[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":667},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,14,50,1948,[13,34,52,67,82,94,108,123,135,150,165,180,192,204,216,231,243,255,270,282,291,304,316,328,342,354,368,382,394,408,418,430,442,457,468,477,487,502,516,531,543,557,571,579,588,602,616,628,640,655],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},938334,1,"单选题","某工程施工到 2019 年 3 月 31 日时，得到如下数据：计划工作预算费用为 2800 万元，已 完工作预算费用为 3400 万元，已完工作实际费用为 3000 万元。则工程此时的进度偏差为( ) 万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","-200",false,{"key":24,"text":25,"correct":22},"B","200",{"key":27,"text":28,"correct":22},"C","400",{"key":30,"text":31,"correct":32},"D","600",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},938335,2,"多选题","设备及安装工程概算的编制方法包括（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"预算单价法",{"key":24,"text":43,"correct":32},"扩大单价法",{"key":27,"text":45,"correct":22},"类似工程预算法",{"key":30,"text":47,"correct":32},"综合吨位指标法",{"key":49,"text":50,"correct":32},"E","设备价值百分比法","ABDE",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},938337,"资金使用计划的表达方式包括（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"按子项目分解得到的资金使用计划表",{"key":24,"text":59,"correct":32},"时间－投资累计曲线",{"key":27,"text":61,"correct":22},"时标网络图",{"key":30,"text":63,"correct":32},"综合分解资金使用计划表",{"key":49,"text":65,"correct":22},"里程碑法","ABD",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":81,"analysis":33},938338,"工程量计算的评审包括（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"审查工程量计算规则的选用是否正确",{"key":24,"text":74,"correct":32},"审查工程量的计算是否存在重复计算现象",{"key":27,"text":76,"correct":32},"审查工程量汇总计算是否正确",{"key":30,"text":78,"correct":22},"审查是否按照有关规定计取企业管理费、规费及税金",{"key":49,"text":80,"correct":22},"审查材料价格的计取是否正确","ABC",{"id":83,"libraryId":5,"type":36,"typeLabel":37,"stem":84,"options":85,"answer":93,"analysis":33},938339,"建筑工程概算的编制方法有（ ）。",[86,88,90,91,92],{"key":20,"text":87,"correct":22},"预算定额法",{"key":24,"text":89,"correct":32},"概算指标法",{"key":27,"text":45,"correct":32},{"key":30,"text":41,"correct":22},{"key":49,"text":43,"correct":32},"BCE",{"id":95,"libraryId":5,"type":36,"typeLabel":37,"stem":96,"options":97,"answer":66,"analysis":33},938340,"暂列金额包括（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":32},"不可预见的材料、工程设备采购费",{"key":24,"text":101,"correct":32},"施工中可能发生的工程变更费用",{"key":27,"text":103,"correct":22},"零星工程费",{"key":30,"text":105,"correct":32},"索赔费用",{"key":49,"text":107,"correct":22},"现场管理费",{"id":109,"libraryId":5,"type":36,"typeLabel":37,"stem":110,"options":111,"answer":122,"analysis":33},938341,"建设投资可分为静态投资部分和动态投资部分。下列属于静态投资的有（ ）。",[112,114,116,118,120],{"key":20,"text":113,"correct":32},"建筑安装工程费",{"key":24,"text":115,"correct":32},"设备及工器具购置费",{"key":27,"text":117,"correct":22},"价差预备费",{"key":30,"text":119,"correct":22},"建设期利息",{"key":49,"text":121,"correct":32},"基本预备费","ABE",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":27,"analysis":33},938342,"工程造价管理机构确定一般技工最低日工资单价不得低于工程所在地人力资源和社会保障部门所发布的最低工资标准的（ ）倍。",[127,129,131,133],{"key":20,"text":128,"correct":22},"1.3",{"key":24,"text":130,"correct":22},"1.5",{"key":27,"text":132,"correct":32},"2",{"key":30,"text":134,"correct":22},"3",{"id":136,"libraryId":5,"type":36,"typeLabel":37,"stem":137,"options":138,"answer":149,"analysis":33},938343,"设计概算的编制依据有（ ）。",[139,141,143,145,147],{"key":20,"text":140,"correct":32},"工程造价管理机构发布的概算定额（或指标）",{"key":24,"text":142,"correct":22},"设计合同",{"key":27,"text":144,"correct":22},"施工单位编制的施工组织设计和施工方案",{"key":30,"text":146,"correct":32},"工程项目资金筹措方案",{"key":49,"text":148,"correct":32},"工程所在地编制同期的人工、材料、机械台班市场价格","ADE",{"id":151,"libraryId":5,"type":36,"typeLabel":37,"stem":152,"options":153,"answer":164,"analysis":33},938344,"企业管理费中的劳动保险和职工福利费包括（ ）",[154,156,158,160,162],{"key":20,"text":155,"correct":22},"职工劳动保护费",{"key":24,"text":157,"correct":32},"企业支付的职工退职金",{"key":27,"text":159,"correct":22},"职工教育经费",{"key":30,"text":161,"correct":32},"集体福利费",{"key":49,"text":163,"correct":32},"上下班交通补贴","BDE",{"id":166,"libraryId":5,"type":36,"typeLabel":37,"stem":167,"options":168,"answer":179,"analysis":33},938345,"人工费中的津贴补贴包括（ ）。",[169,171,173,175,177],{"key":20,"text":170,"correct":32},"流动施工津贴",{"key":24,"text":172,"correct":22},"法定节假日工作津贴",{"key":27,"text":174,"correct":32},"特殊地区施工津贴",{"key":30,"text":176,"correct":32},"高温（寒）作业临时津贴",{"key":49,"text":178,"correct":22},"夏季防暑降温津贴","ACD",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":20,"analysis":33},938346,"某工程施工到2019年5月31日，已完工作预算投资为8000万元，计划工作预算投资为8500万元，已完工作实际投资为8300万元。则此时的进度绩效指数为（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":32},"0.94",{"key":24,"text":187,"correct":22},"0.96",{"key":27,"text":189,"correct":22},"1.06",{"key":30,"text":191,"correct":22},"1.04",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":30,"analysis":33},938347,"竣工付款申请单的内容不包括（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"竣工结算合同总价",{"key":24,"text":199,"correct":22},"发包人已支付承包人的工程价款",{"key":27,"text":201,"correct":22},"应扣留的质量保证金",{"key":30,"text":203,"correct":32},"应支付的预付款",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":27,"analysis":33},938348,"通过对项目投资目标按时间进行分解，在网络计划基础上可做项目进度计划的（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":22},"直方图",{"key":24,"text":211,"correct":22},"香蕉图",{"key":27,"text":213,"correct":32},"横道图",{"key":30,"text":215,"correct":22},"S曲线",{"id":217,"libraryId":5,"type":36,"typeLabel":37,"stem":218,"options":219,"answer":230,"analysis":33},938349,"关于工程项目质量及其管理的说法，正确的有( )。",[220,222,224,226,228],{"key":20,"text":221,"correct":32},"工程项目质量是指工程项目产品、服务满足规定要求的程度",{"key":24,"text":223,"correct":32},"工程项目质量具有时效性和相对性的特点",{"key":27,"text":225,"correct":32},"对工程项目质量的要求可以是明示的",{"key":30,"text":227,"correct":32},"人员的工作质量是工程项目质量的基础",{"key":49,"text":229,"correct":22},"工程项目质量管理的目的是建设最优质量的工程项目","ABCD",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},938350,"工程质量管理的“三全控制”是指( )。",[235,237,239,241],{"key":20,"text":236,"correct":32},"全面质量控制、全过程质量控制和全员参与控制",{"key":24,"text":238,"correct":22},"全面质量控制、全方位质量控制、全员参与控制",{"key":27,"text":240,"correct":22},"全面要素质量控制、全方位质量控制、全员参与控制",{"key":30,"text":242,"correct":22},"全面要素质量控制、全过程质量控制、全员参与控制",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},938351,"下列关于试运行的质量管理的特点，说法正确的是( )。",[247,249,251,253],{"key":20,"text":248,"correct":32},"试运行是对项目质量的最终检验和试验",{"key":24,"text":250,"correct":22},"试运行是业主方和承包方的交接过程",{"key":27,"text":252,"correct":22},"试运行质量管理的目的是竣工验收",{"key":30,"text":254,"correct":22},"承包方要收集和管理试运行质最记录",{"id":256,"libraryId":5,"type":36,"typeLabel":37,"stem":257,"options":258,"answer":269,"analysis":33},938353,"工程咨询成果质量评价标准的基本方面包括（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":32},"工程咨询成果必须符合国家要求",{"key":24,"text":262,"correct":32},"工程咨询成果必须符合社会事业发展的根本利益",{"key":27,"text":264,"correct":32},"工程咨询成果必须符合业主的要求",{"key":30,"text":266,"correct":22},"工程咨询成果必须得出项目可行的结论",{"key":49,"text":268,"correct":32},"工程咨询成果必须满足建设各相关方的要求","ABCE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},938354,"设立工程咨询成果质量评价标准的基本原则不包括( )。",[274,276,278,280],{"key":20,"text":275,"correct":22},"能定量考核的尽可能采用定量标准",{"key":24,"text":277,"correct":22},"不能定量考核的应有明确定性要求",{"key":27,"text":279,"correct":22},"能真实反映工程项目的各种因素",{"key":30,"text":281,"correct":32},"可行性研究报告结论应满足审批需求",{"id":283,"libraryId":5,"type":36,"typeLabel":37,"stem":284,"options":285,"answer":269,"analysis":33},938355,"工程咨询成果质量评价标准的基本方面包括( )。",[286,287,288,289,290],{"key":20,"text":260,"correct":32},{"key":24,"text":262,"correct":32},{"key":27,"text":264,"correct":32},{"key":30,"text":266,"correct":22},{"key":49,"text":268,"correct":32},{"id":292,"libraryId":5,"type":36,"typeLabel":37,"stem":293,"options":294,"answer":230,"analysis":33},938356,"质量计划对外是质量保证文件，对内是质量控制文件。其内容包括( )。",[295,297,299,301,302],{"key":20,"text":296,"correct":32},"质量目标和质量要求",{"key":24,"text":298,"correct":32},"质量管理体系和管理职责",{"key":27,"text":300,"correct":32},"质量管理与协调的程序",{"key":30,"text":300,"correct":32},{"key":49,"text":303,"correct":22},"项目管理规划大纲",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":30,"analysis":33},938357,"（ ），可以消除专业设计人员对设计条件或相互联系中的误解、错误或遗漏，是保证设计质量的重要环节。",[308,310,312,314],{"key":20,"text":309,"correct":22},"加强设计标准化工作",{"key":24,"text":311,"correct":22},"加强设计质量流程管理",{"key":27,"text":313,"correct":22},"加强设计接口管理",{"key":30,"text":315,"correct":32},"加强设计文件会签管理",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":30,"analysis":33},938358,"为确保产品能够满足规定的使用要求或已知用途的要求，依据所策划的安排对工程设计进行的认可活动，此为（ ）工作。",[320,322,324,326],{"key":20,"text":321,"correct":22},"设计策划",{"key":24,"text":323,"correct":22},"设计评审",{"key":27,"text":325,"correct":22},"设计验证",{"key":30,"text":327,"correct":32},"设计确认",{"id":329,"libraryId":5,"type":36,"typeLabel":37,"stem":330,"options":331,"answer":269,"analysis":33},938359,"《质量管理体系基础和术语 GB\u002FT 19000-2016 》规定的质量管理原则的有( )。",[332,334,336,338,340],{"key":20,"text":333,"correct":32},"循证决策",{"key":24,"text":335,"correct":32},"改进",{"key":27,"text":337,"correct":32},"关系管理",{"key":30,"text":339,"correct":22},"方法与手段",{"key":49,"text":341,"correct":32},"以顾客为关注焦点",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},938360,"下列不属于质量计划包括的内容的是( )。",[346,348,350,352],{"key":20,"text":347,"correct":22},"明确各层次的质量目标和质量管理职能",{"key":24,"text":349,"correct":22},"明确各层次之问的配合和接口",{"key":27,"text":351,"correct":32},"确定和提供制定质量计划所需的资源",{"key":30,"text":353,"correct":22},"明确记录和报告数据的标准表格",{"id":355,"libraryId":5,"type":36,"typeLabel":37,"stem":356,"options":357,"answer":66,"analysis":33},938361,"工程项目质量管理的基本方法有( )。",[358,360,362,364,366],{"key":20,"text":359,"correct":32},"三阶段控制法",{"key":24,"text":361,"correct":32},"三全控制法",{"key":27,"text":363,"correct":22},"WBS 法",{"key":30,"text":365,"correct":32},"PDCA 循环管理法",{"key":49,"text":367,"correct":22},"网络图法",{"id":369,"libraryId":5,"type":36,"typeLabel":37,"stem":370,"options":371,"answer":230,"analysis":33},938362,"对于工业建设项目，前期工作的质量目标包括( )。",[372,374,376,378,380],{"key":20,"text":373,"correct":32},"贯彻宏观调控政策",{"key":24,"text":375,"correct":32},"市场调查分析",{"key":27,"text":377,"correct":32},"多方案比选",{"key":30,"text":379,"correct":32},"经济分析",{"key":49,"text":381,"correct":22},"财务分析",{"id":383,"libraryId":5,"type":36,"typeLabel":37,"stem":384,"options":385,"answer":51,"analysis":33},938363,"《工程咨询成果质量评价办法》规定，进行工业项目可行性研究报告的质量评价，应评 价( )等方面。",[386,388,389,391,392],{"key":20,"text":387,"correct":32},"风险分析",{"key":24,"text":377,"correct":32},{"key":27,"text":390,"correct":22},"社会需求",{"key":30,"text":375,"correct":32},{"key":49,"text":393,"correct":32},"贯彻宏观政策分析",{"id":395,"libraryId":5,"type":36,"typeLabel":37,"stem":396,"options":397,"answer":230,"analysis":33},938364,"根据中国工程咨询协会《工程咨询成果质量评价办法》，对工业项目可行性研究报告进 行生态环境影响论证情况综合评价时，需要评价的内容有( )。",[398,400,402,404,406],{"key":20,"text":399,"correct":32},"环境影响论证情况",{"key":24,"text":401,"correct":32},"制订环境治理措施情况",{"key":27,"text":403,"correct":32},"节能、节水、节约土地论证情况",{"key":30,"text":405,"correct":32},"消防、职业卫生论证情况",{"key":49,"text":407,"correct":22},"政策风险分析情况",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},938365,"针对某设计项目建立质量目标，规定质量要求和安排应开展的活动，指的是( )。",[412,413,414,416],{"key":20,"text":321,"correct":32},{"key":24,"text":323,"correct":22},{"key":27,"text":415,"correct":22},"设计控制",{"key":30,"text":417,"correct":22},"设计管理",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},938366,"不属于质量控制点内容的是( )。",[422,424,426,428],{"key":20,"text":423,"correct":32},"分部工程验收",{"key":24,"text":425,"correct":22},"严重影响项目质量的材料质量和性能",{"key":27,"text":427,"correct":22},"影响下道工序质量的技术间歇时间",{"key":30,"text":429,"correct":22},"容易出现质量通病的部位",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":30,"analysis":33},938367,"( )收到建设工程竣工报告后，应当组织设计、施工、工程监理等有关单位进行竣工验 收。",[434,436,438,440],{"key":20,"text":435,"correct":22},"监理单位",{"key":24,"text":437,"correct":22},"咨询单位",{"key":27,"text":439,"correct":22},"质量监督站",{"key":30,"text":441,"correct":32},"建设单位",{"id":443,"libraryId":5,"type":36,"typeLabel":37,"stem":444,"options":445,"answer":456,"analysis":33},938368,"根据《建设工程质量管理条例》，建设工程竣工验收应当具备的条件有( )。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"有建设单位签署的工程保修书",{"key":24,"text":449,"correct":22},"完成工程结算备案",{"key":27,"text":451,"correct":32},"有主要建筑材料的进场试验报告",{"key":30,"text":453,"correct":22},"有监理单位和施工单位共同签署的质量合格文件",{"key":49,"text":455,"correct":32},"有勘察单位签署的质量合格文件","CE",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":30,"analysis":33},938369,"组织实施项目试运行工作的是( )。",[461,462,464,466],{"key":20,"text":437,"correct":22},{"key":24,"text":463,"correct":22},"设计单位",{"key":27,"text":465,"correct":22},"施工单位",{"key":30,"text":467,"correct":32},"业主单位",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},938370,"质量管理的方法很多，其中“对质量进行事前控制、事中控制和事后控制”，此为质量管理方法中的（ ）。",[472,473,474,475],{"key":20,"text":359,"correct":32},{"key":24,"text":361,"correct":22},{"key":27,"text":365,"correct":22},{"key":30,"text":476,"correct":22},"全员参与法",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},938371,"根据《质量管理体系 基础和术语》，质量管理的 7 项原则中，（ ）是基于数据和信息的分析和评价的决策，更有可能产生期望的结果。",[481,483,485,486],{"key":20,"text":482,"correct":22},"领导作用",{"key":24,"text":484,"correct":22},"过程方法",{"key":27,"text":333,"correct":32},{"key":30,"text":337,"correct":22},{"id":488,"libraryId":5,"type":36,"typeLabel":37,"stem":489,"options":490,"answer":501,"analysis":33},938372,"工程咨询单位在试运行阶段的质量管理工作主要包括（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"审查勘察纲要编制情况",{"key":24,"text":494,"correct":32},"督促承包方编制培训计划",{"key":27,"text":496,"correct":32},"协助建设单位编制试运行方案",{"key":30,"text":498,"correct":32},"督促承包方编制试运行管理计划",{"key":49,"text":500,"correct":22},"督促承包方编制试运行总结报告","BCD",{"id":503,"libraryId":5,"type":36,"typeLabel":37,"stem":504,"options":505,"answer":501,"analysis":33},938373,"工程咨询单位应组织设计单位在各设计阶段申报相应技术审批文件，通过审查并取得政府许可。下列技术文件属于施工图设计阶段需报政府审批的有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":22},"交通设计",{"key":24,"text":509,"correct":32},"人防设计",{"key":27,"text":511,"correct":32},"消防设计",{"key":30,"text":513,"correct":32},"施工图设计",{"key":49,"text":515,"correct":22},"建设工程规划许可证",{"id":517,"libraryId":5,"type":36,"typeLabel":37,"stem":518,"options":519,"answer":530,"analysis":33},938374,"根据《建设工程项目管理规范》相关规定，下列属于施工质量控制流程的有（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"确定质量计划",{"key":24,"text":523,"correct":32},"施工质量目标分解",{"key":27,"text":525,"correct":32},"施工质量偏差控制",{"key":30,"text":527,"correct":32},"施工技术交底与工序控制",{"key":49,"text":529,"correct":32},"产品或服务的验证.评价和防护","BCDE",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":30,"analysis":33},938376,"工程勘察工作的三个阶段不包括（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"可行性研究勘察",{"key":24,"text":538,"correct":22},"初步勘察",{"key":27,"text":540,"correct":22},"详细勘察",{"key":30,"text":542,"correct":32},"施工勘察",{"id":544,"libraryId":5,"type":36,"typeLabel":37,"stem":545,"options":546,"answer":230,"analysis":33},938377,"工程项目质量是指工程项目产品、服务满足（ ）的程度。",[547,549,551,553,555],{"key":20,"text":548,"correct":32},"适用性",{"key":24,"text":550,"correct":32},"可靠性",{"key":27,"text":552,"correct":32},"经济性",{"key":30,"text":554,"correct":32},"协调性",{"key":49,"text":556,"correct":22},"系统性",{"id":558,"libraryId":5,"type":36,"typeLabel":37,"stem":559,"options":560,"answer":66,"analysis":33},938378,"机械对工程项目质量有直接影响，所以在机械选型及性能参数确定时，应考虑的因素有（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":32},"经济上的合理性",{"key":24,"text":564,"correct":32},"技术上的先进性",{"key":27,"text":566,"correct":22},"操作者技术熟练",{"key":30,"text":568,"correct":32},"使用操作及维护上的便利性",{"key":49,"text":570,"correct":22},"适应环境",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":30,"analysis":33},938382,"设立工程咨询成果质量评价标准的基本原则不包括（ ）。",[575,576,577,578],{"key":20,"text":275,"correct":22},{"key":24,"text":277,"correct":22},{"key":27,"text":279,"correct":22},{"key":30,"text":281,"correct":32},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},938383,"就审查合格的施工图设计文件向施工单位做出详细说明，这是（ ）的质量责任。",[583,584,585,587],{"key":20,"text":441,"correct":22},{"key":24,"text":463,"correct":32},{"key":27,"text":586,"correct":22},"勘察单位",{"key":30,"text":435,"correct":22},{"id":589,"libraryId":5,"type":36,"typeLabel":37,"stem":590,"options":591,"answer":122,"analysis":33},938384,"关于试运行的质量管理，正确的有（ ）。",[592,594,596,598,600],{"key":20,"text":593,"correct":32},"业主方应负责试运行全面组织和指挥",{"key":24,"text":595,"correct":32},"承包方负责技术服务工作",{"key":27,"text":597,"correct":22},"无负荷试运合格后即可进行生产考核",{"key":30,"text":599,"correct":22},"试运行方案由承包方负责编制",{"key":49,"text":601,"correct":32},"试运行人员培训由业主方组织进行",{"id":603,"libraryId":5,"type":36,"typeLabel":37,"stem":604,"options":605,"answer":149,"analysis":33},938385,"质量计划的内容包括（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":32},"各层次的质量目标和质量管理职能",{"key":24,"text":609,"correct":22},"实现质量目标的投资计划",{"key":27,"text":611,"correct":22},"实现质量目标的进度安排",{"key":30,"text":613,"correct":32},"实现质量目标的过程顺序",{"key":49,"text":615,"correct":32},"实现质量目标必需的资源",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":20,"analysis":33},938386,"工业项目可行性研究报告的质量标准中，贯彻宏观调控政策情况的综合评价标准不包括对（ ）的论证。",[620,622,624,626],{"key":20,"text":621,"correct":32},"效益估算可靠性",{"key":24,"text":623,"correct":22},"符合布局政策",{"key":27,"text":625,"correct":22},"优化产品结构",{"key":30,"text":627,"correct":22},"符合经济规模",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":30,"analysis":33},938388,"工程项目HSE管理的任务不包括（ ）。",[632,634,636,638],{"key":20,"text":633,"correct":22},"建立完善的HSE管理体系",{"key":24,"text":635,"correct":22},"按照HSE管理体系要求对项目进行持续的HSE管理",{"key":27,"text":637,"correct":22},"加强对HSE管理必需资源的管理",{"key":30,"text":639,"correct":32},"加强对HSE进度的管理",{"id":641,"libraryId":5,"type":36,"typeLabel":37,"stem":642,"options":643,"answer":654,"analysis":33},938389,"绿色施工的原则包括( )。",[644,646,648,650,652],{"key":20,"text":645,"correct":32},"关注工程项目的可持续发展，合理利用资源、能源",{"key":24,"text":647,"correct":22},"采用模块化、循环设计、并行工程设计方法",{"key":27,"text":649,"correct":32},"注重环境品质，减少施工造成的环境污染",{"key":30,"text":651,"correct":22},"建立施工责任制",{"key":49,"text":653,"correct":32},"结合气候、气象条件，合理安排施工计划","ACE",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":24,"analysis":33},938390,"根据《生产事故报吿和调查处理条例》，重大事故、较大事故、一般事故，负责事 故调查的人民政府应当自收到事故调查报告之口起( )日内做出批复。",[659,661,663,665],{"key":20,"text":660,"correct":22},"10",{"key":24,"text":662,"correct":32},"15",{"key":27,"text":664,"correct":22},"20",{"key":30,"text":666,"correct":22},"30",[668,671,674,677,680,683],{"id":15,"name":669,"category":7,"favorite":670},"领导干部任职前廉政法规知识测试题",92,{"id":672,"name":673,"category":7,"favorite":15},595,"建筑结构与设备",{"id":675,"name":676,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":678,"name":679,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":681,"name":682,"category":7,"favorite":8},534,"BIM工程师",{"id":684,"name":682,"category":7,"favorite":8},535]