[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939624":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939624,606,2,"多选题","关于项目实施阶段，下列说法正确的是（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","该阶段形成工程实物形态，实现投资决策目标",true,{"key":16,"text":17,"correct":18},"B","该阶段提出的指标性目标，对项目效益影响大",false,{"key":20,"text":21,"correct":14},"C","竣工验收属于该阶段的工作",{"key":23,"text":24,"correct":14},"D","工程项目试生产正常并经业主验收后，该阶段即告结束",{"key":26,"text":27,"correct":14},"E","该阶段工程项目管理的难度最大","ACDE","本题考查的是工程项目各阶段主要工作内容。选项 B 错误，工程项目前期阶段提出的指标性目标，对项目效益影响大。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]