[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939633":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},939633,606,1,"单选题","关于“代建制”实施方式的说法，错误的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","“代建制”可以采用“委托代理合同”的运作模式",false,{"key":16,"text":17,"correct":14},"B","“代建制”的实施方式分为全过程代建和两阶段代建",{"key":19,"text":20,"correct":14},"C","“代建制”是一种特殊的项目管理方式",{"key":22,"text":23,"correct":24},"D","对经营性政府投资项目加快推行“代建制”",true,"对非经营性政府投资项目加快推行“代建制”。“代建制”是一种特殊的项目管理方式。目前，“代建制”的运作模式主要有以下两种：(1)“委托代理合同”模式。(2)以常设性事业单位为主，实行相对集中的专业化管理。 从工程项目的代建范围来划分，“代建制”的实施方式分为全过程代建和两阶段代建。两阶段代建，即将建设项目分为项目前期工作阶段代建和项目建设实施阶段代建。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]