[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939468":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939468,606,2,"多选题","在施工计划的实施阶段，管理工作主要有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","编制施工计划",false,{"key":16,"text":17,"correct":18},"B","建立生产责任制",true,{"key":20,"text":21,"correct":18},"C","开展教育培训",{"key":23,"text":24,"correct":18},"D","进行技术交底",{"key":26,"text":27,"correct":14},"E","进行施工策划","BCD","施工计划的实施包括①建立和执行生产管理制度，②开展教育培训， ③进行技术交底等工作。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]