[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":647},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,12,50,1948,[13,34,46,64,79,91,103,115,127,139,151,163,178,192,206,220,232,244,259,271,283,297,308,320,332,346,358,373,385,397,409,423,435,450,460,472,484,498,509,521,533,541,553,565,575,587,599,611,623,635],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},938229,1,"单选题","仅对技术建议书的质量进行评审，而与技术建议书排名最高的咨询公司就财务建议书与合同进行谈判的一种方法是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","基于质量和费用的选择",false,{"key":24,"text":25,"correct":26},"B","基于质量的选择",true,{"key":28,"text":29,"correct":22},"C","固定预算下的选择",{"key":31,"text":32,"correct":22},"D","最低费用的选择","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},938230,"投标人或者其他利害关系人认为电子招标投标活动不符合有关规定的，应通过（ ）进行投诉。",[38,40,42,44],{"key":20,"text":39,"correct":22},"行业监督平台",{"key":24,"text":41,"correct":22},"交易平台",{"key":28,"text":43,"correct":22},"公共服务平台",{"key":31,"text":45,"correct":26},"行政监督平台",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},938231,2,"多选题","有关资格审查的说法，正确的有（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"资格预审是指在招标前对潜在投标人进行的资格审查",{"key":24,"text":55,"correct":26},"资格后审是指在开标后对投标人进行的资格审查",{"key":28,"text":57,"correct":22},"进行资格预审的，不再进行资格后审",{"key":31,"text":59,"correct":26},"招标人不得以不合理的条件限制、排斥潜在投标人或者投标人",{"key":61,"text":62,"correct":22},"E","招标人可以以没有载明的资格条件对潜在投标人或者投标人进行资格审查","BD",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},938232,"资格预审的优点包括（ ）。",[68,70,72,74,76],{"key":20,"text":69,"correct":26},"减少公开招标多余的投标",{"key":24,"text":71,"correct":26},"确保选择在技术、财务和管理各方面都能满足招标工程需要的投标人参加投标",{"key":28,"text":73,"correct":22},"可以减少投标人印制投标文件的数量",{"key":31,"text":75,"correct":26},"可以缩短招标工作周期",{"key":61,"text":77,"correct":26},"节省投标人费用","ABDE",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},938234,"建设工程施工合同文件包括：①协议书；②投标书；③中标通知书；④合同通用条款；⑤合同专用条款；⑥工程量清单。当各合同文件对同一事项的解释出现不一致时，优先解释顺序为（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"①-③-②-⑤-④-⑥",{"key":24,"text":86,"correct":22},"②-③-①-⑤-④-⑥",{"key":28,"text":88,"correct":22},"③-②-①-④-⑥-⑤",{"key":31,"text":90,"correct":22},"②-①-③-⑤-⑥-④",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},938235,"根据《标准材料采购招标文件》，除合同另有约定外，供货周期不超过( )个月的签约 合同价为固定价格。",[95,97,99,101],{"key":20,"text":96,"correct":22},"3",{"key":24,"text":98,"correct":22},"6",{"key":28,"text":100,"correct":26},"12",{"key":31,"text":102,"correct":22},"24",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},938236,"根据 FIDIC《施工合同条件》，业主提供支付担保期限至缺陷通知期满后（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"3 个月",{"key":24,"text":110,"correct":26},"6 个月",{"key":28,"text":112,"correct":22},"9 个月",{"key":31,"text":114,"correct":22},"12 个月",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},938237,"根据 FIDIC《施工合同条件》，承包商未能在规定的期限内修复缺陷部位，业主可雇佣他 人完成，费用从( )内扣除。",[119,121,123,125],{"key":20,"text":120,"correct":26},"保留金",{"key":24,"text":122,"correct":22},"工程进度款",{"key":28,"text":124,"correct":22},"预付款",{"key":31,"text":126,"correct":22},"履约保证金",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},938238,"根据《标准施工招标文件》(2007 年版)，下列关于工程开工的说法，错误的是( )。",[131,133,135,137],{"key":20,"text":132,"correct":22},"承包人应向监理人提交工程开工报审表，经监理人报发包人批准后执行",{"key":24,"text":134,"correct":26},"工期自监理人签发开工通知之日开始计算",{"key":28,"text":136,"correct":22},"因发包人原因造成开工通知未按合同约定日期发出的，发包人应承担责任",{"key":31,"text":138,"correct":22},"开工前，发包人应按照法律规定获得工程施工许可",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},938239,"合同一方不得把自己的意愿强加于另一方，这是合同管理( )原则的要求。",[143,145,147,149],{"key":20,"text":144,"correct":22},"诚实信用",{"key":24,"text":146,"correct":26},"平等自愿",{"key":28,"text":148,"correct":22},"等价有偿",{"key":31,"text":150,"correct":22},"公平公正",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":28,"analysis":33},938240,"承包人接受了竣工付款证书后，应被认为已无权再提出在合同工程( )所发生的任何索 赔。",[155,157,159,161],{"key":20,"text":156,"correct":22},"履约证书颁发前",{"key":24,"text":158,"correct":22},"履约证书颁发后",{"key":28,"text":160,"correct":26},"接收证书颁发前",{"key":31,"text":162,"correct":22},"接收证书颁发后",{"id":164,"libraryId":5,"type":48,"typeLabel":49,"stem":165,"options":166,"answer":177,"analysis":33},938241,"根据《标准设备采购招标文件》，合同约定买方对合同设备进行监造的，双方应按下列 ( )规定履行。",[167,169,171,173,175],{"key":20,"text":168,"correct":26},"卖方应免费为买方监造人员提供工作条件及便利",{"key":24,"text":170,"correct":26},"买方监造人员的交通、食宿费用由买方承担",{"key":28,"text":172,"correct":26},"卖方应提前 7 日将需要买方监造人员现场监造事项通知买方",{"key":31,"text":174,"correct":22},"买方监造人员对合同设备的监造，视为对合同设备质量的确认",{"key":61,"text":176,"correct":26},"在合同设备的制造过程中，买方可派出监造人员，对合同设备的生产制造进行监造","ABCE",{"id":179,"libraryId":5,"type":48,"typeLabel":49,"stem":180,"options":181,"answer":177,"analysis":33},938242,"2017 年版 FIDIC 合同条件的特点包括（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":26},"通用条件将索赔与争端区分开，并增加了争端预警机制",{"key":24,"text":185,"correct":26},"更具可操作性",{"key":28,"text":187,"correct":26},"强调工程师的中立性",{"key":31,"text":189,"correct":22},"对业主、承包商双方的职责、业务以及工程师的职权都作了更为严格而明确的规定",{"key":61,"text":191,"correct":26},"更加强调在风险与责任分配及各项处理程序上业主和承包商的对等关系",{"id":193,"libraryId":5,"type":48,"typeLabel":49,"stem":194,"options":195,"answer":205,"analysis":33},938243,"根据《国务院办公厅关于清理规范工程建设领域保证金的通知》(国办发[2016]49号)，对 建筑业企业在工程建设中需缴纳的保证金，除依法依规设立的( )外，其他保证金一律取消。",[196,198,199,201,203],{"key":20,"text":197,"correct":26},"投标保证金",{"key":24,"text":126,"correct":26},{"key":28,"text":200,"correct":26},"工程质量保证金",{"key":31,"text":202,"correct":26},"农民工工资保证金",{"key":61,"text":204,"correct":22},"预付款保证金","ABCD",{"id":207,"libraryId":5,"type":48,"typeLabel":49,"stem":208,"options":209,"answer":205,"analysis":33},938244,"下列关于合同生效的说法正确的是( )。",[210,212,214,216,218],{"key":20,"text":211,"correct":26},"依法成立的合同，自成立时生效",{"key":24,"text":213,"correct":26},"合同双方签字盖章的时间就是合同订立的时间",{"key":28,"text":215,"correct":26},"当事人采用合同书形式订立合同的，自双方当事人签字或盖章时合同成立",{"key":31,"text":217,"correct":26},"附生效条件的合同，自条件成就时生效",{"key":61,"text":219,"correct":22},"合同订立的时间就是合同生效的时间",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},938245,"根据《标准施工招标文件》(2007 年版)，发包人可向承包人提出费用和(或)工期索赔的 是( )。",[224,226,228,230],{"key":20,"text":225,"correct":22},"由于承包人原因导致工期延误",{"key":24,"text":227,"correct":22},"由于承包人的原因导致试运行失败的",{"key":28,"text":229,"correct":22},"属承包人原因造成的工程缺陷或损坏",{"key":31,"text":231,"correct":26},"承包人违约",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},938246,"设备买卖合同，卖方应根据合同约定的交付时间和批次在施工场地( )将合同设备交付 给买方。",[236,238,240,242],{"key":20,"text":237,"correct":22},"卸货后",{"key":24,"text":239,"correct":26},"车面上",{"key":28,"text":241,"correct":22},"卸货前",{"key":31,"text":243,"correct":22},"地面上",{"id":245,"libraryId":5,"type":48,"typeLabel":49,"stem":246,"options":247,"answer":258,"analysis":33},938247,"根据《标准设备采购招标文件》，关于开箱检验的表述正确的包括( )。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"合同设备交付后应进行开箱检验",{"key":24,"text":251,"correct":22},"开箱检验不在合同设备交付时进行，买方应在开箱检验 7 日前将开箱检验的时间和地点通 知卖方",{"key":28,"text":253,"correct":26},"在开箱检验中，买方和卖方应共同签署数量、外观检验报告",{"key":31,"text":255,"correct":26},"开箱检验不在合同设备交付时进行，应由买方负责按交货时外包装原样妥善保管",{"key":61,"text":257,"correct":26},"开箱检验的检验结果不能免除卖方依照合同约定对买方负有的任何义务或责任","ACDE",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},938248,"对于货物采购合同，如由于买方原因合同设备在三次考核中均未能达到技术性能考核指标，卖方有义务在验收款支付函签署后（ ）应买方要求提供相关技术服务，协助买方采取一切必要措施使合同设备达到技术性能考核指标。",[263,265,267,269],{"key":20,"text":264,"correct":22},"6 个月内",{"key":24,"text":266,"correct":26},"12 个月内",{"key":28,"text":268,"correct":22},"18 个月内",{"key":31,"text":270,"correct":22},"24 个月内",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},938249,"业主发出中标函的 28 天内，接到承包商提交的有效履约保证后，双方签署的法律性标准化格式文件，称为（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":26},"合同协议书",{"key":24,"text":278,"correct":22},"中标函",{"key":28,"text":280,"correct":22},"投标函",{"key":31,"text":282,"correct":22},"合同条件",{"id":284,"libraryId":5,"type":48,"typeLabel":49,"stem":285,"options":286,"answer":177,"analysis":33},938250,"关于工程项目合同体系的表述，正确的包括( )",[287,289,291,293,295],{"key":20,"text":288,"correct":26},"监理合同是委托合同的一种，监理合同的标的是服务",{"key":24,"text":290,"correct":26},"监理合同的标的是服务",{"key":28,"text":292,"correct":26},"施工合同即工程承包合同，施工合同是双务合同",{"key":31,"text":294,"correct":22},"材料采购合同的条款一般涉及材料的生产阶段",{"key":61,"text":296,"correct":26},"施工合同是工程建设质量控制、进度控制、投资控制的主要依据",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},938251,"根据《标准施工招标文件》(2007 年版)，下列合同文件内容不一致时，优先解释等级最高 的文件是( )。",[301,302,304,306],{"key":20,"text":276,"correct":26},{"key":24,"text":303,"correct":22},"中标通知书",{"key":28,"text":305,"correct":22},"投标函及其附录",{"key":31,"text":307,"correct":22},"合同条款",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},938252,"由监理人委派常驻施工现场对合同进行实施管理的全权负责人是( )。",[312,314,316,318],{"key":20,"text":313,"correct":22},"监理工程师",{"key":24,"text":315,"correct":26},"总监理工程师",{"key":28,"text":317,"correct":22},"项目经理",{"key":31,"text":319,"correct":22},"技术负责人",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},938253,"下列关于工程隐蔽部位覆盖前的检查说法错误的是( )。",[324,326,328,330],{"key":20,"text":325,"correct":22},"工程隐蔽部位施工作业完成后，必须在覆盖前由承包人先行自检",{"key":24,"text":327,"correct":22},"工程隐蔽部位经监理人检查合格并签证后，才能进行下一道工序",{"key":28,"text":329,"correct":22},"承包人私自覆盖的工程，监理人有权指示承包人进行补检，无论结果如何，责任均由承包 人承担",{"key":31,"text":331,"correct":26},"由发包人提供的材料或工程设备不合格造成的工程不合格的，由发包人采取补救措施",{"id":333,"libraryId":5,"type":48,"typeLabel":49,"stem":334,"options":335,"answer":205,"analysis":33},938254,"下列关于发包人和承包人施工责任的说法，正确的是( )。",[336,338,340,342,344],{"key":20,"text":337,"correct":26},"发包人应对其现场机构雇佣的全部人员的工伤事故承担责任",{"key":24,"text":339,"correct":26},"由于承包人原因造成发包人人员工伤的，应由承包人承担责任",{"key":28,"text":341,"correct":26},"承包人应对其履行合同所雇佣的全部人员，包括分包人人员的工伤事故承担责任",{"key":31,"text":343,"correct":26},"由于发包人原因造成承包人人员工伤事故的，应由发包人承担责任",{"key":61,"text":345,"correct":22},"工程或工程的任何部分对土地的占用所造成的第三者财产损失，承包人应负责赔偿",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},938255,"第三者人员伤亡或财产损失，应由承包人负责赔偿的是( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"不可抗力导致发包人人员伤亡和其他财产损失",{"key":24,"text":353,"correct":22},"工程或工程的任何部分对土地的占用所造成的",{"key":28,"text":355,"correct":22},"由于发包人原因在施工场地内及其毗邻地带造成的",{"key":31,"text":357,"correct":26},"由于承包人原因在施工场地内及其毗邻地带造成的",{"id":359,"libraryId":5,"type":48,"typeLabel":49,"stem":360,"options":361,"answer":372,"analysis":33},938256,"关于工程计量的表述，正确的是( )。",[362,364,366,368,370],{"key":20,"text":363,"correct":26},"单价子目结算工程量是计量的工程量",{"key":24,"text":365,"correct":26},"总价子目的计量和支付应以总价为基础",{"key":28,"text":367,"correct":22},"单价子目的计量周期按批准的支付分解报告确定",{"key":31,"text":369,"correct":22},"总价子目已完成工程量按月计量",{"key":61,"text":371,"correct":26},"已标价工程量清单中的单价子目工程量为估算工程量","ABE",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":28,"analysis":33},938257,"承包人应在收到变更指示或变更意向书后的( )天内，向监理人提交变更报价书。",[377,379,381,383],{"key":20,"text":378,"correct":22},"56",{"key":24,"text":380,"correct":22},"7",{"key":28,"text":382,"correct":26},"14",{"key":31,"text":384,"correct":22},"28",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":20,"analysis":33},938258,"发包人应按照合同约定方式预留保证金，保证金总预留比例不得高于工程价款结算总额 的( )。",[389,391,393,395],{"key":20,"text":390,"correct":26},"3%",{"key":24,"text":392,"correct":22},"5%",{"key":28,"text":394,"correct":22},"10%",{"key":31,"text":396,"correct":22},"15%",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},938259,"根据《标准施工招标文件》(2007 年版)，发生( )违约情况时，承包人可书面通知发包 人解除合同。",[401,403,405,407],{"key":20,"text":402,"correct":22},"发包人未能按合同约定支付预付款或合同价款",{"key":24,"text":404,"correct":22},"发包人原因造成停工的",{"key":28,"text":406,"correct":22},"监理人无正当理由没有在约定期限内发出复工指示，导致承包人无法复工的",{"key":31,"text":408,"correct":26},"发包人无法继续履行或明确表示不履行或实质上已停止履行合同的",{"id":410,"libraryId":5,"type":48,"typeLabel":49,"stem":411,"options":412,"answer":205,"analysis":33},938260,"根据《标准施工招标文件》(2007 年版)，承包人按照合同约定解除合同的，发包人应在 解除合同后 28 天内向承包人支付下列( )金额。",[413,415,417,419,421],{"key":20,"text":414,"correct":26},"合同解除日以前所完成工作的价款",{"key":24,"text":416,"correct":26},"承包人为该工程施工订购并已付款的材料、工程设备和其他物品的金额",{"key":28,"text":418,"correct":26},"承包人撤离施工场地以及遣散承包人人员的金额",{"key":31,"text":420,"correct":26},"由于解除合同应赔偿的承包人损失",{"key":61,"text":422,"correct":22},"承包合同约定的利润金额",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":28,"analysis":33},938261,"根据《标准施工招标文件》(2007 年版)，承包人发生( )约定的违约情况时，发包人可 通知承包人立即解除合同。",[427,429,431,433],{"key":20,"text":428,"correct":22},"承包人违反合同约定，私自将合同的全部或部分权利转让给其他人",{"key":24,"text":430,"correct":22},"承包人私自将已按合同约定进入施工场地的施工设备撤离施工场地",{"key":28,"text":432,"correct":26},"承包人无法继续履行或明确表示不履行或实质上已停止履行合同",{"key":31,"text":434,"correct":22},"承包人未能按合同进度计划及时完成合同约定的工作，已造成工期延误",{"id":436,"libraryId":5,"type":48,"typeLabel":49,"stem":437,"options":438,"answer":449,"analysis":33},938262,"根据《标准施工招标文件》(2007 年版)，下列关于解决合同争议的说法，正确的有( )。",[439,441,443,445,447],{"key":20,"text":440,"correct":26},"在争议评审、仲裁或诉讼过程中，发包人和承包人均可共同努力友好协商解决争议",{"key":24,"text":442,"correct":26},"发包人和承包人应在开工日后的 28 天内或在争议发生后，协商成立争议评审组",{"key":28,"text":444,"correct":26},"争议评审组的评审意见并不具有法律强制性",{"key":31,"text":446,"correct":22},"友好协商解决不成的，才可以向人民法院提起诉讼",{"key":61,"text":448,"correct":22},"合同中可同时将仲裁和诉讼约定为解决争议的方式","ABC",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},938263,"除合同另有约定外，卖方按合同约定交付全部合同设备后，买方在收到卖方提交的全部 单据并经审核无误后 28 日内，向卖方支付合同价格的( )。",[454,455,457,459],{"key":20,"text":394,"correct":22},{"key":24,"text":456,"correct":26},"60%",{"key":28,"text":458,"correct":22},"25%",{"key":31,"text":392,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},938264,"根据《标准设备采购招标文件》，合同范围内提供的备品备件能够满足合同设备在( ) 结束前正常运行及维修的需要。",[464,466,468,470],{"key":20,"text":465,"correct":22},"设计使用寿命期",{"key":24,"text":467,"correct":22},"缺陷责任期",{"key":28,"text":469,"correct":26},"质量保证期",{"key":31,"text":471,"correct":22},"保修期",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},938265,"根据《标准设备采购招标文件》，合同一方不履行合同义务、履行合同义务不符合约定 或者违反合同项下所作保证的，应向对方承担的违约责任不包括( )。",[476,478,480,482],{"key":20,"text":477,"correct":22},"采取补救措施",{"key":24,"text":479,"correct":22},"继续履行",{"key":28,"text":481,"correct":26},"支付违约金",{"key":31,"text":483,"correct":22},"赔偿损失",{"id":485,"libraryId":5,"type":48,"typeLabel":49,"stem":486,"options":487,"answer":205,"analysis":33},938266,"根据《标准勘察招标文件》，发包人要求勘察人进行( )时，相应费用不含在合同 价格之中，由发包人另行支付。",[488,490,492,494,496],{"key":20,"text":489,"correct":26},"试验检测",{"key":24,"text":491,"correct":26},"外出考察",{"key":28,"text":493,"correct":26},"专项咨询",{"key":31,"text":495,"correct":26},"专家评审",{"key":61,"text":497,"correct":22},"环境保护",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},938267,"根据《标准勘察招标文件》，勘察责任为( )终身责任制。",[502,504,506,507],{"key":20,"text":503,"correct":22},"发包人代表",{"key":24,"text":505,"correct":26},"勘察单位项目负责人",{"key":28,"text":315,"correct":22},{"key":31,"text":508,"correct":22},"勘察单位代表",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},938268,"根据 FIDIC《施工合同条件》，承包商提供的履约担保为不需要由( )确认违约的无条 件担保。",[513,515,517,519],{"key":20,"text":514,"correct":22},"咨询工程师",{"key":24,"text":516,"correct":22},"项目业主",{"key":28,"text":518,"correct":26},"承包商",{"key":31,"text":520,"correct":22},"出具履约担保的金融机构",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},938269,"根据 FIDIC 施工合同条件，履约担保的保证期限应到( )为止。",[525,527,529,531],{"key":20,"text":526,"correct":22},"工程实质性竣工",{"key":24,"text":528,"correct":22},"颁发工程接收证书",{"key":28,"text":530,"correct":26},"缺陷责任期满",{"key":31,"text":532,"correct":22},"保留金达到扣留限额",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},938270,"根据 FIDIC《施工合同条件》，业主提供的支付担保期限至缺陷通知期满后( )。",[537,538,539,540],{"key":20,"text":108,"correct":22},{"key":24,"text":110,"correct":22},{"key":28,"text":112,"correct":26},{"key":31,"text":114,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},938271,"根据 FIDIC《施工合同条件》，承包商完成建造和保修任务后，对所有合格工程有权获得 的全部工程款称为( )。",[545,547,549,551],{"key":20,"text":546,"correct":26},"合同价格",{"key":24,"text":548,"correct":22},"接受的合同款额",{"key":28,"text":550,"correct":22},"合同结算价格",{"key":31,"text":552,"correct":22},"合同决算价格",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":28,"analysis":33},938272,"下列关于工程质量管理的表述，正确的是（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"发包人应在施工场地设置专门的质量检查机构",{"key":24,"text":560,"correct":22},"发包人应编制工程质量报表，报送监理人审查",{"key":28,"text":562,"correct":26},"发包人原因造成工程质量达不到合同约定验收标准的，应由发包人承担费用.利润",{"key":31,"text":564,"correct":22},"发包人还应按监理人指示，进行施工场地取样试验.工程复核测量和设备性能检测",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},938273,"缺陷责任期终止后（ ）天内，由监理人向承包人出具经发包人签认的缺陷责任期终止证书，并退还剩余的质量保证金。",[569,570,572,573],{"key":20,"text":382,"correct":26},{"key":24,"text":571,"correct":22},"21",{"key":28,"text":384,"correct":22},{"key":31,"text":574,"correct":22},"42",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":24,"analysis":33},938274,"下列关于 FIDIC 指定分包商的表述，正确的是（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"指定分包商不可由工程师选定",{"key":24,"text":582,"correct":26},"指定分包商不应与业主签订合同",{"key":28,"text":584,"correct":22},"由指定分包商与承包商不签订合同",{"key":31,"text":586,"correct":22},"指定分包商与一般分包商地位不等同",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},938276,"有关工程开工，下列说法正确的是（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"监理人应在开工日期 14 天前向承包人发出开工通知",{"key":24,"text":594,"correct":22},"工期自监理人发出的开工通知起计算",{"key":28,"text":596,"correct":26},"承包人向监理人提交工程开工报审表，经监理人审批后执行",{"key":31,"text":598,"correct":22},"开工报审表需说明质量保证措施",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":28,"analysis":33},938277,"缺陷责任期自（ ）起计算。",[603,605,607,609],{"key":20,"text":604,"correct":22},"验收合格之日",{"key":24,"text":606,"correct":22},"提交竣工验收申请报告",{"key":28,"text":608,"correct":26},"实际竣工日期",{"key":31,"text":610,"correct":22},"使用之日",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":20,"analysis":33},938278,"对于设备采购合同，卖方迟延交付 3.5 周，则每周违约金为合同设备价格的（ ）。",[615,617,619,621],{"key":20,"text":616,"correct":26},"0.5%",{"key":24,"text":618,"correct":22},"1.0%",{"key":28,"text":620,"correct":22},"1.5%",{"key":31,"text":622,"correct":22},"2.0%",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":31,"analysis":33},938279,"货物采购过程中，咨询工程师监造与检验的主要内容不包括（ ）。",[627,629,631,633],{"key":20,"text":628,"correct":22},"制定监造检验计划",{"key":24,"text":630,"correct":22},"组织召开协调会议",{"key":28,"text":632,"correct":22},"参加全面的质量验收",{"key":31,"text":634,"correct":26},"对入库货物的抽查检验",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":24,"analysis":33},938280,"勘察人的义务不包括（ ）。",[639,641,643,645],{"key":20,"text":640,"correct":22},"依法纳税",{"key":24,"text":642,"correct":26},"向承包人提供勘察资料",{"key":28,"text":644,"correct":22},"保证勘察作业规范、安全和环保",{"key":31,"text":646,"correct":22},"避免勘探对公众与他人的利益造成损害",[648,651,654,657,660,663],{"id":15,"name":649,"category":7,"favorite":650},"领导干部任职前廉政法规知识测试题",92,{"id":652,"name":653,"category":7,"favorite":15},595,"建筑结构与设备",{"id":655,"name":656,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":658,"name":659,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":661,"name":662,"category":7,"favorite":8},534,"BIM工程师",{"id":664,"name":662,"category":7,"favorite":8},535]