[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939521":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},939521,606,1,"单选题","开展工程项目安全预评价工作，应根据（ ）选择相应的评价方法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","被评价对象的重要性",false,{"key":16,"text":17,"correct":14},"B","有害因素导致事故的可能性",{"key":19,"text":20,"correct":21},"C","被评价对象的特点",true,{"key":23,"text":24,"correct":14},"D","事故可能的严重程度","本题考查的是工程项目前期阶段的安全管理。开展工程项目安全预评价工作，应根据被评价对象的特点选择相应的评价方法。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]