[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":645},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,24,50,1948,[13,34,52,67,79,94,109,124,136,148,160,172,187,202,214,226,238,250,262,277,292,307,321,335,347,359,371,380,395,406,418,433,443,457,469,481,492,504,516,528,540,550,562,574,583,596,605,614,623,635],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},938855,1,"单选题","根据《标准施工招标文件》（2007 年版），关于缺陷责任期的表述错误的是（ ）",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","缺陷责任期自实际竣工日期起计算",false,{"key":24,"text":25,"correct":22},"B","缺陷责任期最长不超过2年",{"key":27,"text":28,"correct":29},"C","缺陷责任期届满，承包人保修义务终止",true,{"key":31,"text":32,"correct":22},"D","缺陷责任期终止后14天内退还剩余质量保证金","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},938856,2,"多选题","根据《标准施工招标文件》（2007 年版），下列关于隐蔽工程检查的说法，错误的有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"承包人自检确定隐蔽工程具备覆盖条件的，应通知监理人在约定的期限内检查",{"key":24,"text":43,"correct":22},"监理人检查隐蔽工程发现质量不合格的，承包人应自费完成修复",{"key":27,"text":45,"correct":22},"监理人未按时进行检查也未提出延期要求的，视为隐蔽工程检查合格",{"key":31,"text":47,"correct":29},"监理人检查完毕且承包人覆盖隐蔽工程后，监理人不能再要求对隐蔽工程进行重新检查",{"key":49,"text":50,"correct":29},"E","承包人私自将隐蔽工程覆盖的，监理人有权指示承包人揭开检查，如果质量合格，由此增加的费用由发包人承担","DE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},938857,"根据《标准施工招标文件》（2007 年版），下列关于解决合同争议的说法，正确的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":29},"在争议评审、仲裁或诉讼过程中，发包人和承包人均可共同努力友好协商解决争议",{"key":24,"text":59,"correct":29},"发包人和承包人应在开工日后的28天内或在争议发生后，协商成立争议评审组",{"key":27,"text":61,"correct":29},"争议评审组的评审意见并不具有法律强制性",{"key":31,"text":63,"correct":22},"友好协商解决不成的，才可以向约定的仲裁委员会申请仲裁",{"key":49,"text":65,"correct":22},"合同中可同时将仲裁和诉讼约定为解决争议的方式","ABC",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":27,"analysis":33},938859,"货物采购合同履行过程中，采购方驻场代表催交工作的重点是保证货物生产的（ ）。",[71,73,75,77],{"key":20,"text":72,"correct":22},"安全",{"key":24,"text":74,"correct":22},"原料供应",{"key":27,"text":76,"correct":29},"进度",{"key":31,"text":78,"correct":22},"成本控制",{"id":80,"libraryId":5,"type":36,"typeLabel":37,"stem":81,"options":82,"answer":93,"analysis":33},938860,"货物催交工作中，咨询工程师的主要工作包括（ ）。",[83,85,87,89,91],{"key":20,"text":84,"correct":29},"督促供货人按期提交货物",{"key":24,"text":86,"correct":22},"向供货人提交制造进度表",{"key":27,"text":88,"correct":29},"检查货物装运准备情况",{"key":31,"text":90,"correct":29},"检查货物关键工序生产情况",{"key":49,"text":92,"correct":29},"检查供货人原材料采购进展情况","ACDE",{"id":95,"libraryId":5,"type":36,"typeLabel":37,"stem":96,"options":97,"answer":108,"analysis":33},938861,"货物现场监造工作中，咨询工程师的工作主要有（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":29},"聘请有资格的检验机构承担检验工作",{"key":24,"text":101,"correct":29},"根据货物采购合同制订监造检验计划",{"key":27,"text":103,"correct":22},"设备制造开始后组织召开制造厂协调会议",{"key":31,"text":105,"correct":29},"设备制造完毕后做好出厂前检验测试",{"key":49,"text":107,"correct":29},"了解制造厂质量保证体系文件实施情况","ABDE",{"id":110,"libraryId":5,"type":36,"typeLabel":37,"stem":111,"options":112,"answer":123,"analysis":33},938862,"在履行合同过程中，由于( )原因造成勘察服务期限延误的，发包人应当延长勘察 服务期限并增加勘察费用。",[113,115,117,119,121],{"key":20,"text":114,"correct":29},"发包人原因造成合同变更",{"key":24,"text":116,"correct":29},"出现合同规定的异常恶劣气候条件导致周期延误",{"key":27,"text":118,"correct":29},"勘察人发现地下文物，及时报告发包人和文物部门，并采取有效保护措施",{"key":31,"text":120,"correct":29},"行政管理部门审查延迟造成费用增加和周期延误",{"key":49,"text":122,"correct":22},"勘察人原因造成周期延误","ABCD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":27,"analysis":33},938863,"FIDIC 合同通用条件中，“接受的合同款额”是指（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"承包商完成建造任务后，业主支付的数额",{"key":24,"text":131,"correct":22},"承包商对所有合格工程有权获得的工程款",{"key":27,"text":133,"correct":29},"业主在中标函中对实施、完成和修复工程缺陷所接受的金额",{"key":31,"text":135,"correct":22},"承包商对实施、完成和修复工程缺陷所接受的金额",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":20,"analysis":33},938864,"根据 FIDIC《施工合同条件》，承包商完成建造和保修任务后，对所有合格工程有权获得的全部工程款称为（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":29},"合同价格",{"key":24,"text":143,"correct":22},"接受的合同款额",{"key":27,"text":145,"correct":22},"合同结算价格",{"key":31,"text":147,"correct":22},"合同决算价格",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},938865,"根据 FIDIC《施工合同条件》，承包商提供的履约担保为不需要由（ ）确认违约的无条件担保。",[152,154,156,158],{"key":20,"text":153,"correct":22},"咨询工程师",{"key":24,"text":155,"correct":22},"项目业主",{"key":27,"text":157,"correct":29},"承包商",{"key":31,"text":159,"correct":22},"出具履约担保的金融机构",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},938866,"下列关于裁决委员会的说法错误的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"裁决委员会可约定为一名或三名成员，一般由三名组成",{"key":24,"text":167,"correct":22},"合同每一方应提名一位成员，由对方批准",{"key":27,"text":169,"correct":29},"合同每一方应提名一位成员，无须对方批准",{"key":31,"text":171,"correct":22},"双方应与两名成员共同商定第三位成员，第三人作为主席",{"id":173,"libraryId":5,"type":36,"typeLabel":37,"stem":174,"options":175,"answer":186,"analysis":33},938867,"关于FIDIC《施工合同条件》合同争端裁决委员会的说法，正确的有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":29},"合同争议可提交合同争端裁决委员会进行裁决",{"key":24,"text":179,"correct":22},"合同争端裁决委员会应在收到争议后56天内作出裁决",{"key":27,"text":181,"correct":22},"作出裁决后的56天内合同双方无异议则裁决为最终决定",{"key":31,"text":183,"correct":29},"任何一方对裁决不满可在28天内将争议提交仲裁",{"key":49,"text":185,"correct":29},"仲裁机构收到仲裁申请后应在56天才开始审理","ADE",{"id":188,"libraryId":5,"type":36,"typeLabel":37,"stem":189,"options":190,"answer":201,"analysis":33},938868,"FIDIC 合同条件下，承包商编制施工进度计划时应说明拟采用的（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":29},"进度计划安排",{"key":24,"text":194,"correct":29},"施工组织方案",{"key":27,"text":196,"correct":22},"月支付费用",{"key":31,"text":198,"correct":29},"施工方法",{"key":49,"text":200,"correct":22},"预付款扣还方式","ABD",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},938869,"根据 FIDIC《施工合同条件》，承包商未能在规定的期限内修复缺陷部位，业主可雇佣他人完成，费用从（ ）内扣除。",[206,208,210,212],{"key":20,"text":207,"correct":29},"保留金",{"key":24,"text":209,"correct":22},"工程进度款",{"key":27,"text":211,"correct":22},"预付款",{"key":31,"text":213,"correct":22},"履约保证金",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},938870,"根据FIDIC 施工合同条件，履约担保的保证期限应到（ ）为止。",[218,220,222,224],{"key":20,"text":219,"correct":22},"工程实质性竣工",{"key":24,"text":221,"correct":22},"颁发工程接收证书",{"key":27,"text":223,"correct":29},"缺陷责任期满",{"key":31,"text":225,"correct":22},"保留金达到扣留限额",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},938871,"关于FIDIC 合同条件中合同担保的说法，正确的有（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"承包人接受预付款前可以不提供预付款担保",{"key":24,"text":233,"correct":29},"履约保函均为无条件担保形式",{"key":27,"text":235,"correct":22},"履约保函的有效期到工程师颁发工程接收证书为止",{"key":31,"text":237,"correct":22},"通用条件中明确规定了5种业主可凭履约保函索赔的情形",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},938872,"根据FIDIC 施工合同条件，下列关于工程进度款的表述中，正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"工程量清单中的工程量可以作为工程结算的依据",{"key":24,"text":245,"correct":22},"采用单价合同的项目应以图纸工程量作为支付依据",{"key":27,"text":247,"correct":22},"工程款逾期支付，业主应按银行贷款利率加2%支付利息",{"key":31,"text":249,"correct":29},"工程师应在收到承包商支付报表后28天内按核实结果签发支付证书",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},938873,"关于 FIDIC 施工合同条件中工程竣工验收的说法，正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"获得工程接收证书后，工程照管责任仍由承包商负责",{"key":24,"text":257,"correct":29},"可以允许承包商在缺陷责任期内继续完成工程部分扫尾工作",{"key":27,"text":259,"correct":22},"工程师接到承包商申请28天后才能颁发工程接收证书",{"key":31,"text":261,"correct":22},"对于未通过竣工检验的工程，可调整标准重新进行竣工检验",{"id":263,"libraryId":5,"type":36,"typeLabel":37,"stem":264,"options":265,"answer":276,"analysis":33},938874,"下列关于FIDIC 施工合同条件下缺陷通知期的说法，正确的是（ ）。",[266,268,270,272,274],{"key":20,"text":267,"correct":22},"缺陷通知期不同于国内施工合同所指的工程保修期",{"key":24,"text":269,"correct":29},"缺陷通知期自工程接收证书中写明的竣工日开始",{"key":27,"text":271,"correct":22},"承包商应在缺陷通知期开始前将工程所有工作完成",{"key":31,"text":273,"correct":29},"缺陷通知期内工程出现质量问题由承包商负责",{"key":49,"text":275,"correct":29},"缺陷通知期为考验工程动态进行中是否达到合同要求而设置","BDE",{"id":278,"libraryId":5,"type":36,"typeLabel":37,"stem":279,"options":280,"answer":291,"analysis":33},938875,"关于 FIDIC 合同条件中合同担保的说法，正确的有（ ）",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"履约保函的有效期至工程师颁发工程接受证书时止",{"key":24,"text":284,"correct":29},"预付款保函为不需承包商确认违约的无条件担保形式",{"key":27,"text":286,"correct":22},"通用条件中明确规定了业主可凭保函索赔的5种情形",{"key":31,"text":288,"correct":29},"承包商接受预付款前应提供预付款担保",{"key":49,"text":290,"correct":22},"承包商签订合同后应提供履约担保","BD",{"id":293,"libraryId":5,"type":36,"typeLabel":37,"stem":294,"options":295,"answer":306,"analysis":33},938876,"根据FIDIC 施工合同条件，下列关于预付款的表述中，正确的包括（ ）。",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"预付款的具体金额在招标文件中确认",{"key":24,"text":299,"correct":22},"预付款应不少于合同总价的60%",{"key":27,"text":301,"correct":29},"工程师在21天内签发预付款支付证书",{"key":31,"text":303,"correct":29},"预付款在支付工程进度款时按比例扣减",{"key":49,"text":305,"correct":29},"预付款保函金额始终保持与预付款等额","CDE",{"id":308,"libraryId":5,"type":36,"typeLabel":37,"stem":309,"options":310,"answer":291,"analysis":33},938877,"根据 FIDIC 施工合同条件，下列关于工程质量管理条款的说法，错误的有（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"承包人应建立有效的质量管理体系，保证施工符合合同要求",{"key":24,"text":314,"correct":29},"按照工程师认可的质量管理体系施工，发生质量事故由业主承担责任",{"key":27,"text":316,"correct":22},"业主对图纸资料的真实性和正确性负责，承包人对自己的理解或推论负责",{"key":31,"text":318,"correct":29},"发生合同规定之外的检查和试验，由业主承担费用",{"key":49,"text":320,"correct":22},"承包人使用的施工设备影响了工程进度时，承包人应自费增加或更换施工设备",{"id":322,"libraryId":5,"type":36,"typeLabel":37,"stem":323,"options":324,"answer":108,"analysis":33},938878,"关于 FIDIC《施工合同条件》指定分包商的说法，正确的有（ ）",[325,327,329,331,333],{"key":20,"text":326,"correct":29},"指定分包商由业主指定",{"key":24,"text":328,"correct":29},"在承包商确定后才选择指定分包商",{"key":27,"text":330,"correct":22},"指定分包商与业主签订分包合同",{"key":31,"text":332,"correct":29},"对指定分包商的管理纳入承包商的管理之中",{"key":49,"text":334,"correct":29},"指定分包商是完成某项特定工作内容的特殊分包商",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},938879,"根据 FIDIC《施工合同条件》，业主提供的支付担保期限至缺陷通知期满后（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"3个月",{"key":24,"text":342,"correct":29},"6个月",{"key":27,"text":344,"correct":22},"9个月",{"key":31,"text":346,"correct":22},"12个月",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},938880,"关于FIDIC 指定分包商的说法，正确的是（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":29},"指定分包商可由工程师指定",{"key":24,"text":354,"correct":22},"指定分包商应与业主签订合同",{"key":27,"text":356,"correct":22},"指定分包商不能提供工程技术服务",{"key":31,"text":358,"correct":22},"承包商不负责对指定分包商的监管",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},938881,"FIDIC 合同条件规定，争端裁决委员会作出裁决后（ ）日内任何一方未提出不满意裁决的通知，此裁决即为最终决定。",[363,365,367,369],{"key":20,"text":364,"correct":22},"14",{"key":24,"text":366,"correct":29},"28",{"key":27,"text":368,"correct":22},"56",{"key":31,"text":370,"correct":22},"84",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},938882,"根据《标准施工招标文件》(2007 年版)，承包人按合同约定完成了包括缺陷责任期内的全 部承包工作后，发包人应付给承包人的金额称为( )。",[375,376,378,379],{"key":20,"text":141,"correct":29},{"key":24,"text":377,"correct":22},"签约合同价",{"key":27,"text":145,"correct":22},{"key":31,"text":147,"correct":22},{"id":381,"libraryId":5,"type":36,"typeLabel":37,"stem":382,"options":383,"answer":394,"analysis":33},938883,"下列关于施工合同订立的说法正确的是( )。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"合同当事人包括发包人、承包人和监理人",{"key":24,"text":387,"correct":29},"施工合同的标的是工程，包括永久工程和临时工程",{"key":27,"text":389,"correct":29},"施工合同的实质性条款包括合同工期、质量、价款",{"key":31,"text":391,"correct":29},"合同工期指承包人在投标函中承诺的完成合同工程所需的期限",{"key":49,"text":393,"correct":29},"质量标准由发包人在招标文件中予以约定","BCDE",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},938884,"根据《国务院办公厅关于清理规范工程建设领域保证金的通知》(国办发[2016]49号)，在 工程项目竣工前，已经缴纳( )的，建设单位不得同时预留工程质量保证金。",[399,400,402,404],{"key":20,"text":213,"correct":29},{"key":24,"text":401,"correct":22},"投标保证金",{"key":27,"text":403,"correct":22},"农民工工资保证金",{"key":31,"text":405,"correct":22},"预付款保证金",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},938885,"根据《标准施工招标文件》(2007年版)，合同进度计划是指经( )批准的施工进度计划。",[410,412,414,416],{"key":20,"text":411,"correct":22},"监督人",{"key":24,"text":413,"correct":22},"承包人",{"key":27,"text":415,"correct":29},"监理人",{"key":31,"text":417,"correct":22},"投资人",{"id":419,"libraryId":5,"type":36,"typeLabel":37,"stem":420,"options":421,"answer":432,"analysis":33},938886,"根据《标准施工招标文件》(2007 年版)，在履行合同过程中，由于( )原因造成工期延误的，承包人有权要求发包人延长工期和(或)增加费用，并支付合理利润。",[422,424,426,428,430],{"key":20,"text":423,"correct":29},"发包人增加合同工作内容",{"key":24,"text":425,"correct":29},"发包人改变合同中任何一项工作的质量要求或其他特性",{"key":27,"text":427,"correct":22},"在施工现场遇到不可预见的地质条件",{"key":31,"text":429,"correct":22},"因承包人原因导致的暂停施工",{"key":49,"text":431,"correct":22},"出现合同约定的异常恶劣气候的条件","AB",{"id":434,"libraryId":5,"type":36,"typeLabel":37,"stem":435,"options":436,"answer":51,"analysis":33},938887,"根据《标准施工招标文件》(2007 年版)，下列关于隐蔽工程检查的说法，错误的有( )。",[437,438,439,440,441],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":47,"correct":29},{"key":49,"text":442,"correct":29},"承包人私自将隐蔽工程覆盖的，监理人有权指示承包人揭开检查，如果质量合格，由此增 加的费用由发包人承担",{"id":444,"libraryId":5,"type":36,"typeLabel":37,"stem":445,"options":446,"answer":66,"analysis":33},938889,"根据《工程建设项目施工招标投标办法》的规定，施工招标项目工期较长的，招标文件 中可以规定( )。",[447,449,451,453,455],{"key":20,"text":448,"correct":29},"价格调整因素",{"key":24,"text":450,"correct":29},"工程造价指数体系",{"key":27,"text":452,"correct":29},"价格调整方法",{"key":31,"text":454,"correct":22},"需调整的合同价款",{"key":49,"text":456,"correct":22},"需调整的工程费用",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},938890,"根据《标准施工招标文件》(2007 年版)，下列关于合同变更的说法错误的是( )。",[461,463,465,467],{"key":20,"text":462,"correct":22},"发包人和监理人均可提出变更",{"key":24,"text":464,"correct":29},"发包人可直接向承包人发出变更指示",{"key":27,"text":466,"correct":22},"承包人收到经发包人签认的变更指示后，方可实施变更",{"key":31,"text":468,"correct":22},"若承包人认为变更指示不能执行，应立即说明理由",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},938891,"由于卖方原因未能达到技术性能考核指标时，为卖方进行考核的机会不超过( )次。",[473,475,477,479],{"key":20,"text":474,"correct":22},"二",{"key":24,"text":476,"correct":29},"三",{"key":27,"text":478,"correct":22},"五",{"key":31,"text":480,"correct":22},"一",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},938892,"根据《标准设备采购招标文件》，由于买方原因合同设备在三次考核中均未能达到技术性 能考核指标，买卖双方应在考核结束后 7 日内签署( )。",[485,487,488,490],{"key":20,"text":486,"correct":22},"合同设备验收证书",{"key":24,"text":486,"correct":22},{"key":27,"text":489,"correct":22},"质量保证期届满证书",{"key":31,"text":491,"correct":29},"验收款支付函",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},938893,"根据《标准设备采购招标文件》，由于买方原因在最后一批合同设备交货后( )个月内 未能开始考核，则买卖双方应在上述期限届满后 7 日内签署验收款支付函。",[496,498,500,502],{"key":20,"text":497,"correct":22},"3",{"key":24,"text":499,"correct":29},"6",{"key":27,"text":501,"correct":22},"9",{"key":31,"text":503,"correct":22},"12",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},938894,"根据《标准设备采购招标文件》，在合同设备( )内发生合同项下备品备件停止生产的 情况，卖方应事先将拟停止生产的计划通知买方，使买方有足够的时间考虑备品备件的需求量。",[508,510,512,514],{"key":20,"text":509,"correct":29},"设计使用寿命期",{"key":24,"text":511,"correct":22},"缺陷责任期",{"key":27,"text":513,"correct":22},"质量保证期",{"key":31,"text":515,"correct":22},"保修期",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},938895,"除供货要求等合同文件另有约定外，合同设备整体质量保证期为( )。",[520,522,524,526],{"key":20,"text":521,"correct":29},"验收之日起 12 个月",{"key":24,"text":523,"correct":22},"验收之日起算，至合同材料验收证书或进度款支付函签署之日起 12 个月止(以先到的为准)",{"key":27,"text":525,"correct":22},"验收之日起算，至合同材料验收证书或进度款支付函签署之日起 12 个月止(以后到的为准)",{"key":31,"text":527,"correct":22},"验收之日起 24 个月止",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},938896,"卖方未能按时交付合同设备的，应向买方支付迟延交付违约金。除专用合同条款另有约 定外，从迟交的第五周到第八周，每周迟延交付违约金为迟交合同设备价格的( )。",[532,534,536,538],{"key":20,"text":533,"correct":22},"0.5%",{"key":24,"text":535,"correct":29},"1.0%",{"key":27,"text":537,"correct":22},"1.5%",{"key":31,"text":539,"correct":22},"2.0%",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},938897,"根据《标准勘察招标文件》，因发包人原因造成合同签订之日起( )天内未能发出开始 勘察通知的，勘察人有权提出价格调整要求，或者解除合同。",[544,546,548,549],{"key":20,"text":545,"correct":29},"90",{"key":24,"text":547,"correct":22},"7",{"key":27,"text":364,"correct":22},{"key":31,"text":366,"correct":22},{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},938898,"根据《标准勘察招标文件》，关于周期延误的表述错误的是( )。",[554,556,558,560],{"key":20,"text":555,"correct":22},"出现合同规定的异常恶劣气候条件导致周期延误的，勘察人有权要求发包人延长周期",{"key":24,"text":557,"correct":22},"勘察人发现地下文物时，有权要求发包人延长周期",{"key":27,"text":559,"correct":22},"勘察人原因造成周期延误，勘察人应支付逾期违约金",{"key":31,"text":561,"correct":29},"由于行政管理部门审查延迟造成周期延误的，由勘察人承担",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},938899,"根据《标准勘察招标文件》，勘察人完成勘察项目后通知发包人进行验收，通过验收后 由( )对实施的勘察项目、数量、质量和实施时间签字确认，以此作为计算勘察费用的依据之 一。",[566,568,570,572],{"key":20,"text":567,"correct":29},"发包人代表",{"key":24,"text":569,"correct":22},"勘察单位项目负责人",{"key":27,"text":571,"correct":22},"总监理工程师",{"key":31,"text":573,"correct":22},"勘察单位代表",{"id":575,"libraryId":5,"type":36,"typeLabel":37,"stem":576,"options":577,"answer":108,"analysis":33},938900,"关于 FIDIC《施工合同条件》指定分包商的说法，正确的有( )。",[578,579,580,581,582],{"key":20,"text":326,"correct":29},{"key":24,"text":328,"correct":29},{"key":27,"text":330,"correct":22},{"key":31,"text":332,"correct":29},{"key":49,"text":334,"correct":29},{"id":584,"libraryId":5,"type":36,"typeLabel":37,"stem":585,"options":586,"answer":108,"analysis":33},938901,"关于 FIDIC《施工合同条件》合同争端裁决委员会的说法，正确的有( )。",[587,588,590,592,594],{"key":20,"text":177,"correct":29},{"key":24,"text":589,"correct":29},"合同争端裁决委员会应在收到争议后 84 天内作出裁决",{"key":27,"text":591,"correct":22},"作出裁决后的 56 天内合同双方无异议则裁决为最终决定",{"key":31,"text":593,"correct":29},"任何一方对裁决不满可在 28 天内将争议提交仲裁",{"key":49,"text":595,"correct":29},"仲裁机构收到仲裁申请后应在 56 天才开始审理",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},938902,"下列关于裁决委员会的说法错误的是( )。",[600,601,602,603],{"key":20,"text":165,"correct":22},{"key":24,"text":167,"correct":22},{"key":27,"text":169,"correct":29},{"key":31,"text":604,"correct":22},"双方应与两名成员共同商定第二位成员，第三人作为主席",{"id":606,"libraryId":5,"type":36,"typeLabel":37,"stem":607,"options":608,"answer":201,"analysis":33},938903,"FIDIC 合同条件下，承包商编制施工进度计划时应说明拟采用的( )。",[609,610,611,612,613],{"key":20,"text":192,"correct":29},{"key":24,"text":194,"correct":29},{"key":27,"text":196,"correct":22},{"key":31,"text":198,"correct":29},{"key":49,"text":200,"correct":22},{"id":615,"libraryId":5,"type":36,"typeLabel":37,"stem":616,"options":617,"answer":291,"analysis":33},938904,"根据 FIDIC 施工合同条件，下列关于工程质量管理条款的说法，错误的有( )。",[618,619,620,621,622],{"key":20,"text":312,"correct":22},{"key":24,"text":314,"correct":29},{"key":27,"text":316,"correct":22},{"key":31,"text":318,"correct":29},{"key":49,"text":320,"correct":22},{"id":624,"libraryId":5,"type":36,"typeLabel":37,"stem":625,"options":626,"answer":93,"analysis":33},938905,"根据FIDIC施工合同条件，下列关于工程进度款的表述中，正确的是( )。",[627,629,630,632,633],{"key":20,"text":628,"correct":29},"工程量清单中的工程量不能作为工程结算的依据",{"key":24,"text":245,"correct":22},{"key":27,"text":631,"correct":29},"工程款逾期支付，业主应按银行贷款利率加3%支付利息",{"key":31,"text":249,"correct":29},{"key":49,"text":634,"correct":29},"业主的付款时间不应超过工程师收到承包商的月进度付款申请单后的56天",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":20,"analysis":33},938906,"关于FIDIC施工合同条件中工程竣工验收的说法，错误的是( )。",[639,640,641,643],{"key":20,"text":255,"correct":29},{"key":24,"text":257,"correct":22},{"key":27,"text":642,"correct":22},"工程师接到承包商申请 28 天内颁发工程接收证书",{"key":31,"text":644,"correct":22},"工程师在收到竣工报表后 28 天内签署竣工结算的支付证书",[646,649,652,655,658,661],{"id":15,"name":647,"category":7,"favorite":648},"领导干部任职前廉政法规知识测试题",92,{"id":650,"name":651,"category":7,"favorite":15},595,"建筑结构与设备",{"id":653,"name":654,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":656,"name":657,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":659,"name":660,"category":7,"favorite":8},534,"BIM工程师",{"id":662,"name":660,"category":7,"favorite":8},535]