[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939567":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},939567,606,1,"单选题","（ ）描述了以一种逻辑性的、有组织的方法，按照明确的步骤对项目进行管理的方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","PMBOK",false,{"key":16,"text":17,"correct":18},"B","PRINCE2",true,{"key":20,"text":21,"correct":14},"C","ICB",{"key":23,"text":24,"correct":14},"D","FIDIC","本题考查的是国际上常用的工程项目管理知识体系。PRINCE2 描述了以一种逻辑性的、有组织的方法，按照明确的步骤对项目进行管理的方法。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]