type":188,"typeLabel":189,"stem":355,"options":356,"answer":367,"analysis":33},938932,"除合同另有约定外，勘察合同价格应当包括的费用有（ ）。",[357,359,361,363,365],{"key":20,"text":358,"correct":26},"发包人要求勘察人进行外出考察所花费用",{"key":24,"text":360,"correct":22},"收集资料，踏勘现场，制订纲要所需费用",{"key":28,"text":362,"correct":26},"专项咨询费用",{"key":31,"text":364,"correct":22},"进行测绘、勘探、取样、试验费用",{"key":201,"text":366,"correct":22},"文明施工，环境保护费用","BDE",{"id":369,"libraryId":5,"type":188,"typeLabel":189,"stem":370,"options":371,"answer":352,"analysis":33},938933,"设计合同的阶段范围包括（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"方案设计",{"key":24,"text":375,"correct":22},"初步设计",{"key":28,"text":377,"correct":22},"施工图设计",{"key":31,"text":379,"correct":26},"编制设计概算",{"key":201,"text":381,"correct":26},"提供技术交底",{"id":383,"libraryId":5,"type":188,"typeLabel":189,"stem":384,"options":385,"answer":233,"analysis":33},938934,"关于监理合同的合同价格，下列说法正确的是（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"签约合同价指合同协议书中写明的监理报酬总金额",{"key":24,"text":389,"correct":22},"合同价格指监理人按合同约定完成了全部监理工作后，委托人应付给监理人的金额",{"key":28,"text":391,"correct":26},"合同价格不包括履行合同过程中的变更和调整",{"key":31,"text":393,"correct":22},"费用指为履行合同所发生的或将要发生的所有合理开支",{"key":201,"text":395,"correct":26},"费用包括管理费、利润和应分摊的其他费用",{"id":397,"libraryId":5,"type":188,"typeLabel":189,"stem":398,"options":399,"answer":308,"analysis":33},938935,"有关争端裁决委员会的表述正确的有（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"业主与承包商协商组成裁决委员会",{"key":24,"text":403,"correct":26},"裁决委员会至少有 3 名成员",{"key":28,"text":405,"correct":26},"签订合同时，业主和承包商各提名一名成员，直接作为裁决委员会成员",{"key":31,"text":407,"correct":22},"争端裁决委员会属于非强制性但具有法律效力的行为",{"key":201,"text":409,"correct":22},"争端裁决委员会的性质属于个人委托",{"id":411,"libraryId":5,"type":188,"typeLabel":189,"stem":412,"options":413,"answer":293,"analysis":33},938936,"根据 FIDIC 施工合同条件，下列关于预付款的表述中，正确的包括（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":26},"预付款的具体金额在招标文件中确认",{"key":24,"text":417,"correct":26},"预付款应不少于合同总价的 20%",{"key":28,"text":419,"correct":22},"工程师在 21 天内签发预付款支付证书",{"key":31,"text":421,"correct":22},"预付款在支付工程进度款时按比例扣减",{"key":201,"text":423,"correct":22},"预付款保函金额始终保持与预付款等额",{"id":425,"libraryId":5,"type":188,"typeLabel":189,"stem":426,"options":427,"answer":438,"analysis":33},938937,"有关业主对工程进度款的支付，正确的有（ ）。",[428,430,432,434,436],{"key":20,"text":429,"correct":26},"承包商的报表经过工程师认可后业主应支付",{"key":24,"text":431,"correct":22},"业主应在接到进度款支付证书后及时给承包商付款",{"key":28,"text":433,"correct":26},"业主的付款时间不应超过工程师签发支付证书后的 56 天",{"key":31,"text":435,"correct":22},"如果逾期支付业主将承担延期付款的违约责任",{"key":201,"text":437,"correct":26},"延期付款的利息按银行存款利率加 3%计算","BD",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},938938,"在 FIDIC 施工合同条件中，预付款担保应采用（ ）提供的保函",[443,445,447,449],{"key":20,"text":444,"correct":26},"保险机构",{"key":24,"text":446,"correct":22},"金融机构",{"key":28,"text":448,"correct":26},"中央银行",{"key":31,"text":450,"correct":26},"政府有关部门",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},938939,"下列关于 FIDIC 合同担保的表述，错误的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"通用条件的条款中明确规定业主应向承包商提供支付保函",{"key":24,"text":458,"correct":26},"担保书的格式分为企业法人提供的保证书和金融机构提供的保函两类格式",{"key":28,"text":460,"correct":26},"合同条款规定，承包人签订合同时应提供履约担保，接受预付款前应提供预付款担保",{"key":31,"text":462,"correct":26},"履约保函应担保承包商圆满完成施工和保修的义务，而非到工程师颁发工程接收证书为止",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},938940,"下列关于 FIDIC 合同条款，有关施工进度管理的表述，正确的是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"承包商每个月应向工程师提交进度报告",{"key":24,"text":470,"correct":26},"工程师应按承包商要求，编制施工进度计划",{"key":28,"text":472,"correct":26},"对于不可抗力的事件，不得允许合同工期的顺延",{"key":31,"text":474,"correct":26},"承包商应在合同约定的日斯或揆到中标函后的 28 天内（合同未作约定）开工",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":28,"analysis":33},938941,"下列关于 FIDIC 合同条款中，关于竣工验收阶段合同管理的表述，正确的是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"承包商应提前 14 天将某一确定的竣工检验日期通知工程师",{"key":24,"text":482,"correct":26},"工程师应在收到承包商报送资料后的 14 天内进行竣工检验",{"key":28,"text":484,"correct":22},"工程师应在承包商所确定的竣工检验日期后 14 天内进行竣工检验",{"key":31,"text":486,"correct":26},"工程师应在承包商确定竣工检验日期事宜后 21 天内进行竣工检验",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},938942,"FIDIC 施工合同条件下，如果逾期支付工程进度款，业主将承担延期付款的违约责任，延期付款的利息按（ ）计算。",[491,493,495,497],{"key":20,"text":492,"correct":26},"央行准备金率加 3%",{"key":24,"text":494,"correct":26},"银行贷款利率加 2%",{"key":28,"text":496,"correct":22},"银行贷款利率加 3%",{"key":31,"text":498,"correct":26},"银行存款利率加 2%",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},938943,"FIDIC 是基于绿地设计—建造—运营方案来编写《设计- 建造和运营合同条件》的，项目建成后的运营期一般为（ ）年。",[503,505,507,509],{"key":20,"text":504,"correct":22},"20",{"key":24,"text":506,"correct":26},"40",{"key":28,"text":508,"correct":26},"50",{"key":31,"text":510,"correct":26},"70",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},938944,"（ ）贯穿于工程项目实施的全过程，在项目建设的各阶段都必须用此来约束各方的责任、权利和义务。",[515,517,519,521],{"key":20,"text":516,"correct":22},"合同管理",{"key":24,"text":518,"correct":26},"安全管理",{"key":28,"text":520,"correct":26},"进度管理",{"key":31,"text":522,"correct":26},"费用管理",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},938945,"（ ）是规范我国市场经济财产流转关系的基本法，工程项目合同的订立和履行也要遵守其基本规定。",[527,529,531,533],{"key":20,"text":528,"correct":26},"《物权法》",{"key":24,"text":530,"correct":22},"《合同法》",{"key":28,"text":532,"correct":26},"《建筑法》",{"key":31,"text":534,"correct":26},"《招标投标法》",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},938946,"下列关于争议评审的表述，正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"提请争议评审组评审，是解决合同争议的最佳方式",{"key":24,"text":542,"correct":26},"争议评审组由有施工管理和工程实践经验的专家组成",{"key":28,"text":544,"correct":22},"在争议评审期间，争议双方暂按总监理工程师的确定执行",{"key":31,"text":546,"correct":26},"争议评审组的评审意见具有法律强制性，发包人或承包人不可再提交仲裁或提起诉讼",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},938947,"货物采购合同催交工作的重点是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"保证货物生产制造的安全和质量",{"key":24,"text":554,"correct":26},"保证货物生产制造的技术经济性",{"key":28,"text":556,"correct":22},"保证货物生产制造的进度和工期",{"key":31,"text":558,"correct":26},"保证整个项目的进度和工期得以实现",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},938948,"监理人审查竣工验收申请报告，认为尚不具备竣工验收条件的，应在收到竣工验收申请报告后的（ ）天内通知承包人。",[563,565,567,569],{"key":20,"text":564,"correct":26},"14",{"key":24,"text":566,"correct":22},"28",{"key":28,"text":568,"correct":26},"42",{"key":31,"text":570,"correct":26},"56",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},938949,"下列关于发包人要求勘察人提前完成勘察的表述，错误的是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"发包人不得压缩合理的勘察服务期限",{"key":24,"text":578,"correct":22},"提前完成勘察工作，可减少支付勘察费用",{"key":28,"text":580,"correct":26},"造成勘察费用增加的，所增费用由发包人承担",{"key":31,"text":582,"correct":26},"勘察人认为无法实施的，应在收到发包人书面指示后 7 天内提出异议",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},938950,"发包人应按照合同约定方式预留保证金，保证金总预留比例不得高于工程价款结算总额的（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"3%",{"key":24,"text":590,"correct":26},"5%",{"key":28,"text":592,"correct":26},"10%",{"key":31,"text":594,"correct":26},"15%",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},938951,"设备采购合同生效后，买方在收到卖方开具的注明应付预付款金额的财务收据正本一份并经审核无误后 28 日内，向卖方支付签约合同价的（ ）作为（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"5%；预付款",{"key":24,"text":602,"correct":22},"10%；预付款",{"key":28,"text":604,"correct":26},"20%；交货款",{"key":31,"text":606,"correct":26},"30%；交货款",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},938952,"设备采购中，卖方按合同约定交付全部合同设备后，买方在收到卖方提交的全部单据并经审核无误后 28 日内，向卖方支付合同价格的（ ），作为（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":26},"50%；预付款",{"key":24,"text":614,"correct":22},"60%；交货款",{"key":28,"text":616,"correct":26},"20%；验收款",{"key":31,"text":618,"correct":26},"10%；结清款",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":24,"analysis":33},938953,"设备采购合同中，买方在收到卖方提交的买卖双方签署的合同设备验收证书，经审核无误后 28 日内，向卖方支付合同价格的（ ）作为（ ）。",[623,624,626,628],{"key":20,"text":616,"correct":26},{"key":24,"text":625,"correct":22},"25%；验收款",{"key":28,"text":627,"correct":26},"20%；结清款",{"key":31,"text":629,"correct":26},"25%；结清款",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":28,"analysis":33},938954,"下列关于设备采购合同中交货条款的表述，正确的是（ ）。",[634,636,638,640],{"key":20,"text":635,"correct":26},"买方签发收货清单代表对合同设备的接受",{"key":24,"text":637,"correct":26},"合同设备的所有权和风险自安装调试后由卖方转移至买方",{"key":28,"text":639,"correct":22},"如果买方发现卖方提供的技术资料有误，卖方应在收到买方通知后 7 日内免费替换",{"key":31,"text":641,"correct":26},"买方对卖方交付的包裝的合同设备的外观及件数进行清点核验后应签发收货清单，卸货费用由卖方承担",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":24,"analysis":33},938955,"设备采购合同中，除供货要求等合同文件另有约定外，合同设备整体质量保证期为验收之日起（ ）个月。",[646,648,650,652],{"key":20,"text":647,"correct":26},"6",{"key":24,"text":649,"correct":22},"12",{"key":28,"text":651,"correct":26},"18",{"key":31,"text":653,"correct":26},"24",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":28,"analysis":33},938956,"根据《标准设计招标文件》，基准日之后设计文件遵守的法律发生重大变化时，设计人应向发包人提出遵守新规定的建议，发包人在收到建议后（ ）天内发出是否遵守新规定的指示。",[658,660,662,664],{"key":20,"text":659,"correct":26},"3",{"key":24,"text":661,"correct":26},"5",{"key":28,"text":663,"correct":22},"7",{"key":31,"text":665,"correct":26},"10",[667,670,673,676,679,682],{"id":15,"name":668,"category":7,"favorite":669},"领导干部任职前廉政法规知识测试题",92,{"id":671,"name":672,"category":7,"favorite":15},595,"建筑结构与设备",{"id":674,"name":675,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":677,"name":678,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":680,"name":681,"category":7,"favorite":8},534,"BIM工程师",{"id":683,"name":681,"category":7,"favorite":8},535]