[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939564":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},939564,606,1,"单选题","（ ）会给既定的建设目标带来风险",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","固定性",false,{"key":16,"text":17,"correct":14},"B","不可逆转性",{"key":19,"text":20,"correct":14},"C","复杂性",{"key":22,"text":23,"correct":24},"D","不确定性",true,"本题考查的是工程项目的概念。一个工程项目从策划到建设完成往往需要几年时间，有的甚至更长，建设过程中涉及面广，各种情况复杂多变，不确定性大。不确定性会给既定的建设目标带来风险。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]