[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939496":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},939496,606,1,"单选题","工程项目职业健康管理中的“三同时”制度是指在我国建设的各类工程，职业健康安 全设施必须与主体工程( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","同时立项、同时实施、同时投产使用",false,{"key":16,"text":17,"correct":14},"B","同时立项、同时实施、同时验收交付",{"key":19,"text":20,"correct":21},"C","同时设计、同时施工、同时投产使用",true,{"key":23,"text":24,"correct":14},"D","同时设计、同时施工、同时验收交付","“三同时”制度——是指凡在我国境内新建、改建、扩建的基本建设项目、技术改 建项目和引进的建设项目，其职业健康设施必须符合国家规定的标准，必须与主体工程同时 设计、同时施工、同时投入生产和使用。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]