[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":653},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,15,50,1948,[13,38,52,64,76,88,103,115,125,137,149,161,173,185,200,215,227,239,249,264,278,288,297,306,320,332,343,355,363,375,390,402,417,431,443,457,471,485,500,514,526,541,553,565,574,586,600,612,624,639],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},938391,2,"多选题","下列属于初始评审主要内容的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","辨识工作场所中的危险因素和环境因素",true,{"key":24,"text":25,"correct":26},"B","评价现有措施或计划采取的措施消除危害或控制风险的经济性",false,{"key":28,"text":29,"correct":22},"C","评审现有的规定.过程和程序，分析其有效性和实用性",{"key":31,"text":32,"correct":22},"D","评审以往的事故，进行分析评价",{"key":34,"text":35,"correct":26},"E","制定职业健康安全（环境）管理方针","ACD","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":24,"analysis":37},938392,1,"单选题","在进行设计时，充分考虑产品部件及材料的可回收性、回收价值的大小、回收处理方法等与回收相关的一系列问题，此为绿色设计中的（ ）方法。",[44,46,48,50],{"key":20,"text":45,"correct":26},"减耗设计",{"key":24,"text":47,"correct":22},"回收设计",{"key":28,"text":49,"correct":26},"模块化设计",{"key":31,"text":51,"correct":26},"并行工程设计",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":20,"analysis":37},938393,"下列属于绿色施工管理的是（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":22},"组织管理",{"key":24,"text":59,"correct":26},"经济管理",{"key":28,"text":61,"correct":26},"合同管理",{"key":31,"text":63,"correct":26},"进度管理",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":24,"analysis":37},938394,"与组织各层次的员工协商后建立、实施并保持职业健康安全和环境管理方针，以文件的方式表述出职业健康安全与环境管理的意图与原则，此为 PDCA 模式下职业健康安全与环境管理体系要素中的（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":26},"组织所处的环境要素",{"key":24,"text":71,"correct":22},"领导作用要素",{"key":28,"text":73,"correct":26},"策划要素",{"key":31,"text":75,"correct":26},"支持和运行要素",{"id":77,"libraryId":5,"type":40,"typeLabel":41,"stem":78,"options":79,"answer":28,"analysis":37},938396,"某工程出现施工事故，造成 2000 万元直接经济损失，该事故属于( )。",[80,82,84,86],{"key":20,"text":81,"correct":26},"特别重大事故",{"key":24,"text":83,"correct":26},"重大事故",{"key":28,"text":85,"correct":22},"较大事故",{"key":31,"text":87,"correct":26},"一般事故",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":102,"analysis":37},938397,"应急预案应形成体系，针对各级各类可能发生的事故和所有危险源制订( )，并明确 事前、事发、事中、事后的各个过程中相关部门和有关人员的职责。",[92,94,96,98,100],{"key":20,"text":93,"correct":22},"综合应急预案",{"key":24,"text":95,"correct":22},"专项应急预案",{"key":28,"text":97,"correct":22},"现场应急处置方案",{"key":31,"text":99,"correct":26},"技术交底方案",{"key":34,"text":101,"correct":26},"施工策划方案","ABC",{"id":104,"libraryId":5,"type":40,"typeLabel":41,"stem":105,"options":106,"answer":24,"analysis":37},938398,"为提高本部门、本地区生产事故应急处置能力，各级人民政府应急管理部门应当至 少( )应急预案演练",[107,109,111,113],{"key":20,"text":108,"correct":26},"每年组织一次",{"key":24,"text":110,"correct":22},"每两年组织一次",{"key":28,"text":112,"correct":26},"每半年组织一次",{"key":31,"text":114,"correct":26},"每年组织两次",{"id":116,"libraryId":5,"type":40,"typeLabel":41,"stem":117,"options":118,"answer":28,"analysis":37},938399,"力求在设计阶段就考虑生命周期的全过程的所有因素，此为绿色设计方法中的（ ）。",[119,120,122,123],{"key":20,"text":49,"correct":26},{"key":24,"text":121,"correct":26},"循环设计",{"key":28,"text":51,"correct":22},{"key":31,"text":124,"correct":26},"全面设计",{"id":126,"libraryId":5,"type":40,"typeLabel":41,"stem":127,"options":128,"answer":31,"analysis":37},938400,"下列不属于初步设计中的安全报告主要内容的是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":26},"设计依据",{"key":24,"text":132,"correct":26},"地质安全影响因素",{"key":28,"text":134,"correct":26},"工程项目安全评述",{"key":31,"text":136,"correct":22},"各建筑物.构筑物的设计文件",{"id":138,"libraryId":5,"type":40,"typeLabel":41,"stem":139,"options":140,"answer":28,"analysis":37},938401,"建立职业健康安全与环境管理体系步骤中，在初始状态评审之后要做的工作是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":26},"管理体系文件的编制",{"key":24,"text":144,"correct":26},"制定方针和目标",{"key":28,"text":146,"correct":22},"体系策划与设计",{"key":31,"text":148,"correct":26},"人员培训",{"id":150,"libraryId":5,"type":40,"typeLabel":41,"stem":151,"options":152,"answer":28,"analysis":37},938402,"以下安全责任中，属于施工单位的安全的是（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":26},"确定工程项目安全作业环境及安全施工措施所需费用",{"key":24,"text":156,"correct":26},"提供工程项目有关安全施工措施的资料",{"key":28,"text":158,"correct":22},"设立安全生产管理机构和配备专职安全管理人员",{"key":31,"text":160,"correct":26},"提供真实准确的勘察资料",{"id":162,"libraryId":5,"type":40,"typeLabel":41,"stem":163,"options":164,"answer":20,"analysis":37},938403,"根据《建设工程生产管理条例》，在拆除工程施工 15 日前备案，这属于( )的 责任。",[165,167,169,171],{"key":20,"text":166,"correct":22},"建设单位",{"key":24,"text":168,"correct":26},"设计单位",{"key":28,"text":170,"correct":26},"监理单位",{"key":31,"text":172,"correct":26},"施工单位",{"id":174,"libraryId":5,"type":40,"typeLabel":41,"stem":175,"options":176,"answer":20,"analysis":37},938404,"单位工程开工前，( )必须向承担施工的作业队负责人、工长、班组长和相关人员进行 交底。",[177,179,181,183],{"key":20,"text":178,"correct":22},"单位工程技术负责人",{"key":24,"text":180,"correct":26},"总承包项目部",{"key":28,"text":182,"correct":26},"分包商",{"key":31,"text":184,"correct":26},"单位工程项目负责人",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},938405,"检查报告的内容应包括( )。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"已达标项目",{"key":24,"text":192,"correct":22},"未达标项目所存在问题",{"key":28,"text":194,"correct":22},"原因分析",{"key":31,"text":196,"correct":26},"应急处置措施",{"key":34,"text":198,"correct":22},"预防措施","ABCE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},938406,"工程项目环境影响评价的工作内容有( )。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"工程施工",{"key":24,"text":207,"correct":22},"工程分析",{"key":28,"text":209,"correct":22},"清洁生产评价",{"key":31,"text":211,"correct":26},"工程项目环境影响的分析与调整",{"key":34,"text":213,"correct":22},"工程项目的环境影响识别与预测","BCE",{"id":216,"libraryId":5,"type":40,"typeLabel":41,"stem":217,"options":218,"answer":24,"analysis":37},938407,"下列不属于安全预评价内容的是（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":26},"危险度评价",{"key":24,"text":222,"correct":22},"编制安全计划",{"key":28,"text":224,"correct":26},"有害因素识别",{"key":31,"text":226,"correct":26},"安全对策措施及建议",{"id":228,"libraryId":5,"type":40,"typeLabel":41,"stem":229,"options":230,"answer":24,"analysis":37},938408,"下列不属于安全教育内容的是（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":26},"安全思想教育",{"key":24,"text":234,"correct":22},"安全评价教育",{"key":28,"text":236,"correct":26},"典型事故教育",{"key":31,"text":238,"correct":26},"职业健康安全技术知识教育",{"id":240,"libraryId":5,"type":40,"typeLabel":41,"stem":241,"options":242,"answer":28,"analysis":37},938410,"（ ）的目的是了解组织的职业健康安全与环境的管理现状，为组织建立管理体系搜集信息并提供依据。",[243,245,246,248],{"key":20,"text":244,"correct":26},"领导决策",{"key":24,"text":148,"correct":26},{"key":28,"text":247,"correct":22},"初始评审",{"key":31,"text":146,"correct":26},{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":263,"analysis":37},938412,"下列关于在应急预案的评审当中，应当注重的内容，表述正确的有（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"基本要素的完整性",{"key":24,"text":256,"correct":22},"组织体系的合理性",{"key":28,"text":258,"correct":26},"应急处置程序和措施的可行性",{"key":31,"text":260,"correct":26},"应急保障措施的衔接性",{"key":34,"text":262,"correct":26},"应急预案的针对性","AB",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":199,"analysis":37},938413,"PDAC 模式将环境管理体系要素分为（ ）、策划、改进。",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"组织所处的环境",{"key":24,"text":271,"correct":22},"领导作用",{"key":28,"text":273,"correct":22},"支持和运行",{"key":31,"text":275,"correct":26},"方针",{"key":34,"text":277,"correct":22},"绩效评价",{"id":279,"libraryId":5,"type":40,"typeLabel":41,"stem":280,"options":281,"answer":20,"analysis":37},938416,"工程项目环境影响评价的内容不包括（ ）。",[282,284,285,287],{"key":20,"text":283,"correct":22},"环境资源评价",{"key":24,"text":207,"correct":26},{"key":28,"text":286,"correct":26},"环境影响识别与预测",{"key":31,"text":209,"correct":26},{"id":289,"libraryId":5,"type":40,"typeLabel":41,"stem":290,"options":291,"answer":24,"analysis":37},938417,"在进行设计时，充分考虑产品部件及材料的可回收性、回收价值的大小、回收处理方法等与回收相关的一系列问题，这属于绿色设计中的（ ）方法。",[292,293,294,295],{"key":20,"text":49,"correct":26},{"key":24,"text":121,"correct":22},{"key":28,"text":51,"correct":26},{"key":31,"text":296,"correct":26},"清洁设计",{"id":298,"libraryId":5,"type":40,"typeLabel":41,"stem":299,"options":300,"answer":24,"analysis":37},938418,"下列不属于应急预案类型的是（ ）。",[301,302,304,305],{"key":20,"text":93,"correct":26},{"key":24,"text":303,"correct":22},"单项应急预案",{"key":28,"text":95,"correct":26},{"key":31,"text":97,"correct":26},{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":199,"analysis":37},938419,"安全措施计划的范围包括（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"安全技术措施",{"key":24,"text":313,"correct":22},"职业健康措施",{"key":28,"text":315,"correct":22},"辅助用室及设施",{"key":31,"text":317,"correct":26},"安全事故措施",{"key":34,"text":319,"correct":22},"安全宣传教育措施",{"id":321,"libraryId":5,"type":40,"typeLabel":41,"stem":322,"options":323,"answer":28,"analysis":37},938421,"施工单位应当对管理人员和作业人员（ ）安全生产教育培训。",[324,326,328,330],{"key":20,"text":325,"correct":26},"每月至少进行一次",{"key":24,"text":327,"correct":26},"每季度至少进行一次",{"key":28,"text":329,"correct":22},"每年至少进行一次",{"key":31,"text":331,"correct":26},"每年至少进行两次",{"id":333,"libraryId":5,"type":40,"typeLabel":41,"stem":334,"options":335,"answer":20,"analysis":37},938422,"工程项目实行施工总承包的，由（ ）对施工现场的安全生产负总责。",[336,338,340,342],{"key":20,"text":337,"correct":22},"总承包单位",{"key":24,"text":339,"correct":26},"专业承包单位",{"key":28,"text":341,"correct":26},"分包单位",{"key":31,"text":170,"correct":26},{"id":344,"libraryId":5,"type":40,"typeLabel":41,"stem":345,"options":346,"answer":20,"analysis":37},938423,"绿色设计的主要内容不包括（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"清洁生产设计",{"key":24,"text":350,"correct":26},"绿色材料选择与管理",{"key":28,"text":352,"correct":26},"产品的可回收性设计",{"key":31,"text":354,"correct":26},"产品的可拆卸性设计",{"id":356,"libraryId":5,"type":40,"typeLabel":41,"stem":357,"options":358,"answer":28,"analysis":37},938425,"造成6000万直接经济损失的事故属于（ ）。",[359,360,361,362],{"key":20,"text":87,"correct":26},{"key":24,"text":85,"correct":26},{"key":28,"text":83,"correct":22},{"key":31,"text":81,"correct":26},{"id":364,"libraryId":5,"type":40,"typeLabel":41,"stem":365,"options":366,"answer":28,"analysis":37},938426,"HSE逐步为大家所接受的时间和事件（地点）是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":26},"1986年，壳牌公司形成HSE手册文件",{"key":24,"text":370,"correct":26},"1988年，英国北海油田平台事故",{"key":28,"text":372,"correct":22},"1991年，荷兰海牙召开的第一届油气国际会议",{"key":31,"text":374,"correct":26},"1994年，壳牌公司正式HSE管理体系手册",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":389,"analysis":37},938427,"项目经理对项目相关人员进行分析，可以有效地（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":22},"开展协调工作",{"key":24,"text":382,"correct":22},"识别和确定与项目相关的关键人员",{"key":28,"text":384,"correct":26},"进行项目结构分解",{"key":31,"text":386,"correct":22},"选定项目团队成员",{"key":34,"text":388,"correct":26},"制订项目管理制度","ABD",{"id":391,"libraryId":5,"type":40,"typeLabel":41,"stem":392,"options":393,"answer":31,"analysis":37},938428,"下列不属于项目分解的方法的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":26},"按工作内容分解",{"key":24,"text":397,"correct":26},"按工作过程分解",{"key":28,"text":399,"correct":26},"按专业要素分解",{"key":31,"text":401,"correct":22},"按项目成本分解",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":416,"analysis":37},938429,"项目经理的主要工作包括（ ）。",[406,408,410,412,414],{"key":20,"text":407,"correct":26},"编制项目工作大纲",{"key":24,"text":409,"correct":22},"组建项目团队",{"key":28,"text":411,"correct":22},"召开项目启动会议",{"key":31,"text":413,"correct":22},"分析项目相关人员",{"key":34,"text":415,"correct":22},"组织制订团队各项具体计划","BCDE",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":199,"analysis":37},938430,"项目经理在整个项目执行当中的主要工作包括（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"建立工作基础",{"key":24,"text":424,"correct":22},"正式启动项目",{"key":28,"text":426,"correct":22},"管理团队工作",{"key":31,"text":428,"correct":26},"积极拓展并承接各类项目",{"key":34,"text":430,"correct":22},"项目结束阶段的工作",{"id":432,"libraryId":5,"type":40,"typeLabel":41,"stem":433,"options":434,"answer":28,"analysis":37},938432,"正确评估行业和技术发展给本项目带来的影响，属于项目经理的（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":26},"分析思维",{"key":24,"text":438,"correct":26},"信息收集",{"key":28,"text":440,"correct":22},"商业认知",{"key":31,"text":442,"correct":26},"项目决策",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":456,"analysis":37},938433,"项目团队正式开展工作以后，项目经理管理团队工作必须（ ）。",[447,448,450,452,454],{"key":20,"text":407,"correct":26},{"key":24,"text":449,"correct":22},"对项目全过程进行全面控制",{"key":28,"text":451,"correct":22},"协调相关关系",{"key":31,"text":453,"correct":22},"对团队成员工作进行指导",{"key":34,"text":455,"correct":26},"关心团队成员未来去向","BCD",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":416,"analysis":37},938434,"项目经理在项目实施中应承担的指导工作主要有（ ）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"落实人员分工",{"key":24,"text":464,"correct":22},"进行方法指导",{"key":28,"text":466,"correct":22},"培养团队精神",{"key":31,"text":468,"correct":22},"对成员提出具体要求",{"key":34,"text":470,"correct":22},"解决团队工作中的问题",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":214,"analysis":37},938435,"下列关于工程项目经理的表述，正确的有（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"项目经理可以是项目承担单位的法定代表人",{"key":24,"text":478,"correct":22},"项目经理可以是项目承担单位的法定代表人的代理人",{"key":28,"text":480,"correct":22},"项目经理是项目的直接领导与组织者",{"key":31,"text":482,"correct":26},"项目经理只负责沟通、传递指令",{"key":34,"text":484,"correct":22},"项目经理可以是公司以外的人",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":499,"analysis":37},938436,"关于编制项目工作计划的说法，正确的有（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"组织编制项目工作计划是项目经理的重要工作",{"key":24,"text":492,"correct":22},"项目工作计划是开展项目工作的规定性文件",{"key":28,"text":494,"correct":26},"项目工作计划的编制不受委托方影响",{"key":31,"text":496,"correct":26},"项目工作计划又称为项目工作大纲（TOR）",{"key":34,"text":498,"correct":22},"项目工作计划应包括项目工作进度计划","ABE",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":199,"analysis":37},938437,"对团队成员进行有效的控制是项目经理对项目进行全过程控制的关键，重点包括（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"进行适度的授权",{"key":24,"text":507,"correct":22},"进行必要的调整",{"key":28,"text":509,"correct":22},"进行经常性的检查",{"key":31,"text":511,"correct":26},"做好对外关系的协调",{"key":34,"text":513,"correct":22},"建立和保持有效、畅通的信息通道",{"id":515,"libraryId":5,"type":40,"typeLabel":41,"stem":516,"options":517,"answer":31,"analysis":37},938438,"下列关于项目经理的说法，错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":26},"项目经理是项目的直接领导和组织者",{"key":24,"text":521,"correct":26},"项目经理可以从公司内部产生，也可以从外部选聘",{"key":28,"text":523,"correct":26},"项目经理是对项目进行全过程管理控制的关键",{"key":31,"text":525,"correct":22},"项目经理接受项目任务后首先应开展的工作是编制项目工作计划",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":540,"analysis":37},938439,"项目经理要做好内外关系的协调，主要包括（ ）。",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"与委托方或顾客及时有效的沟通",{"key":24,"text":533,"correct":22},"与项目所在单位的有关领导保持信息的畅通",{"key":28,"text":535,"correct":22},"与项目所在单位的职能部门保持适当的互动关系",{"key":31,"text":537,"correct":22},"在团队内部形成统一、有序、高效的工作氛围",{"key":34,"text":539,"correct":26},"项目成果总结与报送","ABCD",{"id":542,"libraryId":5,"type":40,"typeLabel":41,"stem":543,"options":544,"answer":20,"analysis":37},938441,"员工对自己获得的报酬是否满意不仅要看绝对值，还要看相对值，要与自己纵向比较，也与别人进行横向比较，当比值相等时，员工就会感到满意，这在心理学上称为（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"公平理论",{"key":24,"text":548,"correct":26},"成就需要理论",{"key":28,"text":550,"correct":26},"双因素理论",{"key":31,"text":552,"correct":26},"需求层次理论",{"id":554,"libraryId":5,"type":40,"typeLabel":41,"stem":555,"options":556,"answer":20,"analysis":37},938442,"团队的工作开始进入有序化状态，培养了初步的团队精神，此时的团队处于（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"规范阶段",{"key":24,"text":560,"correct":26},"表现阶段",{"key":28,"text":562,"correct":26},"形成阶段",{"key":31,"text":564,"correct":26},"磨合阶段",{"id":566,"libraryId":5,"type":40,"typeLabel":41,"stem":567,"options":568,"answer":28,"analysis":37},938443,"团队的工作开始进入有序化状态是在团队发展经过（ ）之后。",[569,571,572,573],{"key":20,"text":570,"correct":26},"休整阶段",{"key":24,"text":558,"correct":26},{"key":28,"text":564,"correct":22},{"key":31,"text":560,"correct":26},{"id":575,"libraryId":5,"type":40,"typeLabel":41,"stem":576,"options":577,"answer":31,"analysis":37},938444,"让处于项目团队计划执行中最末端的团队成员参与团队计划的制订过程，属于团队能力开发中的（ ）活动。",[578,580,582,584],{"key":20,"text":579,"correct":26},"改善工作环境",{"key":24,"text":581,"correct":26},"表彰与奖励",{"key":28,"text":583,"correct":26},"进行人员配合训练",{"key":31,"text":585,"correct":22},"开展团队建设性",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":416,"analysis":37},938445,"项目雇员考核的作用包括（ ）。",[590,592,594,596,598],{"key":20,"text":591,"correct":26},"及时发现问题",{"key":24,"text":593,"correct":22},"有利于加强成员的团队意识",{"key":28,"text":595,"correct":22},"时刻提醒成员要完成的任务",{"key":31,"text":597,"correct":22},"调动成员积极性",{"key":34,"text":599,"correct":22},"提高成员工作效率",{"id":601,"libraryId":5,"type":40,"typeLabel":41,"stem":602,"options":603,"answer":24,"analysis":37},938446,"扩展完善后的马斯洛需求层次理论将人的需要划分为（ ）个层次。",[604,606,608,610],{"key":20,"text":605,"correct":26},"五",{"key":24,"text":607,"correct":22},"七",{"key":28,"text":609,"correct":26},"九",{"key":31,"text":611,"correct":26},"十",{"id":613,"libraryId":5,"type":40,"typeLabel":41,"stem":614,"options":615,"answer":28,"analysis":37},938447,"将项目团队部分人员放到恶劣的环境中生活一段时间，让其学会相互适应。这种做法在团队能力开发中称为（ ）。",[616,618,620,622],{"key":20,"text":617,"correct":26},"工作规程训练",{"key":24,"text":619,"correct":26},"奖惩训练",{"key":28,"text":621,"correct":22},"人员配合训练",{"key":31,"text":623,"correct":26},"团队建设训练",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":638,"analysis":37},938448,"关于项目团队表现阶段状态的表述，正确的有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":26},"团队工作开始进入有序状态",{"key":24,"text":631,"correct":22},"团队工作效率有较大提高",{"key":28,"text":633,"correct":22},"团队成员彼此高度信任",{"key":31,"text":635,"correct":26},"开始形成团队文化",{"key":34,"text":637,"correct":26},"成员分工再适当优化后即可稳定","BC",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":102,"analysis":37},938449,"评价是指对员工的工作业绩、工作态度、工作能力等方面进行检查和评定，可采取（ ）方式进行。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"指标考核",{"key":24,"text":646,"correct":22},"团队评议",{"key":28,"text":648,"correct":22},"自我评价",{"key":31,"text":650,"correct":26},"客户评价",{"key":34,"text":652,"correct":26},"领导考核",[654,657,660,663,666,669],{"id":40,"name":655,"category":7,"favorite":656},"领导干部任职前廉政法规知识测试题",92,{"id":658,"name":659,"category":7,"favorite":40},595,"建筑结构与设备",{"id":661,"name":662,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":664,"name":665,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":667,"name":668,"category":7,"favorite":8},534,"BIM工程师",{"id":670,"name":668,"category":7,"favorite":8},535]