[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939623":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939623,606,2,"多选题","工程项目前期阶段的主要工作包括（ ）",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","投资机会研究",true,{"key":16,"text":17,"correct":14},"B","可行性研究",{"key":19,"text":20,"correct":14},"C","项目评估及决策",{"key":22,"text":23,"correct":24},"D","初步设计",false,{"key":26,"text":27,"correct":24},"E","建设条件准备","ABC","本题考查的是工程项目各阶段主要工作内容。工程项目前期阶段的主要工作包括投资机会研究、初步可行性研究、可行性研究、项目评估及决策等。该阶段的主要任务是对工程项目投资的必要性、可能性、可行性、合理性，以及何时投资、在何地建设、如何实施等重大问题，进行科学论证和多方案比较。本阶段虽然投入少，但对项目效益影响大，前期决策的失误往往会导致重大的投资损失。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]