[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,13,50,1948,[13,34,46,58,76,88,100,115,127,139,151,163,173,184,196,208,217,232,243,255,266,278,287,299,311,323,337,346,358,369,379,394,406,421,433,445,457,472,483,495,507,518,530,539,551,562,573,587,599,611],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},938281,1,"单选题","勘察责任为（ ）终身责任制。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","勘察单位负责人",false,{"key":24,"text":25,"correct":26},"B","勘察单位项目负责人",true,{"key":28,"text":29,"correct":22},"C","勘察单位项目技术负责人",{"key":31,"text":32,"correct":22},"D","勘察单位技术负责人","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},938282,"根据 FIDIC《施工合同条件》，承包商未能在规定时间内修复缺陷工程部位，业主可雇用他人完成，费用从（ ）内扣除。",[38,40,42,44],{"key":20,"text":39,"correct":26},"保留金",{"key":24,"text":41,"correct":22},"工程进度款",{"key":28,"text":43,"correct":22},"预付款",{"key":31,"text":45,"correct":22},"履约保证金",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},938283,"FIDIC 中关于竣工验收阶段的合同管理的说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程师在收到承包商资料后 14 天进行竣工检验",{"key":24,"text":53,"correct":26},"工程师在接到承包商申请后的 28 天内，如果认为满足竣工条件，即可颁发工程接收证书",{"key":28,"text":55,"correct":22},"承包商完成所有工作，即具备基本竣工条件",{"key":31,"text":57,"correct":22},"颁发接收证书后，即进入缺陷责任期",{"id":59,"libraryId":5,"type":60,"typeLabel":61,"stem":62,"options":63,"answer":75,"analysis":33},938284,2,"多选题","工程项目合同管理的基本原则有（ ）。",[64,66,68,70,72],{"key":20,"text":65,"correct":26},"公平原则",{"key":24,"text":67,"correct":22},"独立原则",{"key":28,"text":69,"correct":26},"诚信原则",{"key":31,"text":71,"correct":26},"平等自愿原则",{"key":73,"text":74,"correct":22},"E","公正原则","ACD",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":24,"analysis":33},938285,"某分部工程双代号时标网络计划如图 9－16 所示，则工作 B 的总时差和自由时差分别是 ( )。",[80,82,84,86],{"key":20,"text":81,"correct":22},"0 天，0 天",{"key":24,"text":83,"correct":26},"2 天，0 天",{"key":28,"text":85,"correct":22},"2 天，2 天",{"key":31,"text":87,"correct":22},"4 天，0 天",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":28,"analysis":33},938286,"工程项目进度计划的优化方法有( )种。",[92,94,96,98],{"key":20,"text":93,"correct":22},"1",{"key":24,"text":95,"correct":22},"2",{"key":28,"text":97,"correct":26},"3",{"key":31,"text":99,"correct":22},"4",{"id":101,"libraryId":5,"type":60,"typeLabel":61,"stem":102,"options":103,"answer":114,"analysis":33},938287,"某分部工程双代号网络计划如下图所示，其作图错误包括（ ）",[104,106,108,110,112],{"key":20,"text":105,"correct":22},"有多个起点节点",{"key":24,"text":107,"correct":26},"有多个终点节点",{"key":28,"text":109,"correct":26},"存在循环回路",{"key":31,"text":111,"correct":26},"节点编号重复",{"key":73,"text":113,"correct":26},"节点编号有误","BCDE",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},938288,"工作定义的方法不包括（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"专家判断",{"key":24,"text":122,"correct":22},"分解法",{"key":28,"text":124,"correct":22},"滚动式规划",{"key":31,"text":126,"correct":26},"模拟法",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":31,"analysis":33},938289,"双代号网络计划中，关键工作是指（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"自由时差最小的工作",{"key":24,"text":134,"correct":22},"两端节点均为关键节点的工作",{"key":28,"text":136,"correct":22},"持续时间最长的工作",{"key":31,"text":138,"correct":26},"最迟完成时间与最早完成时间的相差最小的工作",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},938290,"M 工作有 2 个紧前工作，其持续时间分别是 6 天和 10 天，最早开工时间分别为第 15 天和 第 20 天，则 M 工作的最早开始时间为第( )天。",[143,145,147,149],{"key":20,"text":144,"correct":26},"30",{"key":24,"text":146,"correct":22},"26",{"key":28,"text":148,"correct":22},"25",{"key":31,"text":150,"correct":22},"21",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},938291,"在双代号或单代号网络计划中，工作的最早开始时间为其所有紧前工作( )。",[155,157,159,161],{"key":20,"text":156,"correct":26},"最早完成时间的最大值",{"key":24,"text":158,"correct":22},"最早完成时间的最小值",{"key":28,"text":160,"correct":22},"最迟完成时间的最大值",{"key":31,"text":162,"correct":22},"最迟完成时间的最小值",{"id":164,"libraryId":5,"type":60,"typeLabel":61,"stem":165,"options":166,"answer":114,"analysis":33},938292,"某分部工程双代号网络计划如下图所示，其作图错误包括( )",[167,168,169,170,172],{"key":20,"text":105,"correct":22},{"key":24,"text":107,"correct":26},{"key":28,"text":109,"correct":26},{"key":31,"text":171,"correct":26},"工作代号重复",{"key":73,"text":113,"correct":26},{"id":174,"libraryId":5,"type":60,"typeLabel":61,"stem":175,"options":176,"answer":183,"analysis":33},938293,"某分部工程双代号网络图如下图所示，其作图错误表现为( )。",[177,178,179,180,181],{"key":20,"text":105,"correct":26},{"key":24,"text":107,"correct":22},{"key":28,"text":113,"correct":22},{"key":31,"text":109,"correct":22},{"key":73,"text":182,"correct":26},"有多余虚工作","AE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},938294,"有关里程碑的说法，不正确的是（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":26},"里程碑是项目中的关键工作",{"key":24,"text":191,"correct":22},"里程碑清单列出了所有项目里程碑",{"key":28,"text":193,"correct":22},"里程碑与常规的进度工作类似",{"key":31,"text":195,"correct":22},"里程碑的持续时间为零",{"id":197,"libraryId":5,"type":60,"typeLabel":61,"stem":198,"options":199,"answer":207,"analysis":33},938295,"工作定义的方法包括( )。",[200,201,202,204,205],{"key":20,"text":120,"correct":26},{"key":24,"text":122,"correct":26},{"key":28,"text":203,"correct":26},"模板法",{"key":31,"text":124,"correct":26},{"key":73,"text":206,"correct":22},"工作清单","ABCD",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":28,"analysis":33},938296,"某工作网络计划中，N 工作的最早开始时间和最早完成时间分别为第 6 天和第 10 天，最 迟开始时间和最迟完成时间分别为第 9 天和第 13 天，则工作 N 的总时差为( )天。",[212,214,215,216],{"key":20,"text":213,"correct":22},"5",{"key":24,"text":99,"correct":22},{"key":28,"text":97,"correct":26},{"key":31,"text":95,"correct":22},{"id":218,"libraryId":5,"type":60,"typeLabel":61,"stem":219,"options":220,"answer":231,"analysis":33},938297,"进度计划的优化方法包括( )。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"工期优化",{"key":24,"text":224,"correct":26},"费用优化",{"key":28,"text":226,"correct":22},"工艺优化",{"key":31,"text":228,"correct":22},"质量优化",{"key":73,"text":230,"correct":26},"资源优化","ABE",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},938298,"对工作分解结构(WBS)中规定的可交付成果或半成品必须进行的工作进行界定，并形成相 应的文件，这是( )的含义。",[236,238,239,241],{"key":20,"text":237,"correct":22},"工作成果",{"key":24,"text":206,"correct":22},{"key":28,"text":240,"correct":22},"工作顺序",{"key":31,"text":242,"correct":26},"工作定义",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":33},938299,"关于双代号时标网络计划的说法，错误的是( )。",[247,249,251,253],{"key":20,"text":248,"correct":22},"实箭线的水平投影长度表示该工作的持续时间",{"key":24,"text":250,"correct":22},"波形线表示工作与其紧后工作之间的时间间隔",{"key":28,"text":252,"correct":26},"时标网络计划宜按各项工作的最晚开始时间编制",{"key":31,"text":254,"correct":22},"双代号时标网络计划以水平时间坐标为尺度进行绘制",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},938300,"下列关于双代号时标网络计划的表述中，正确的是( )。",[259,261,263,264],{"key":20,"text":260,"correct":22},"双代号时标网络计划只能表示工作的开始和完成时间",{"key":24,"text":262,"correct":26},"虚箭线只能垂直画是因为虚工作的持续时间为零",{"key":28,"text":252,"correct":22},{"key":31,"text":265,"correct":22},"双代号时标网络计划必须以天为时标单位",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":28,"analysis":33},938301,"在双代号或单代号网络计划中，判别为关键工作的条件是该工作( )。",[270,272,274,276],{"key":20,"text":271,"correct":22},"自由时差最小",{"key":24,"text":273,"correct":22},"与其紧后工作之间的时间间隔为零",{"key":28,"text":275,"correct":26},"最迟开始与最早开始时间的差值最小",{"key":31,"text":277,"correct":22},"资源消耗最多",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":28,"analysis":33},938302,"某工程网络计划中，N 工作的最早开始时间和最早完成时间分别为第 5 天和第 7 天，最迟 开始时间和最迟完成时间分别为第 8 天和第 10 天，则 N 工作的总时差是( )天。",[282,284,285,286],{"key":20,"text":283,"correct":22},"6",{"key":24,"text":99,"correct":22},{"key":28,"text":97,"correct":26},{"key":31,"text":95,"correct":22},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":24,"analysis":33},938303,"某工程双代号时标网络计划如下图所示，其中工作 A 和 E 的总时差分别为( )。",[291,293,295,297],{"key":20,"text":292,"correct":22},"均为 1 月",{"key":24,"text":294,"correct":26},"分别为 1 月和 2 月",{"key":28,"text":296,"correct":22},"均为 2 月",{"key":31,"text":298,"correct":22},"分别为 2 月和 1 月",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},938304,"某工程双代号时标网络计划如下图所示，其中工作 E 的自由时差为( )。",[303,305,307,309],{"key":20,"text":304,"correct":22},"0 周",{"key":24,"text":306,"correct":26},"1 周",{"key":28,"text":308,"correct":22},"3 周",{"key":31,"text":310,"correct":22},"2 周",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},938305,"工程网络计划的工期优化是通过( )，使计算工期满足要求工期。",[315,317,319,321],{"key":20,"text":316,"correct":22},"改变关键工作之间的逻辑关系",{"key":24,"text":318,"correct":22},"将关键工作压缩成非关键工作",{"key":28,"text":320,"correct":22},"压缩直接费最小的工作的持续时间",{"key":31,"text":322,"correct":26},"压缩关键工作的持续时间",{"id":324,"libraryId":5,"type":60,"typeLabel":61,"stem":325,"options":326,"answer":183,"analysis":33},938306,"工程网络计划工期优化的目的是为了( )。",[327,329,331,333,335],{"key":20,"text":328,"correct":26},"缩短计算工期",{"key":24,"text":330,"correct":22},"寻求资源有限条件下的最短工期",{"key":28,"text":332,"correct":22},"寻求资源均衡条件下的最优工期",{"key":31,"text":334,"correct":22},"寻求最低成本时的最优工期",{"key":73,"text":336,"correct":26},"在一定约束条件下使工期最短",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},938307,"已知某工程网络计划如下图所示，该工程工作 E 的最迟开始时间是（ ）。（单位为：天）",[341,342,343,344],{"key":20,"text":97,"correct":22},{"key":24,"text":213,"correct":26},{"key":28,"text":283,"correct":22},{"key":31,"text":345,"correct":22},"7",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},938309,"工程项目进度管理工作包括：①工作定义；②工作排序；③工作进度控制；④工作进度计划制定；⑤工作时间估计。正确的顺序是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"①—②—③—④—⑤",{"key":24,"text":353,"correct":26},"①—②—⑤—④—③",{"key":28,"text":355,"correct":22},"①—③—②—⑤—④",{"key":31,"text":357,"correct":22},"①—⑤—②—③—④",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},938310,"关于双代号时标网络图的叙述错误的是（ ）。",[362,363,365,367],{"key":20,"text":248,"correct":22},{"key":24,"text":364,"correct":22},"时标网络计划宜按各工作的最早开始时间绘制",{"key":28,"text":366,"correct":26},"工作箭线中波形线的水平投影长度表示其自由时差",{"key":31,"text":368,"correct":22},"能标明计划的时间过程和关键线路",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},938311,"某网络计划中，工作 A 的紧后工作是 B 和 C，工作 B 的最迟开始时间是 14，最早开始时间是 10；工作 C 的最迟完成时间是 16，最早完成时间是 14；工作 A 与工作 B 和工作 C 的间隔时间均为 5 天，工作 A 的总时差为（ ）天。",[373,374,375,377],{"key":20,"text":97,"correct":22},{"key":24,"text":345,"correct":26},{"key":28,"text":376,"correct":22},"8",{"key":31,"text":378,"correct":22},"10",{"id":380,"libraryId":5,"type":60,"typeLabel":61,"stem":381,"options":382,"answer":393,"analysis":33},938312,"某分部工程双代号时标网络计划如图所示，关键工作有（ ）。",[383,385,387,389,391],{"key":20,"text":384,"correct":26},"工作 A",{"key":24,"text":386,"correct":22},"工作 B",{"key":28,"text":388,"correct":26},"工作 C",{"key":31,"text":390,"correct":22},"工作 E",{"key":73,"text":392,"correct":26},"工作 F","ACE",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},938314,"建筑安装工程费用的税金是指国家税法规定应计入建筑安装工程造价内的( )。",[398,400,402,404],{"key":20,"text":399,"correct":26},"增值税销项税额",{"key":24,"text":401,"correct":22},"增值税进项税额",{"key":28,"text":403,"correct":22},"增值税销项税额-增值税进项税额",{"key":31,"text":405,"correct":22},"增值税进项税额-增值税销项税额",{"id":407,"libraryId":5,"type":60,"typeLabel":61,"stem":408,"options":409,"answer":420,"analysis":33},938315,"资金筹措费包括（ ）。",[410,412,414,416,418],{"key":20,"text":411,"correct":26},"各类借款利息",{"key":24,"text":413,"correct":26},"贷款评估费",{"key":28,"text":415,"correct":26},"国外借款手续费",{"key":31,"text":417,"correct":22},"建设期内利率变化增加的费用",{"key":73,"text":419,"correct":22},"人工、设备、材料、施工机具的价差费","ABC",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},938316,"某工程原定 2018 年 9 月 22 日竣工，因承包人原因，致使工程延至 2018 年 11 月 22 日竣工。当地2018 年 10 月 1 日，因法规的变化导致工程造价增加 100 万元，则其工程合同价款应（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"调增 50 万元",{"key":24,"text":428,"correct":22},"调减 100 万元",{"key":28,"text":430,"correct":22},"调增 100 万元",{"key":31,"text":432,"correct":26},"不予调整",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},938317,"某土方工程，招标文件中估计工程量为 1.5 万 m3，合同中约定土方工程单价为 17.5 元／m3，当实际工程量超过估计工程量 15%时，超过部分单价调整为 15.2 元／m3。该工程实际完成土方工程量 1.7 万 m3，则土方工程实际结算工程款为（ ）万元。",[437,439,441,443],{"key":20,"text":438,"correct":22},"25.84",{"key":24,"text":440,"correct":22},"28.50",{"key":28,"text":442,"correct":22},"29.29",{"key":31,"text":444,"correct":26},"29.75",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},938318,"工程量偏差引起合同价款调整，下列说法错误的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"当工程量增加 15%以上时，其增加部分的工程量的综合单价应予调低",{"key":24,"text":452,"correct":22},"当工程量减少 15%以上时，减少后剩余部分的工程量的综合单价应予调高",{"key":28,"text":454,"correct":26},"措施项目按单一总价方式计价，工程量偏差超过 15%时，措施项目费不变",{"key":31,"text":456,"correct":22},"措施项目按系数方式计价，工程量偏差超过 15%，且该变化引起措施项目相应发生变化，则工程量增加的，措施项目费调增；工程量减少的，措施项目费调减",{"id":458,"libraryId":5,"type":60,"typeLabel":61,"stem":459,"options":460,"answer":471,"analysis":33},938319,"工程建设其他费用中，与未来企业生产经营有关的费用主要有( )。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"建设管理费",{"key":24,"text":464,"correct":22},"勘察设计费",{"key":28,"text":466,"correct":22},"研究试验费",{"key":31,"text":468,"correct":26},"联合试运转费",{"key":73,"text":470,"correct":26},"生产准备费","DE",{"id":473,"libraryId":5,"type":60,"typeLabel":61,"stem":474,"options":475,"answer":207,"analysis":33},938320,"下列费用中，属于工程建设其他费的有( )。",[476,477,478,479,481],{"key":20,"text":466,"correct":26},{"key":24,"text":462,"correct":26},{"key":28,"text":468,"correct":26},{"key":31,"text":480,"correct":26},"土地使用费和其他补偿费",{"key":73,"text":482,"correct":22},"铺底流动资金",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},938322,"某施工机械预算价格为 100 万元，折旧年限为 10 年，年平均工作 225 个台班，残值率为 4%，则该机械台班折旧费为( )元。",[487,489,491,493],{"key":20,"text":488,"correct":22},"326.67",{"key":24,"text":490,"correct":26},"426.67",{"key":28,"text":492,"correct":22},"326.17",{"key":31,"text":494,"correct":22},"416.67",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},938323,"企业管理费费率的计算基础不包括( )。",[499,501,503,505],{"key":20,"text":500,"correct":22},"分部分项工程费",{"key":24,"text":502,"correct":22},"人工费和机械费合计",{"key":28,"text":504,"correct":22},"人工费",{"key":31,"text":506,"correct":26},"机械费",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},938324,"社会保险费和住房公积金应以( )为计算基础，根据工程所在地省、自治区、直辖市或 行业建设主管部门规定费率计算。。",[511,513,515,516],{"key":20,"text":512,"correct":26},"定额人工费",{"key":24,"text":514,"correct":22},"定额分部分项工程费",{"key":28,"text":512,"correct":22},{"key":31,"text":517,"correct":22},"定额人工费+定额机械费",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},938325,"当采用一般计税方法时，建筑业增值税税率为( )。",[522,524,526,528],{"key":20,"text":523,"correct":22},"7%",{"key":24,"text":525,"correct":26},"9%",{"key":28,"text":527,"correct":22},"10%",{"key":31,"text":529,"correct":22},"13%",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},938326,"当采用简易计税方法时，建筑业增值税征收率为( )。",[534,535,536,537],{"key":20,"text":523,"correct":22},{"key":24,"text":525,"correct":22},{"key":28,"text":527,"correct":22},{"key":31,"text":538,"correct":26},"3%",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},938327,"当初步设计有详细的设备清单时，编制设备安装工程概算宜采用( )。",[543,545,547,549],{"key":20,"text":544,"correct":22},"概算指标法",{"key":24,"text":546,"correct":26},"预算单价法",{"key":28,"text":548,"correct":22},"实物指标法",{"key":31,"text":550,"correct":22},"扩大单价法",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},938328,"安装预算单价及扩大综合单价不全时，编制设备安装工程概算可采用( )。",[555,556,558,560],{"key":20,"text":544,"correct":26},{"key":24,"text":557,"correct":22},"实物法",{"key":28,"text":559,"correct":22},"估算指标法",{"key":31,"text":561,"correct":22},"费用分解法",{"id":563,"libraryId":5,"type":60,"typeLabel":61,"stem":564,"options":565,"answer":393,"analysis":33},938329,"设备安装工程概算编制方法主要有( )。",[566,567,569,570,572],{"key":20,"text":546,"correct":26},{"key":24,"text":568,"correct":22},"定额指标法",{"key":28,"text":550,"correct":26},{"key":31,"text":571,"correct":22},"工程量清单法",{"key":73,"text":544,"correct":26},{"id":574,"libraryId":5,"type":60,"typeLabel":61,"stem":575,"options":576,"answer":207,"analysis":33},938330,"建设工程项目总概算的组成内容主要有( )",[577,579,581,583,585],{"key":20,"text":578,"correct":26},"单项工程综合概算",{"key":24,"text":580,"correct":26},"工程建设其他费用概算",{"key":28,"text":582,"correct":26},"资金筹措费、预备费概算",{"key":31,"text":584,"correct":26},"经营性项目铺底流动资金概算",{"key":73,"text":586,"correct":22},"经营期利息概算",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},938331,"暂估材料或工程设备的单价确定后，在综合单价中( )。",[591,593,595,597],{"key":20,"text":592,"correct":26},"只应取代原暂估单价",{"key":24,"text":594,"correct":22},"应取代原暂估单价并考虑企业管理费变动",{"key":28,"text":596,"correct":22},"应取代原暂估单价并考虑利润变动",{"key":31,"text":598,"correct":22},"应取代原暂估单价并考虑规费和税金变动",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":20,"analysis":33},938332,"用赢得值法进行费用—进度绩效评价时，若进度偏差大于 0，进度绩效指数大于 1，说明 ( )。",[603,605,607,609],{"key":20,"text":604,"correct":26},"进度比计划提前",{"key":24,"text":606,"correct":22},"进度按计划进行",{"key":28,"text":608,"correct":22},"进度比计划拖后",{"key":31,"text":610,"correct":22},"费用比计划结余",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":31,"analysis":33},938333,"用赢得值法进行费用、进度综合分析时，需要的基本参数不包括( )。",[615,617,619,621],{"key":20,"text":616,"correct":22},"计划工作预算费用",{"key":24,"text":618,"correct":22},"已完工作实际费用",{"key":28,"text":620,"correct":22},"已完工作预算费用",{"key":31,"text":622,"correct":26},"全部工作结算费用",[624,627,630,633,636,639],{"id":15,"name":625,"category":7,"favorite":626},"领导干部任职前廉政法规知识测试题",92,{"id":628,"name":629,"category":7,"favorite":15},595,"建筑结构与设备",{"id":631,"name":632,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":634,"name":635,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":637,"name":638,"category":7,"favorite":8},534,"BIM工程师",{"id":640,"name":638,"category":7,"favorite":8},535]