[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-606-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":631},{"id":5,"name":6,"category":7,"favorite":8},606,"工程项目组织与管理","建筑工程",0,1,50,1948,[13,33,45,57,69,79,91,102,114,126,138,150,159,168,177,189,201,211,223,235,243,255,267,279,290,298,310,322,334,346,364,379,394,407,420,435,450,464,478,492,506,521,534,545,559,571,583,595,607,619],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},937671,"单选题","（2012年真题）每个工程项目都有确定的起点和终点，这是工程项目的（ ）特征。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","唯一性",false,{"key":23,"text":24,"correct":25},"B","一次性",true,{"key":27,"text":28,"correct":21},"C","目的性",{"key":30,"text":31,"correct":21},"D","同一性","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},937672,"（2014年真题）对工程项目的可行性进行科学论证，是工程项目投资建设周期中（ ）阶段的主要任务。",[37,39,41,43],{"key":19,"text":38,"correct":25},"前期",{"key":23,"text":40,"correct":21},"准备",{"key":27,"text":42,"correct":21},"实施",{"key":30,"text":44,"correct":21},"运营",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":30,"analysis":32},937673,"（2018年真题）下列任务中，属于工程项目外部管理的是（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":21},"可行性研究",{"key":23,"text":52,"correct":21},"设计招标",{"key":27,"text":54,"correct":21},"施工图设计",{"key":30,"text":56,"correct":25},"项目备案",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":30,"analysis":32},937674,"（2014年真题）工程项目目标系统的建立工作包括：①提出项目目标；②项目构思；③识别要求；④建立目标系统。正确的顺序是（ ）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"①-②-③-④",{"key":23,"text":64,"correct":21},"③-②-④-①",{"key":27,"text":66,"correct":21},"③-①-②-④",{"key":30,"text":68,"correct":25},"②-③-①-④",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},937675,"（2014年真题）工程建设周期中，投入人力、物力、财力最多、管理难度也最大的阶段是（ ）阶段。",[73,75,76,78],{"key":19,"text":74,"correct":21},"竣工验收",{"key":23,"text":42,"correct":25},{"key":27,"text":77,"correct":21},"试生产",{"key":30,"text":40,"correct":21},{"id":80,"libraryId":5,"type":9,"typeLabel":15,"stem":81,"options":82,"answer":23,"analysis":32},937676,"（2013年真题）工程项目是为形成特定的生产能力或使用效能而进行投资的项目，这种投资建设必定形成（ ）。",[83,85,87,89],{"key":19,"text":84,"correct":21},"无形资产",{"key":23,"text":86,"correct":25},"固定资产",{"key":27,"text":88,"correct":21},"其他资产",{"key":30,"text":90,"correct":21},"D流动资产",{"id":92,"libraryId":5,"type":9,"typeLabel":15,"stem":93,"options":94,"answer":19,"analysis":32},937677,"（2018年真题）某工程项目建设周期较长，实施期间项目的建设条件和外部环境发生了变化，这体现了工程项目（ ）的特征。",[95,97,98,100],{"key":19,"text":96,"correct":25},"复杂性",{"key":23,"text":24,"correct":21},{"key":27,"text":99,"correct":21},"整体性",{"key":30,"text":101,"correct":21},"固定性",{"id":103,"libraryId":5,"type":9,"typeLabel":15,"stem":104,"options":105,"answer":23,"analysis":32},937678,"（2013年真题）对于政府直接投资的项目，政府的要求和期望不包括（ ）。",[106,108,110,112],{"key":19,"text":107,"correct":21},"质量合格",{"key":23,"text":109,"correct":25},"松弛的工作进度",{"key":27,"text":111,"correct":21},"投资适当",{"key":30,"text":113,"correct":21},"符合国家规划",{"id":115,"libraryId":5,"type":9,"typeLabel":15,"stem":116,"options":117,"answer":23,"analysis":32},937679,"（2014年真题）社会公众对垃圾处理建设项目的要求和期望不包括（ ）。",[118,120,122,124],{"key":19,"text":119,"correct":21},"无污染",{"key":23,"text":121,"correct":25},"收益高",{"key":27,"text":123,"correct":21},"有社会效益",{"key":30,"text":125,"correct":21},"服务优良",{"id":127,"libraryId":5,"type":9,"typeLabel":15,"stem":128,"options":129,"answer":19,"analysis":32},937680,"（2016年真题）下列属于工程项目业主自行管理模式的特点的是（ ）。",[130,132,134,136],{"key":19,"text":131,"correct":25},"可以随时采取措施以保障业主利益的最大化",{"key":23,"text":133,"correct":21},"可使整个工程提前投产，节约投资，减少投资风险，较早地取得收益",{"key":27,"text":135,"correct":21},"业主可以比较方便的提出设计和施工方面的变更",{"key":30,"text":137,"correct":21},"有利于减少设计变更",{"id":139,"libraryId":5,"type":9,"typeLabel":15,"stem":140,"options":141,"answer":30,"analysis":32},937681,"（2014年真题）从业主的角度看，传统的工程项目发包模式（设计—招标—建造模式）的主要优点是（ ）。",[142,144,146,148],{"key":19,"text":143,"correct":21},"设计过程中较多考虑了可施工性",{"key":23,"text":145,"correct":21},"项目实施周期较短",{"key":27,"text":147,"correct":21},"设计方和施工方责任明确",{"key":30,"text":149,"correct":25},"施工阶段易于掌控设计变更",{"id":151,"libraryId":5,"type":9,"typeLabel":15,"stem":152,"options":153,"answer":30,"analysis":32},937682,"（2007年真题）在每个工程项目的建设中，会因为建设条件的不同而涉及某些以前没有做过的事情。这反映出工程项目具有( )特征。",[154,155,156,157],{"key":19,"text":99,"correct":21},{"key":23,"text":101,"correct":21},{"key":27,"text":24,"correct":21},{"key":30,"text":158,"correct":25},"独特性",{"id":160,"libraryId":5,"type":9,"typeLabel":15,"stem":161,"options":162,"answer":19,"analysis":32},937683,"（2017年真题）工程项目区别于非工程项目最主要的特征是( )。",[163,164,165,166],{"key":19,"text":101,"correct":25},{"key":23,"text":99,"correct":21},{"key":27,"text":158,"correct":21},{"key":30,"text":167,"correct":21},"不确定性",{"id":169,"libraryId":5,"type":9,"typeLabel":15,"stem":170,"options":171,"answer":30,"analysis":32},937684,"（2013年真题）某公司在境外投资建设的大型水电项目因当地原因不得不中止，使公司蒙受巨大损失。可见工程项目具有( )特征。",[172,173,174,176],{"key":19,"text":24,"correct":21},{"key":23,"text":158,"correct":21},{"key":27,"text":175,"correct":21},"目标明确性",{"key":30,"text":96,"correct":25},{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":23,"analysis":32},937685,"（2014年真题）工程项目可分为工业项目、交通运输项目、农林水利项目等，这是按照( )进行分类的",[181,183,185,187],{"key":19,"text":182,"correct":21},"投资来源",{"key":23,"text":184,"correct":25},"产业领域",{"key":27,"text":186,"correct":21},"建设性质",{"key":30,"text":188,"correct":21},"经济特征",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":19,"analysis":32},937686,"（2012年真题）工程项目准备阶段的工作不包括( )",[193,195,197,199],{"key":19,"text":194,"correct":25},"进行可行性研究",{"key":23,"text":196,"correct":21},"编制项目概算",{"key":27,"text":198,"correct":21},"进行工程设计",{"key":30,"text":200,"correct":21},"签订承包合同",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":23,"analysis":32},937687,"（2011年真题）工程项目设计是工程项目( )阶段的工作内容",[205,207,208,210],{"key":19,"text":206,"correct":21},"策划和决策",{"key":23,"text":40,"correct":25},{"key":27,"text":209,"correct":21},"竣工验收和总结评价",{"key":30,"text":42,"correct":21},{"id":212,"libraryId":5,"type":9,"typeLabel":15,"stem":213,"options":214,"answer":23,"analysis":32},937688,"（2017年真题）对工程项目进行全面管理的中心的是( )。",[215,217,219,221],{"key":19,"text":216,"correct":21},"咨询工程师",{"key":23,"text":218,"correct":25},"业主",{"key":27,"text":220,"correct":21},"政府",{"key":30,"text":222,"correct":21},"承包商",{"id":224,"libraryId":5,"type":9,"typeLabel":15,"stem":225,"options":226,"answer":23,"analysis":32},937689,"（2017年真题）承包商对工程项目的要求和期望是( )。",[227,229,231,233],{"key":19,"text":228,"correct":21},"投资少，质量合格",{"key":23,"text":230,"correct":25},"利润优厚，及时付款",{"key":27,"text":232,"correct":21},"质量合格，运营正常",{"key":30,"text":234,"correct":21},"贷款安全，保证进度",{"id":236,"libraryId":5,"type":9,"typeLabel":15,"stem":237,"options":238,"answer":23,"analysis":32},937690,"（2013年真题）对于政府直接投资项目，政府的要求和期望不包括( )",[239,240,241,242],{"key":19,"text":107,"correct":21},{"key":23,"text":109,"correct":25},{"key":27,"text":111,"correct":21},{"key":30,"text":113,"correct":21},{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":30,"analysis":32},937691,"（2009年真题）在工程项目目标系统的建立过程中，进行工程项目环境分析是( )阶段的重要内容",[247,249,251,253],{"key":19,"text":248,"correct":21},"工程项目构思",{"key":23,"text":250,"correct":21},"识别需求",{"key":27,"text":252,"correct":21},"工作结构分解",{"key":30,"text":254,"correct":25},"提出项目目标",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":27,"analysis":32},937692,"（2010年真题）工程项目过程控制中，一般将项目过程分为( )两大类。",[259,261,263,265],{"key":19,"text":260,"correct":21},"项目决策过程与项目实施过程",{"key":23,"text":262,"correct":21},"项目设计过程与项目管理过程",{"key":27,"text":264,"correct":25},"产品创造过程与项目管理过程",{"key":30,"text":266,"correct":21},"项目计划过程与项目实施过程",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":30,"analysis":32},937693,"（2011年真题）关于项目管理的说法，正确的是( )。",[271,273,275,277],{"key":19,"text":272,"correct":21},"项目管理过程因项目的不同而完全不同",{"key":23,"text":274,"correct":21},"项目管理过程是创造项目产品的过程",{"key":27,"text":276,"correct":21},"项目管理过程以创造项目产品的过程为基础",{"key":30,"text":278,"correct":25},"创造项目产品的过程是项目管理的对象",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":30,"analysis":32},937694,"（2009年真题）明确实现目标的具体操作过程，是工程项目过程控制基本程序中( )阶段的工作。",[283,284,286,288],{"key":19,"text":42,"correct":21},{"key":23,"text":285,"correct":21},"检查",{"key":27,"text":287,"correct":21},"处理",{"key":30,"text":289,"correct":25},"计划",{"id":291,"libraryId":5,"type":9,"typeLabel":15,"stem":292,"options":293,"answer":27,"analysis":32},937695,"（2007年真题）对存在于项目中的各种技术界面和组织界面进行管理并做好记录的工作， 属于过程管理中的( )过程",[294,295,296,297],{"key":19,"text":285,"correct":21},{"key":23,"text":287,"correct":21},{"key":27,"text":42,"correct":25},{"key":30,"text":289,"correct":21},{"id":299,"libraryId":5,"type":9,"typeLabel":15,"stem":300,"options":301,"answer":27,"analysis":32},937696,"（2010年真题）工程项目过程控制中，典型的项目管理过程是( )。",[302,304,306,308],{"key":19,"text":303,"correct":21},"检查→计划→启动→实施→处理",{"key":23,"text":305,"correct":21},"计划→启动→实施→检查→处理",{"key":27,"text":307,"correct":25},"启动→计划→实施→检查→处理",{"key":30,"text":309,"correct":21},"启动→计划→检查→实施→处理",{"id":311,"libraryId":5,"type":9,"typeLabel":15,"stem":312,"options":313,"answer":23,"analysis":32},937697,"（2011年真题）关于 PDCA 循环的说法，错误的是( )。",[314,316,318,320],{"key":19,"text":315,"correct":21},"PDCA是一个合乎逻辑的工作程序",{"key":23,"text":317,"correct":25},"PDCA的基本原理是目标系统管理",{"key":27,"text":319,"correct":21},"PDCA循环需要运行多次才能完成",{"key":30,"text":321,"correct":21},"PDCA呈阶梯式上升的趋势",{"id":323,"libraryId":5,"type":9,"typeLabel":15,"stem":324,"options":325,"answer":27,"analysis":32},937698,"（2013年真题）工程项目组织系统由（ ）的人员、单位和部门构成。",[326,328,330,332],{"key":19,"text":327,"correct":21},"从事项目决策管理工作",{"key":23,"text":329,"correct":21},"从事政府相关管理工作",{"key":27,"text":331,"correct":25},"负责完成项目工作分解结构中各项工作",{"key":30,"text":333,"correct":21},"承担项目资金筹措任务",{"id":335,"libraryId":5,"type":9,"typeLabel":15,"stem":336,"options":337,"answer":19,"analysis":32},937699,"（2012年真题）国际标准化与国际咨询师联合会均推荐采用的项目过程管理方法是（ ）。",[338,340,342,344],{"key":19,"text":339,"correct":25},"计划→实施→检查→处理",{"key":23,"text":341,"correct":21},"计划→指挥→监督→检查",{"key":27,"text":343,"correct":21},"指挥→监督→运转→协调",{"key":30,"text":345,"correct":21},"计划→沟通→指挥→协调",{"id":347,"libraryId":5,"type":348,"typeLabel":349,"stem":350,"options":351,"answer":363,"analysis":32},937700,2,"多选题","（2018年真题）下列工作中，属于创造项目产品过程的有（ ）。",[352,354,356,358,360],{"key":19,"text":353,"correct":25},"项目策划",{"key":23,"text":355,"correct":25},"项目设计",{"key":27,"text":357,"correct":25},"项目施工",{"key":30,"text":359,"correct":21},"项目控制",{"key":361,"text":362,"correct":25},"E","项目验收","ABCE",{"id":365,"libraryId":5,"type":348,"typeLabel":349,"stem":366,"options":367,"answer":378,"analysis":32},937701,"（2011年真题）进行工程项目管理时，应考虑（ ）的影响。",[368,370,372,374,376],{"key":19,"text":369,"correct":25},"法律与政治环境",{"key":23,"text":371,"correct":21},"项目主管部门",{"key":27,"text":373,"correct":21},"项目资金条件",{"key":30,"text":375,"correct":25},"社会、经济、文化",{"key":361,"text":377,"correct":25},"标准规范约束","ADE",{"id":380,"libraryId":5,"type":348,"typeLabel":349,"stem":381,"options":382,"answer":393,"analysis":32},937702,"（2017年真题）下列关于工程项目管理的说法，错误的有（ ）。",[383,385,387,389,391],{"key":19,"text":384,"correct":21},"工程项目管理是一种多主体的管理活动",{"key":23,"text":386,"correct":21},"政府主要通过法律法规和行政许可等手段对工程项目实施管理",{"key":27,"text":388,"correct":25},"政府的项目管理是工程项目管理的核心",{"key":30,"text":390,"correct":25},"设计方项目管理的客体是项目从提出设想到竣工、交付使用的全部工作",{"key":361,"text":392,"correct":21},"组织文化、结构和流程、人力资源状况属于工程项目管理的内部环境","CD",{"id":395,"libraryId":5,"type":348,"typeLabel":349,"stem":396,"options":397,"answer":406,"analysis":32},937703,"（2018年真题）下列项目管理任务中，属于《项目管理知识体系指南（PMBOK）》所述项目管理过程的有（ ）。",[398,400,401,403,404],{"key":19,"text":399,"correct":25},"项目启动",{"key":23,"text":355,"correct":21},{"key":27,"text":402,"correct":25},"项目计划",{"key":30,"text":359,"correct":25},{"key":361,"text":405,"correct":21},"项目投产运营","ACD",{"id":408,"libraryId":5,"type":348,"typeLabel":349,"stem":409,"options":410,"answer":419,"analysis":32},937704,"（2016年真题）由于工程项目具有（ ）等特点，因此其过程控制具有动态特征。",[411,412,413,415,417],{"key":19,"text":24,"correct":25},{"key":23,"text":101,"correct":25},{"key":27,"text":414,"correct":25},"诸多因素带有不确定性",{"key":30,"text":416,"correct":21},"多样性",{"key":361,"text":418,"correct":21},"特殊性","ABC",{"id":421,"libraryId":5,"type":348,"typeLabel":349,"stem":422,"options":423,"answer":434,"analysis":32},937705,"（2013年真题）建立工程项目目标系统，确定可执行目标一般是在项目的（ ）。",[424,426,428,430,432],{"key":19,"text":425,"correct":21},"建议书阶段",{"key":23,"text":427,"correct":25},"可行性研究阶段",{"key":27,"text":429,"correct":21},"机会研究阶段",{"key":30,"text":431,"correct":25},"技术设计阶段",{"key":361,"text":433,"correct":21},"竣工验收阶段","BD",{"id":436,"libraryId":5,"type":348,"typeLabel":349,"stem":437,"options":438,"answer":449,"analysis":32},937706,"（2016年真题）工程项目不同于一般项目的特点有（ ）。",[439,441,443,445,447],{"key":19,"text":440,"correct":25},"工程项目交易的复杂性",{"key":23,"text":442,"correct":25},"工程项目组织的复杂性",{"key":27,"text":444,"correct":25},"工程项目环境的复杂性",{"key":30,"text":446,"correct":25},"工程项目生产过程的复杂性",{"key":361,"text":448,"correct":21},"工程项目费用的巨大性","ABCD",{"id":451,"libraryId":5,"type":348,"typeLabel":349,"stem":452,"options":453,"answer":393,"analysis":32},937707,"（2011年真题）下列项目中，能称为工程项目的有( )。",[454,456,458,460,462],{"key":19,"text":455,"correct":21},"大型国产新飞机研制项目",{"key":23,"text":457,"correct":21},"“神六”发射项目",{"key":27,"text":459,"correct":25},"国家体育场建设项目",{"key":30,"text":461,"correct":25},"武广铁路客运专线建设项目",{"key":361,"text":463,"correct":21},"国庆60周年阅兵项目",{"id":465,"libraryId":5,"type":348,"typeLabel":349,"stem":466,"options":467,"answer":449,"analysis":32},937708,"（2016年真题）工程项目建设周期可分为( )。",[468,470,472,474,476],{"key":19,"text":469,"correct":25},"前期阶段",{"key":23,"text":471,"correct":25},"准备阶段",{"key":27,"text":473,"correct":25},"实施阶段",{"key":30,"text":475,"correct":25},"投产运营阶段",{"key":361,"text":477,"correct":21},"决策阶段",{"id":479,"libraryId":5,"type":348,"typeLabel":349,"stem":480,"options":481,"answer":419,"analysis":32},937709,"（2012年真题）下列工作中，属于工程项目前期阶段工作的有( )",[482,484,486,488,490],{"key":19,"text":483,"correct":25},"项目可行性研究",{"key":23,"text":485,"correct":25},"项目评估与决策",{"key":27,"text":487,"correct":25},"投资机会研究",{"key":30,"text":489,"correct":21},"项目初步设计",{"key":361,"text":491,"correct":21},"项目施工图设计",{"id":493,"libraryId":5,"type":348,"typeLabel":349,"stem":494,"options":495,"answer":393,"analysis":32},937710,"（2014年真题）下列工作中，属于工程项目实施阶段的有( )。",[496,498,500,502,504],{"key":19,"text":497,"correct":21},"项目征地",{"key":23,"text":499,"correct":21},"概算编制",{"key":27,"text":501,"correct":25},"工程施工",{"key":30,"text":503,"correct":25},"联动试车",{"key":361,"text":505,"correct":21},"生产运营",{"id":507,"libraryId":5,"type":348,"typeLabel":349,"stem":508,"options":509,"answer":520,"analysis":32},937711,"（2008年真题）工程项目管理处于多种因素构成的复杂环境中，必须考虑( )等多方面的影响。",[510,512,514,516,518],{"key":19,"text":511,"correct":25},"上级组织",{"key":23,"text":513,"correct":21},"竞争对手",{"key":27,"text":515,"correct":25},"社会经济、文化、政治、法律",{"key":30,"text":517,"correct":21},"项目管理论的发展",{"key":361,"text":519,"correct":25},"标准规范和规程的约束","ACE",{"id":522,"libraryId":5,"type":348,"typeLabel":349,"stem":523,"options":524,"answer":533,"analysis":32},937712,"（2009年真题）项目管理知识体系(PRINCE2)涉及了 8 类管理要素，包括( )等。",[525,526,527,529,531],{"key":19,"text":399,"correct":21},{"key":23,"text":289,"correct":25},{"key":27,"text":528,"correct":25},"风险管理",{"key":30,"text":530,"correct":25},"组织",{"key":361,"text":532,"correct":21},"项目交付","BCD",{"id":535,"libraryId":5,"type":348,"typeLabel":349,"stem":536,"options":537,"answer":449,"analysis":32},937713,"（2010年真题）建立工程项目目标系统时应作的主要工作有( )",[538,539,540,541,543],{"key":19,"text":248,"correct":25},{"key":23,"text":250,"correct":25},{"key":27,"text":254,"correct":25},{"key":30,"text":542,"correct":25},"建立目标系统",{"key":361,"text":544,"correct":21},"提出项目申请",{"id":546,"libraryId":5,"type":348,"typeLabel":349,"stem":547,"options":548,"answer":520,"analysis":32},937714,"（2006年真题）创造项目产品的过程是实现项目产品的( )的过程。",[549,551,553,555,557],{"key":19,"text":550,"correct":25},"功能",{"key":23,"text":552,"correct":21},"效益",{"key":27,"text":554,"correct":25},"质量",{"key":30,"text":556,"correct":21},"效率",{"key":361,"text":558,"correct":25},"特性",{"id":560,"libraryId":5,"type":9,"typeLabel":15,"stem":561,"options":562,"answer":30,"analysis":32},937715,"（2017年真题）下列关于项目经理的说法，错误的是（ ）。",[563,565,567,569],{"key":19,"text":564,"correct":21},"项目经理是项目的直接领导和组织者",{"key":23,"text":566,"correct":21},"项目经理可以从公司内部产生，也可以从外部选聘",{"key":27,"text":568,"correct":21},"项目经理是对项目进行全过程管理控制的关键",{"key":30,"text":570,"correct":25},"项目经理接受项目任务后首先应开展的工作是编制项目工作计划",{"id":572,"libraryId":5,"type":9,"typeLabel":15,"stem":573,"options":574,"answer":27,"analysis":32},937716,"（2013年真题）项目团队工作开始进入有序化状态是在团队发展过程经过（ ）之后。",[575,577,579,581],{"key":19,"text":576,"correct":21},"休整阶段",{"key":23,"text":578,"correct":21},"规范阶段",{"key":27,"text":580,"correct":25},"磨合阶段",{"key":30,"text":582,"correct":21},"表现阶段",{"id":584,"libraryId":5,"type":9,"typeLabel":15,"stem":585,"options":586,"answer":23,"analysis":32},937717,"（2017年真题）扩展完善后的马斯洛需要层次理论将人的需要划分为（ ）个层次。",[587,589,591,593],{"key":19,"text":588,"correct":21},"五",{"key":23,"text":590,"correct":25},"七",{"key":27,"text":592,"correct":21},"九",{"key":30,"text":594,"correct":21},"十",{"id":596,"libraryId":5,"type":9,"typeLabel":15,"stem":597,"options":598,"answer":19,"analysis":32},937718,"（2017年真题）员工对自己获得的报酬是否满意不仅要看绝对值，还要看相对值，要与自己过去的情况进行纵向比较，也与别人进行横向比较，当比值相等时，员工就会感到满意，这在团队建设与管理上称为（ ）。",[599,601,603,605],{"key":19,"text":600,"correct":25},"公平理论",{"key":23,"text":602,"correct":21},"成就需要理论",{"key":27,"text":604,"correct":21},"双因素理论",{"key":30,"text":606,"correct":21},"需求层次理论",{"id":608,"libraryId":5,"type":9,"typeLabel":15,"stem":609,"options":610,"answer":23,"analysis":32},937719,"（2014年真题）在工程项目团队组织计划中，团队成员应该履行的工作称为（ ）。",[611,613,615,617],{"key":19,"text":612,"correct":21},"角色",{"key":23,"text":614,"correct":25},"职责",{"key":27,"text":616,"correct":21},"职权",{"key":30,"text":618,"correct":21},"能力",{"id":620,"libraryId":5,"type":9,"typeLabel":15,"stem":621,"options":622,"answer":19,"analysis":32},937720,"（2014年真题）工程项目组织计划中，项目内各组织单元之间的职责与职务相互交叉的分工与衔接是（ ）。",[623,625,627,629],{"key":19,"text":624,"correct":25},"组织界面",{"key":23,"text":626,"correct":21},"技术界面",{"key":27,"text":628,"correct":21},"组织机构",{"key":30,"text":630,"correct":21},"组织配备",[632,635,638,641,644,647],{"id":9,"name":633,"category":7,"favorite":634},"领导干部任职前廉政法规知识测试题",92,{"id":636,"name":637,"category":7,"favorite":9},595,"建筑结构与设备",{"id":639,"name":640,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":642,"name":643,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":645,"name":646,"category":7,"favorite":8},534,"BIM工程师",{"id":648,"name":646,"category":7,"favorite":8},535]