[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939576":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},939576,606,1,"单选题","工程可以提前投产，能节约投资，减少投资风险，较早地取得收益的管理模式是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","PM",false,{"key":16,"text":17,"correct":18},"B","CM",true,{"key":20,"text":21,"correct":14},"C","DM",{"key":23,"text":24,"correct":14},"D","BOT","本题考查的是工程项目业主方管理模式。CM模式可以缩短工程项目从规划、设计到竣工的周期，整个工程可以提前投产，节约投资，减少投资风险，较早地取得收益",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]