[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939574":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},939574,606,1,"单选题","有关 PDCA 循环说法，不正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","PDCA 循环方法是过程管理的基本方法",false,{"key":16,"text":17,"correct":14},"B","PDCA 适应于任何一项工作",{"key":19,"text":20,"correct":21},"C","PDCA 在同一水平上循环",true,{"key":23,"text":24,"correct":14},"D","PDCA 呈阶梯式上升的趋势","本题考查的是工程项目管理的基本原理。PDCA 循环不是在同一水平上循环",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]