[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939552":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},939552,606,1,"单选题","工程项目准备阶段的工作不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","进行可行性研究",true,{"key":16,"text":17,"correct":18},"B","编制项目概算",false,{"key":20,"text":21,"correct":18},"C","进行工程设计",{"key":23,"text":24,"correct":18},"D","签订承包合同","本题考查的是工程项目各阶段主要工作内容。选项A为前期阶段工作。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]